Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
Released 31 July 2026
QUARTERLY ACTIVITIES
REPORT
JUNE 2026
ASX Announcement
Released 30 June 2026
ASX:I88
ASX Announcement
Released 31 July 2026
Quarterly Activities Report
for the Period Ending 30 June 2026
► Maiden diamond drilling commenced at the Reynolds Lake and Reitenbach Lake Uranium Projects in
Saskatchewan, marking the first drill testing of a large, unexplored prospective uranium system on the
eastern margin of the Athabasca Basin.
► Drill targeting at Reynolds and Reitenbach Lake designed to systematically test the coincidence of EM
conductors, magnetic lows, structural corridors and uranium geochemical anomalism, with a key focus
on the high‑grade 1.90% U3O8 Titus Prospect.
► Final assays of Portland Creek Phase 2 drilling program confirmed elevated uranium anomalism over
more than 6 km of strike, supporting the interpretation of a structurally controlled, district‑scale
hydrothermal uranium system.
► Portland Creek helicopter‑supported airborne TDEM and magnetic survey was flown over 2,230 line‑km,
delivering the first modern project‑wide EM and magnetic coverage to advance structural interpretation
and drill targeting.
► The Company remains well funded for high-impact exploration across its Canadian uranium portfolio,
closing the Quarter with cash of $6.364 million.
To learn more about this announcement, click here.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to report on its activities for the quarter ended
30 June 2026 (the “Quarter”). During the Quarter, the Company advanced its Canadian uranium portfolio through the
commencement of a maiden diamond drilling program at the Reynolds Lake and Reitenbach Lake Uranium Projects in
Saskatchewan and the completion of a project‑wide airborne EM and magnetic survey at the flagship Portland Creek
Uranium Project in Newfoundland.
At Reynolds Lake and Reitenbach Lake, the maiden drill program commenced targeting high‑priority zones where EM
conductors, magnetic lows, structural corridors and uranium geochemical anomalism coincide, including the high‑grade
1.90% U3O8 Titus Prospect. This drilling represents the first test of a large, underexplored and highly prospective potential
uranium system on the eastern margin of the Athabasca Basin, marking a key milestone as the projects transition from
target generation to drill testing.
At Portland Creek, Infini completed 2,230 line‑km of helicopter‑supported airborne EM and magnetic surveying over
approximately 252 km2 of its tenement package and received the final laboratory assays from its 5,310m, 17‑hole Phase 2
diamond drilling program. Integration of the structural and assay datasets has confirmed uranium enrichment over more
than 6 km of strike within a structurally controlled hydrothermal system, significantly improving the geological model and
directly informing the design of an expanded 5,000m Phase 3 drilling program targeted to commence in Q3 CY2026.
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
Summary of Exploration Activities
Portland Creek Uranium Project (100% owned, Newfoundland Canada)
The Portland Creek Uranium Project spans 328 km2 and lies within the Precambrian Long-Range Complex of the Humber
Tectonic-Stratigraphic Zone. The geology consists of metaquartzite and a suite of paragneisses, intruded by leucocratic
granite, which are believed to have been thrust westward over Paleozoic carbonate-dominant sediments.
The project area covers large regional uranium anomalies, first identified in the 1970’s through a Newfoundland government
lake-sediment sampling program. A uranium showing was recorded in the Newfoundland Mineral Deposit Index, reporting
2,180 ppm U3O8. Compilation of historic and recent exploration data has delineated a ~6 km zone of anomalous uranium
and radon gas responses across lake sediments, soils and airborne radiometric datasets. This anomalism closely follows
a prominent fault scarp, marking the edge of a granitic plateau interpreted as a deep-seated fault.
