► First batch of Phase 2 drilling assays at Portland Creek confirmed uranium mineralisation across multiple
drillholes located more than 1 km apart, validating a structurally controlled hydrothermal system.
► Completion of a 30% expansion of the Portland Creek project footprint, increasing to over 32,000
hectares and consolidating control over a district-scale prospective uranium system.
► Phase 2 field program rock chip assays at Reynolds and Reitenbach Lake confirm widespread uranium
anomalism beyond the initial Titus Prospect discovery, with multiple elevated results defining a coherent
~15 km × 3 km mineralised corridor spatially associated with EM conductors, radiometric anomalies and
key structural features.
► Expansion of the Reitenbach Lake Project footprint, increasing exposure to prospective EM conductors
and structurally controlled uranium targets across the eastern margins of the Athabasca Basin.
► Key contractors appointed and drill targets finalised at Reynolds and Reitenbach Lake, with a minimum
2,500m maiden drill program designed to test high-priority targets defined by integrated geophysics,
geochemistry and structural interpretation.
To learn more about this announcement, click here.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to report on its activities for the quarter ended
31 March 2026 (the “Quarter”). During the Quarter, the Company advanced its Canadian uranium portfolio through the
receipt and interpretation of the first batch of assay results from its completed Phase 2 drilling program at the flagship
Portland Creek Uranium Project in Newfoundland, further validating a structurally controlled mineralising system and
supporting ongoing target refinement.
At the Reynolds Lake and Reitenbach Lake Uranium Projects in Saskatchewan, the Company completed integration of
Phase 1 and Phase 2 field program datasets, including Phase 2 field program rock chip assays confirming widespread
uranium anomalism across a system-scale corridor. This work culminated in the definition of high-priority drill targets and
the appointment of key contractors, positioning the Company to commence its maiden drilling campaign in Q2 CY2026.
In parallel, Infini continued to strengthen its project portfolio through strategic tenement expansion at both Portland Creek
and Reitenbach Lake, consolidating its land position over highly prospective structural corridors. The Company has also
progressed planning for upcoming exploration programs, including airborne geophysics and follow-up fieldwork, as it
advances toward an expanded drilling phase across its key projects in 2026.
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
Summary of Exploration Activities
Portland Creek Uranium Project (100% owned, Newfoundland Canada)
The Portland Creek Uranium Project spans 328 km² and lies within the Precambrian Long-Range Complex of the Humber
Tectonic-Stratigraphic Zone. The geology consists of metaquartzite and a suite of paragneisses, intruded by leucocratic
granite, which are believed to have been thrust westward over Paleozoic carbonate-dominant sediments.
The project area covers large regional uranium anomalies, first identified in the 1970’s through a Newfoundland government
lake-sediment sampling program. A uranium showing was recorded in the Newfoundland Mineral Deposit Index, reporting
2,180 ppm U₃O₈. Compilation of historic and recent exploration data has delineated a ~6 km zone of anomalous uranium
and radon gas responses across lake sediments, soils and airborne radiometric datasets. This anomalism closely follows
a prominent fault scarp, marking the edge of a granitic plateau interpreted as a deep-seated fault.
Since staking the project, the Company has verified historical uranium anomalies and completed a soil sampling grid over
the Falls Lake Prospect. This work defined a ~800 m x 100 m high-grade uranium anomaly, with a peak soil result of 74,997
ppm U₃O₈. This anomaly is located down-ice and west of a 1.5 km radiometric anomaly. Additionally, Infini has identified a
southern 500 m-wide cluster of high-grade soil samples, which includes a peak of 1,500 ppm U₃O₈ and lies 1.5 km from
the recently completed Phase 2 drill program.
First Batch of Assays Received from Phase 2 Diamond Drilling Program at Flagship Portland Creek Project
During the Quarter, Infini received the first batch of laboratory assay results from its Phase 2 diamond drilling program at
the Portland Creek Uranium Project in Newfoundland. The results confirm the presence of uranium mineralisation across
multiple drillholes and priority targets within the Falls Lake Prospect and broader Trident Lake Zone.
Assay results demonstrate that uranium mineralisation is structurally controlled, occurring within fractures, joints, breccias
and altered granite zones, consistent with the Company’s exploration model. Mineralisation is spatially associated with
zones of enhanced fracturing and hydrothermal alteration, supporting the interpretation of structurally focused fluid
pathways operating across the Project. Uranium mineralisation was encountered across multiple areas of the Project,
reinforcing the interpretation of a coherent, multi-kilometre mineralised system. In addition, elevated polymetallic pathfinder
elements, including molybdenum, zinc and copper, were identified in several drillholes, consistent with a fertile hydrothermal
system and further supporting the broader mineralising framework at Portland Creek.