Since staking the project in 2023, the Company has rapidly advanced the project through multiple exploration phases in an
area that has been historically underexplored for uranium mineralisation. The Company has verified historical regional
uranium anomalies and completed a soil sampling grid over the Falls Lake Prospect. This work defined a ~800 m x 100 m
high-grade uranium surface anomaly, with a peak soil result of 74,997 ppm U3O8. This anomaly is located down-ice and
west of a 1.5 km radiometric anomaly. Additionally, Infini has identified a southern 500 m-wide cluster of high-grade soil
samples, which includes a peak of 1,500 ppm U3O8 and lies 1.5 km from the recently completed Phase 2 drill program.
Final Phase 2 Assays Confirm Shear-Hosted Exploration Model
During the Quarter, Infini received the final laboratory assay results from its completed 5,310m Phase 2 diamond drilling
program at Portland Creek, completing the full analytical dataset from 17 drillholes. These final assay results confirmed
elevated uranium anomalism, including up to 192 ppm U3O8 over 0.5m at 53m (PCDD25-022), across additional target
areas.
When combined with earlier assay batches, the complete Phase 2 dataset confirms uranium enrichment across more than
6 km of strike, reinforcing the interpretation of Portland Creek as a structurally controlled, multi-stage hydrothermal uranium
system developed within granite. Integration of the geochemical and structural datasets has significantly improved the
Company’s understanding of the controls on mineralisation, with uranium preferentially developed at intersections of key
fracture sets and associated hydrothermal alteration zones.
Project-Wide Airborne Geophysics Completed at Flagship Portland Creek Project
During the Quarter, Infini completed a project-wide airborne electromagnetic (EM) and magnetic survey at the Portland
Creek Uranium Project in Newfoundland, representing the first modern helicopter-supported geophysical survey across the
Project’s expanded tenement package. A total of 2,230 line km of surveying was completed over approximately 252 km2,
delivering a high-resolution dataset that significantly advances structural interpretation and uranium target generation
across the broader Project area.
Interpretation of the newly acquired data has provided important insights into the subsurface geological architecture at
Portland Creek. In particular, the magnetic dataset is being used to map major fault sets and structural intersections,
delineate resistive trends, and identify demagnetised zones that may reflect hydrothermal alteration within the granite host,
materially improving the Company’s geological model and sharpening target definition beyond areas tested to date.
The Company also commenced a 737 line-kilometre high-resolution airborne radiometric survey over a defined survey area
to complement the EM and magnetic datasets. Preliminary interpretation of the airborne magnetic, EM and radiometric data
is underway and is already providing significant insight into the subsurface geological framework at Portland Creek. The
combined geophysical dataset is being used to map major fault sets and structural intersections, delineate resistive trends,
and identify demagnetised and radiometrically anomalous zones that may reflect hydrothermal alteration within the granite
host. To refine target generation, these geophysical interpretations are being cross-referenced with historical lake sediment
and soil geochemistry data, as well as results from the Company’s Phase 1 and Phase 2 drill programs.
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
Field activities are scheduled to commence in Q3 CY2026 and will focus on ground-truthing priority geophysical targets
through mapping, sampling and prospecting, ahead of the planned commencement of the Phase 3 drill program later in Q3
CY2026. Collectively, these datasets materially help de-risk the next phase of exploration of this highly prospective potential
large-scale system of uranium mineralisation.
Figure 1: First modern helicopter-supported geophysical survey flown over 252 km2
of Infini’s tenements at Portland Creek, returning high
resolution electromagnetic (EM) and magnetic data to advance structural interpretation and targeting for the upcoming Phase 3 drill program.
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
Reynolds Lake and Reitenbach Lake Projects (100% owned, Saskatchewan Canada)
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 19 mineral claims covering a total footprint
of 677 km2 on the eastern outboard margin of the Athabasca Basin in northern Saskatchewan. The projects are contiguous,
with Reynolds Lake consisting of 12 claims (386 km2) and Reitenbach Lake consisting of 7 claims (291 km2) adjoining its
northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are bisected by the
crustal-scale Needle Falls Shear Zone, a major structural corridor separating the Wollaston Domain to the west from the
Peter Lake Domain to the east. The Wollaston Domain is dominated by Paleoproterozoic siliciclastic metasediments
including paragneiss, quartzite, and calc-silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic
granitoid gneisses and supracrustal rocks. Both domains are strongly deformed and metamorphosed, with northeast-
trending isoclinal folding and later cross-cutting north–south fault systems that provide structural complexity and potential
pathways for hydrothermal fluid flow.
Graphitic schists and gneisses, key lithologies known to host unconformity-associated uranium mineralisation, have been
identified within the project area and are spatially associated with electromagnetic conductors, radiometric anomalies and
elevated uranium-in-lake sediment samples. Recent exploration has confirmed primary uranium mineralisation at surface
at Reitenbach Lake, while petrographic analysis has validated a structurally prepared and hydrothermally altered basement
environment consistent with an unconformity-related uranium system.
Regionally, the geological setting is considered analogous to uranium systems at Eagle Point and Rabbit Lake, where
mineralisation occurs along graphitic shear zones at the boundary between Wollaston metasediments and granitoid
basement.
Figure 2: Location of the Reynolds Lake Reitenbach Uranium Projects relative to the world-renowned Athabasca Basin,
synonymous with high-grade uranium deposits, and in close proximity to existing operations, access and infrastructure.
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
Maiden Diamond Drilling Program Commenced at Reynolds Lake and Reitenbach Lake
During the Quarter, Infini commenced its maiden diamond drilling program at the Reynolds Lake and Reitenbach Lake
Uranium Projects in northern Saskatchewan, the first time these projects have ever been drill tested. The program
represents the initial drill test of a large, unexplored and highly prospective potential uranium system on the eastern margin
of the Athabasca Basin and marks a key milestone as the projects transition from target generation to systematic drill testing
of high‑conviction targets.
The program is focused on zones where multiple mineralisation vectors coincide, including EM conductors, magnetic lows,
structurally complex corridors and elevated uranium geochemical anomalism, with particular emphasis on the high‑grade
1.90% U3O8 Titus Prospect area. Drill collars have been positioned to test a range of structural settings, including conductor
intersections, demagnetised zones and interpreted dilation sites along key shear corridors, with the objective of maximising
technical information, rapidly vectoring toward the most prospective parts of the system and informing subsequent phases
of exploration at Reynolds Lake and Reitenbach Lake.
Figure 3: Indicative drillhole locations for the maiden diamond drilling program at Reynolds and Reitenbach Lake, targeting
priority EM anomalies where magnetic features, structural complexity and uranium geochemical anomalism coincide.
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
Des Herbiers Uranium Deposit (100% owned, Québec Canada)
The Des Herbiers Uranium Project consists of 66 non-contiguous claims totalling 36.25 km2. It is located within the Des
Herbiers township, approximately 9km NW of the Baie-Johan-Beetz municipality and 52km ENE of the municipality of Havre
St-Pierre on the Gulf of St. Lawrence in Quebec, Canada. The Project is situated in the Grenville Province of the Canadian
Shield. The rocks underlying the immediate area are comprised of biotite rich granitic rocks, quartzites and quartzo-
feldspathic gneisses that are derived from strongly metamorphosed sandstones and arkoses, amphibole rich gabbros and
gneisses. Regional structures trend north to northwest and display large-scale curvilinear folding. Historical exploration and
drilling have revealed an abundance of low grade, near surface, bulk tonnage uranium that contains a combined inferred
mineral resource of 162Mt @ 123ppm U3O8
1 reported in accordance with the JORC Code (2012).
No significant exploration activities were undertaken at the Des Herbiers Uranium Project during the reporting period.