The remaining Phase 2 assay results are expected in Q2 CY2026, following extended laboratory turnaround times. In
parallel, the Company plans to complete a project-wide airborne geophysical survey (TDEM, magnetics and radiometrics)
in Q2 CY2026 to enhance structural and lithological interpretation. This will be followed by a targeted field program in Q2
CY2026 to ground-truth priority anomalies and refine drill targeting.
These integrated datasets will underpin the design of a focused Phase 3 drilling program, currently planned to commence
in Q2/Q3 CY2026, aimed at testing the principal structural corridors and fluid pathways interpreted to control uranium
mineralisation at Portland Creek.
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
Figure 1: Phase 2 drillhole locations with logged visible uranium, demonstrating the emerging potential polymetallic uranium
system at Portland Creek.
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
Reynolds Lake and Reitenbach Lake Projects (100% owned, Saskatchewan Canada)
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 19 mineral claims covering a total footprint
of 677 km² on the eastern outboard margin of the Athabasca Basin in northern Saskatchewan. The projects are contiguous,
with Reynolds Lake consisting of 12 claims (386 km²) and Reitenbach Lake consisting of 7 claims (291 km²) adjoining its
northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are bisected by the
crustal-scale Needle Falls Shear Zone, a major structural corridor separating the Wollaston Domain to the west from the
Peter Lake Domain to the east. The Wollaston Domain is dominated by Paleoproterozoic siliciclastic metasediments
including paragneiss, quartzite, and calc-silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic
granitoid gneisses and supracrustal rocks. Both domains are strongly deformed and metamorphosed, with northeast-
trending isoclinal folding and later cross-cutting north–south fault systems that provide structural complexity and potential
pathways for hydrothermal fluid flow.
Graphitic schists and gneisses, key lithologies known to host unconformity-associated uranium mineralisation, have been
identified within the project area and are spatially associated with electromagnetic conductors, radiometric anomalies and
elevated uranium-in-lake sediment samples. Recent exploration has confirmed primary uranium mineralisation at surface
at Reitenbach Lake, while petrographic analysis has validated a structurally prepared and hydrothermally altered basement
environment consistent with an unconformity-related uranium system.
Regionally, the geological setting is considered analogous to uranium systems at Eagle Point and Rabbit Lake, where
mineralisation occurs along graphitic shear zones at the boundary between Wollaston metasediments and granitoid
basement.
Figure 2: Location of the Reynolds Lake Reitenbach Uranium Projects relative to the world-renowned Athabasca Basin,
synonymous with high-grade uranium deposits, and in close proximity to existing operations, access and infrastructure.
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
Receipt of Phase 2 Field Program Assay Results at Reynolds Lake and Reitenbach Lake
During the Quarter, the Company reported rock chip assay results from its Phase 2 field program at the Reynolds Lake and
Reitenbach Lake Uranium Projects in Saskatchewan. The results confirmed widespread uranium anomalism across both
projects, extending beyond the discovery of the 1.9% U₃O₈ Titus Prospect.
Assay results demonstrate that elevated uranium values are spatially associated with electromagnetic (EM) conductors,
magnetic anomalism and interpreted structural corridors, supporting the Company’s exploration model for structurally
controlled uranium mineralisation. The combined Phase 1 and Phase 2 field program datasets define a highly prospective
uranium mineralisation footprint across an approximately 15 km x 3 km corridor, highlighting the broader prospectivity of
the project area.
These results materially advance the Company’s geological understanding and provide a strong foundation for drill targeting
ahead of the planned maiden drilling campaign.
Expansion of Reitenbach Lake Project Footprint
During the Quarter, the Company completed a strategic expansion of the Reitenbach Lake Project, increasing the total
project area by approximately 36% to ~340 km2
, and strengthening its land position over highly prospective ground on the
eastern margin of the Athabasca Basin.
The newly staked tenements capture extensions of key EM conductors, magnetic anomalism and structurally complex
corridors identified through recent exploration programs. This expansion enhances the Company’s exposure to favourable
geological settings for basement-hosted uranium mineralisation and consolidates control over a large, contiguous
exploration footprint.
The expanded landholding provides additional scope for target generation and supports the identification and prioritisation
of new drill-ready targets, reinforcing the Project’s potential to host a system-scale uranium discovery.
Preparations Nearing Completion for Maiden Drill Program at Reynolds Lake and Reitenbach Lake
During the Quarter, the Company completed the integration of geological, geochemical and geophysical datasets across
the expanded footprint of the Reynolds Lake and Reitenbach Lake Projects to refine its exploration model and generate
high-confidence drill targets.
This work incorporated results from airborne EM and magnetic surveys, surface geochemistry and detailed structural
interpretation, enabling the identification of priority target areas where multiple mineralisation vectors coincide, including
EM conductors, magnetic features and uranium anomalism.
The Company also appointed key contractors, including Rodren Drilling Ltd and Archer Cathro & Associates Ltd, to support
execution of the maiden drilling program. These appointments ensure a highly experienced and technically capable team
is in place to support efficient program execution, real-time geological interpretation and disciplined deployment of
exploration capital, positioning the Company to deliver a well-managed and technically robust maiden drilling campaign.
Drill targeting has now been finalised, with a minimum 2,500 m diamond drilling program planned to systematically test
priority targets. Mobilisation is scheduled for Q2 CY2026, with drilling to focus on structurally complex zones associated
with conductive horizons and uranium anomalism, representing the first drill testing of this highly prospective project area.
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
Figure 3: Indicative drillhole locations for the maiden diamond drilling program at Reynolds and Reitenbach Lake, targeting
priority EM anomalies where magnetic features, structural complexity and uranium geochemical anomalism coincide.
Boulding Lake Uranium Project (Saskatchewan Canada)
At Boulding Lake, preparatory data compilation continued during the Quarter, including integration of the results from Infini’s
earlier 1,300-line km airborne magnetic survey and geophysical interpretation of regional conductors extending into the
project area. Following a review of exploration results and the Company’s strategic focus in actively exploring Portland
Creek, Reynolds Lake and Reitenbach Uranium Projects, Infini elected to relinquish the Boulding Lake Project during the
March 2026 quarter.
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
Des Herbiers Uranium Deposit (100% owned, Québec Canada)
The Des Herbiers Uranium Project consists of 66 non-contiguous claims totaling 36.25 km2
. It is located within the Des
Herbiers township, approximately 9km NW of the Baie-Johan-Beetz municipality and 52km ENE of the municipality of Havre
St-Pierre on the Gulf of St. Lawrence in Quebec, Canada. The Project is situated in the Grenville Province of the Canadian
Shield. The rocks underlying the immediate area are comprised of biotite rich granitic rocks, quartzites and quartzo-
feldspathic gneisses that are derived from strongly metamorphosed sandstones and arkoses, amphibole rich gabbros and
gneisses. Regional structures trend north to northwest and display large-scale curvilinear folding. Historical exploration and
drilling have revealed an abundance of low grade, near surface, bulk tonnage uranium that contains a combined inferred
mineral resource of 162Mt @ 123ppm U3O8
3
reported in accordance with the JORC Code (2012).
No significant exploration activities were undertaken at the Des Herbiers Uranium Project during the reporting period.
Yeelirrie North Uranium Project (100% owned, Western Australia)
The Yeelirrie North Project currently consists of exploration licence E53/2188, E53/2368 and prospecting licence P53/1703,
covering an area of ~329km², located approximately 70km southwest of Wiluna, Western Australia. The Company currently
has three exploration licence applications in progress and if successfully granted, the remaining new exploration licence
applications will see the Company’s Project size increase to a total area of ~746km2
. The Yeelirrie Project is located near
the northern extremity of the Archaean Norseman Wiluna greenstone belt of the Yilgarn Craton. The project is highly
prospective for hosting high-grade uranium mineralised calcrete and lies within the same geological domain as the world
class Yeelirrie Uranium Deposit hosting 128.1Mlb U3O8 at an average ore grade of 1,500 ppm U3O8
4
.
No significant exploration activities were undertaken at the Yeelirrie North Uranium Project during the reporting period.
Bellah Bore East Uranium Deposit (100% owned, Western Australia)
The Bellah Bore East deposit is approximately 500m x 150m in size and located within prospecting license P 53/1703,
comprising 92.67 hectares. The licence is situated within the western edge of the Company’s already existing E 53/2188
tenement ~60km southwest of Wiluna (Yeelirrie Project). The deposit is hosted by calcrete and comprises a historical
inferred mineral resource in accordance with the JORC Code (2004) (it is noted that these exploration results reported
under the JORC 2004 code may not conform to the requirements of the JORC Code 2012). Mineralisation is reported as
open in the northeast. Carnotite is identified as the primary ore mineral in historical drilling.
No significant exploration activities were undertaken at the Bellah Bore East Uranium Project during the reporting period.
Tinco Uranium-Niobium Project (75% Tinco North, 100% Tinco South, Saskatchewan Canada)
The Tinco Uranium-Niobium Project lies to the south-southwest of the Athabasca Basin. It is underlain by the Mudjatik
Domain which is composed mainly of granitoid felsic gneisses of probable Archean age, which are considered basement
to narrow, arcuate to closed belts of supracrustal rocks of sedimentary and volcanic origins. Two types of uranium
mineralisation have been recognised in the area - occurrences in remobilised basement and occurrences in supracrustal.