Yeelirrie North Uranium Project (100% owned, Western Australia)
The Yeelirrie North Project currently consists of exploration licence E53/2188, E53/2368 and prospecting licence P53/1703,
covering an area of ~329km², located approximately 70km southwest of Wiluna, Western Australia. The Company currently
has three exploration licence applications in progress and if successfully granted, the remaining new exploration licence
applications will see the Company’s Project size increase to a total area of ~746km2. The Yeelirrie Project is located near
the northern extremity of the Archaean Norseman Wiluna greenstone belt of the Yilgarn Craton. The project is highly
prospective for hosting high-grade uranium mineralised calcrete and lies within the same geological domain as the world
class Yeelirrie Uranium Deposit hosting 128.1Mlb U3O8 at an average ore grade of 1,500 ppm U3O8
2.
No significant exploration activities were undertaken at the Yeelirrie North Uranium Project during the reporting period.
Bellah Bore East Uranium Deposit (100% owned, Western Australia)
The Bellah Bore East deposit is approximately 500m x 150m in size and located within prospecting license P 53/1703,
comprising 92.67 hectares. The licence is situated within the western edge of the Company’s already existing E 53/2188
tenement ~60km southwest of Wiluna (Yeelirrie Project). The deposit is hosted by calcrete and comprises a historical
inferred mineral resource in accordance with the JORC Code (2004) (it is noted that these exploration results reported
under the JORC 2004 code may not conform to the requirements of the JORC Code 2012). Mineralisation is reported as
open in the northeast. Carnotite is identified as the primary ore mineral in historical drilling.
No significant exploration activities were undertaken at the Bellah Bore East Uranium Project during the reporting period.
Tinco Uranium-Niobium Project (75% Tinco North, 100% Tinco South, Saskatchewan Canada)
The Tinco Uranium‑Niobium Project lies to the south‑southwest of the Athabasca Basin and is underlain by the Mudjatik
Domain, composed mainly of granitoid felsic gneisses that form the basement to narrow belts of supracrustal sedimentary
and volcanic rocks. Two principal uranium mineralisation styles have been recognised in the area, including remobilised
basement occurrences and supracrustal occurrences, with previous mapping identifying lenses of radioactive pegmatite up
to 1.5 m in width and historical grab samples grading up to 600 ppm U3O8 and 0.5% Nb. More recently, Infini’s heliborne
magnetic, radiometric and time‑domain electromagnetic survey has delineated magnetic and radiometric trends, major
structures and stratigraphic relationships, highlighting a prominent north–south trending shear zone hosting the historical
mineralised grab sample and several large ovoid magnetic features that together define a large U‑Nb target area for future
exploration and follow‑up surface geochemical work.
No significant exploration activities were undertaken at the Tinco Uranium-Niobium Project during the reporting period.
Paterson Lake Lithium Project (100% owned, Ontario Canada)
The Paterson Lake Project is located within the highly prospective Archean Separation Lake Greenstone Belt of the Superior
Province of Ontario, Canada. The Project has been documented to contain abundant rare-metal bearing pegmatites
including seven named petalite bearing pegmatites and up to 50 unnamed pegmatites that require investigation. Historical
outcrop grab sample results include results up to 4.43% Li2O and the best reported historical drill intercept to date of 8m
@ 3.12% Li2O. The Separation Rapids Lithium Deposit of Avalon Advanced Materials/Sibelco joint venture is located within
2km of the project boundary.
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
No significant exploration activities were undertaken at the Paterson Lake Lithium Project during the reporting period.
Valor Lithium Project (50% owned, earn-in up to 100%, Québec Canada)
The Valor Project covers an area of approximately 125km2 in southwest Québec, approximately 40km north-west of Val-
d’Or. The project is situated on the Archean Preissac Lacorne batholith, a syn-to post-tectonic intrusion that was emplaced
in the Southern Volcanic Zone of the Abitibi Greenstone Belt of the Superior Province of Québec. To the north the batholith
is bounded by the Manneville Fault and to the south by the Cadillac Fault and the eastward extension of the Porcupine
Destor Fault. The batholith, which is a composite body has associated pegmatites and quartz veins. After completing soil
sampling activities, the company has now identified several large scale LCT MMI geochemical anomalies.
No significant exploration activities were undertaken at the Valor Lithium Project during the reporting period.
Schedule of Mining Tenements
The Company’s tenement and claim schedule is provided in Appendix 1.
Summary of Corporate Activities
Personnel Changes
The Company advises that current Chief Financial Officer, Mr Paul Hughes will transition from his role with the Company,
effective 15 August 2026, and that Mr Jay Stephenson has been appointed Chief Financial Officer effective 1 August 2026.
Mr Stephenson will work alongside Mr Hughes during a transition period to support an orderly handover of responsibilities.
Mr Stephenson is an experienced finance executive with more than 35 years’ experience in business development and
corporate advisory roles, including approximately 29 years as a Director, Chief Financial Officer and Company Secretary
for various listed and unlisted entities in the resources sector and other industries in Australia and overseas. He holds a
Master of Business Administration and is a Chartered Accountant and Fellow of CPA Australia, a Chartered Professional
Accountant (Canada), a Certified Management Accountant (Canada), and a Fellow of the Governance Institute of Australia.
The Company would like to thank Paul for his contribution since joining the Company in February 2024, during a period of
significant exploration and corporate activity. We appreciate Paul’s support in assisting with an orderly transition process
and wish him all the best in his future endeavours. We also welcome Jay and look forward to working with him as the
Company continues to advance its growth strategies.
Finance
The Appendix 5B quarterly cashflow report for the quarter ended 30 June 2026 is submitted separately.
The Group closed the Quarter with a cash balance of $6.364 million. Exploration expenditure during the quarter totalled
$1,370k (unaudited).
Payments to Related Parties
Pursuant to section 6 of the Company Appendix 5B, and as required under ASX Listing Rule 5.3.5, during the Quarter the
Company paid $62k to the Directors for remuneration
Business Development
The Company intends to continue evaluating business development opportunities which are presented to the company and
align with its strategic objectives and complementary to its existing asset base. In addition to its focus on uranium-related
initiatives, the Company is reviewing projects across broader jurisdictions as it seeks to increase its position in the industry,
including under-explored or overlooked regions that may offer potential for the discovery of large-scale, high-quality
resources. These reviews are expected to focus on geological prospectivity, technical merit and jurisdictional factors, with
the objective of identifying opportunities that could enhance portfolio quality and long-term value creation. In parallel, the
Company is also evaluating emerging opportunities in in‑situ recovery (ISR) technologies that may be compatible with its
existing and future uranium project portfolio. All such opportunities will remain subject to further technical, commercial and
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
strategic assessment, and there is no certainty that these forward-looking reviews or discussions will result in the acquisition
of any additional projects, technologies or assets.
Capital Structure
The Capital Structure at the end of the Quarter is as follows:
Table 1: Capital Structure as at 30 June 2026
Securities Number
Shares 108,207,236
Options 42,852,588
Performance Rights 2,061,189
References
1. ASX Announcement 10 January 2024, Infini Resources Limited Prospectus.
2. Cameco Website, Yeelirrie Project, https://www.cameco.com/businesses/uranium-projects/yeelirriex.
3. ASX Announcement 25 February 2025, Infini To Acquire Major Footprint In Athabasca Basin.
[END]
This announcement has been approved for release by the Board of Directors of Infini Resources Ltd.
To receive alerts for ASX announcements and updates, or to engage with Infini Resources
directly by asking questions, watching video summaries and seeing what other shareholders
have to say about this, as well as past announcements, please visit
https://infiniresources.com.au or contact us directly at:
Infini Resources Limited
ABN 77 656 098 583
E: info@infiniresources.com.au
T: +61 (08) 9465 1051
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for uranium and lithium.
The company has a diversified and highly prospective portfolio of assets that includes greenfield and more advanced brownfield projects. The company’s
mission is to increase shareholder wealth through exploration growth and mine development.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 4: Overview of Infini's portfolio of projects and global footprint.
Compliance Statement
This report contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s Prospectus dated 30 November
2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance with the 2012 edition of the “Australian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The Company confirms that it is not aware of any new
information or data that materially affects the information included in any original announcement and that all material assumptions and technical parameters
underpinning the estimates in the original market announcement continue to apply and have not materially changed. The original market announcements
are available to view on www.infiniresources.com.au and www.asx.com.au.
This announcement contains information on the Portland Creek Project extracted from ASX market announcements dated 10 January 2024, 15 January
2024, 29 January 2024, 19 February 2024, 3 May 2024, 28 May 2024, 1 July 2024, 10 July 2024, 22 July 2024, 14 October 2024, 23 December 2024,
30 January 2025, 26 March 2025, 4 July 2025, 12 July 2025, 14 July 2025, 28 July 2025, 3 September 2025, 9 October 2025, 13 October 2025, 21
November 2025, 12 December 2025, 24 December 2025, 9 February 2026, 26 May 2026 and 13 July 2026 reported in accordance with the 2012
edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data
that materially affects the information included in the original market announcement.
This announcement contains information on the Company’s Reynolds Lake, Reitenbach Lake and Boulding Lake Projects extracted from market
announcement released to the ASX market announcements platform on 25 February 2025, 2 June 2025, 19 July 2025, 24 July 2025, 19 August 2025, 8
September 2025, 22 September 2025, 2 October 2025, 3 October 2025, 26 November 2025, 23 December 2025,12 January 2026, 19 January 2026 and
28 January 2026 reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The original market announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company
is not aware of any new information or data that materially affects the information included in the original market announcement.
This announcement contains information on the Company’s Des Herbiers Project extracted from market announcement released to the ASX market
announcements platform on 10 January 2024 and 13 June 2024 reported in accordance with the 2012 edition of the “Australian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on
www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data that materially affects the information
Quarterly Activities Report for the Period Ending 30 June 2026
ASX:I88
included in the original market announcement.
This announcement contains information on the Company’s Yeelirrie North Uranium and Bellah Bore East Uranium Projects extracted from
market announcement released to the ASX market announcements platform on 10 January 2024, 8 April 2024 and 3 June 2024 reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The
original market announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new
information or data that materially affects the information included in the original market announcement.
This announcement contains information on the Company’s Tinco Uranium Projects extracted from market announcement released to the ASX market
announcements platform on 10 January 2024, reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on www.infiniresources.com.au and
www.asx.com.au. The Company is not aware of any new information or data that materially affects the information included in the original market
announcement.
This announcement contains information on the Company’s Paterson Lake Lithium Project extracted from market announcement released to the ASX
market announcements platform on 10 January 2024, 6 February 2024 and 26 February 2024 reported in accordance with the 2012 edition of the
“Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are
available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data that materially affects
the information included in the original market announcement.
This announcement contains information on the Company’s Valor Lithium Project extracted from market announcement released to the ASX market
announcements platform on 10 January 2024 and 3 May 2024 reported in accordance with the 2012 edition of the “Australian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on
www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data that materially affects the information
included in the original market announcement.
Forward Looking Statements
Certain statements included in this release constitute forward-looking information. Statements regarding I88’s plans with respect to its mineral properties
and programs are forward-looking statements. There can be no assurance that I88’s plans for development of its mineral properties will proceed as
currently expected. There can also be no assurance that I88 will be able to confirm the presence of additional mineral resources, that any mineralisation
will prove to be economic or that a mine will successfully be developed on any of I88’s mineral properties. The performance of I88 may be influenced by
a number of factors which are outside the control of the Company and its Directors, staff, and contractors. These statements include, but are not limited
to statements regarding future production, resources or reserves and exploration results. All such statements are subject to certain risks and uncertainties,
many of which are difficult to predict
Share your feedback
Discover