Previous geological mapping has identified lenses of radioactive pegmatite up to 1.5 m in width. Historical outcropping grab
samples on the property grade up to 600ppm U3O8 and 0.5% Nb.
In Q3 FY2025 a heliborne magnetic, radiometric and time-domain electromagnetic survey was completed covering both
claims. The survey was flown along a west-northwest orientation with lines spaced 100m apart. The total survey comprised
of 1030-line kms, flown at an average height of 36 m. Southern Geoscience Consultants processed the data to produce a
set of filtered images. These images were interpreted to delineate magnetic and radiometric trends, classification of
structures, lineaments, faults and folds, delineation and interpretation of stratigraphic relationships including contacts, and
to produce a set of targets
The survey results indicate that high-resolution magnetic imagery has identified the presence of a major north-south
trending shear zone that contains the historical mineralized grab sample of 600ppm U3O8, 0.5% Nb5
. This provides the
Company with a large U-Nb target for future exploration activities. In addition, there are several large ovoid magnetic
features of interest in the centre of the claims which are an additional area of interest that may be followed up with surface
geochemical surveys.
No significant exploration activities were undertaken at the Tinco Uranium-Niobium Project during the reporting period.
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
Paterson Lake Lithium Project (100% owned, Ontario Canada)
The Paterson Lake Project is located within the highly prospective Archean Separation Lake Greenstone Belt of the Superior
Province of Ontario, Canada. The Project has been documented to contain abundant rare-metal bearing pegmatites
including seven named petalite bearing pegmatites and up to 50 unnamed pegmatites that require investigation. Historical
outcrop grab sample results include results up to 4.43% Li2O and the best reported historical drill intercept to date of 8m
@ 3.12% Li2O. The Separation Rapids Lithium Deposit of Avalon Advanced Materials/Sibelco joint venture is located within
2km of the project boundary.
No significant exploration activities were undertaken at the Paterson Lake Lithium Project during the reporting period.
Valor Lithium Project (50% owned, earn-in up to 100%, Québec Canada)
The Valor Project covers an area of approximately 125km2
in southwest Québec, approximately 40km north-west of Val-
d’Or. The project is situated on the Archean Preissac Lacorne batholith, a syn-to post-tectonic intrusion that was emplaced
in the Southern Volcanic Zone of the Abitibi Greenstone Belt of the Superior Province of Québec. To the north the batholith
is bounded by the Manneville Fault and to the south by the Cadillac Fault and the eastward extension of the Porcupine
Destor Fault. The batholith, which is a composite body has associated pegmatites and quartz veins. After completing soil
sampling activities, the company has now identified several large scale LCT MMI geochemical anomalies.
A targeted biogeochemical sampling program was completed at the Valor Lithium Project to evaluate lithium anomalism
across selected areas. Laboratory results are pending and will be used to inform follow-up exploration activities.
Schedule of Mining Tenements
The Company’s tenement and claim schedule is provided in Appendix 1.
Summary of Corporate Activities
Key Appointments
The Company strengthened its technical capability through the appointment of Mr Andy Yackulic as Strategic Technical
Advisor. Mr Yackulic is a highly experienced uranium exploration geologist with over 20 years’ experience in the Athabasca
Basin, including senior roles with Denison Mines and Cameco, and a track record of uranium discovery. In this role, he will
provide independent technical input to support target refinement, dataset integration and drill planning across the
Company’s portfolio of uranium projects.
General Meeting
The Company held a General Meeting on 26 March 2026, at which all resolutions put to shareholders were successfully
passed by poll. The strong level of shareholder support reflects continued backing for the Company’s strategic initiatives
and provides a solid foundation for ongoing exploration and development activities across its project portfolio. Further
information about the General Meeting, including accessing the Notice of Meeting and Explanatory Memorandum, is
available on the ASX Company’s Announcements Platform and the Company’s website.
Release of Securities from Escrow
The Company announced the release of securities from escrow in accordance with ASX Listing Rule 3.10A. A total of
21,184,250 ordinary shares and 4,500,000 unlisted options were released from escrow on 15 January 2026, followed by a
further 2,622,378 ordinary shares released on 31 March 2026. These securities were originally issued as part of prior capital
raisings and project acquisition consideration, and their release reflects the normal progression of previously imposed
escrow arrangements.
Finance
The Appendix 5B quarterly cashflow report for the quarter ended 31 March 2026 is submitted separately.
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
The Group closed the Quarter with a cash balance of $8.281 million. Exploration expenditure during the quarter totalled
$3,022k (unaudited). A deposit bond of A$432k was paid during the quarter for project work to be completed in Q2 CY26
and subsequent return of the bond at the end of Q2 CY26
Expenditure
In accordance with Listing Rule 5.3.4, Table 1 below compares the Company’s actual expenditure to 31 March 2026 in
comparison with the estimated expenditure outlined in the ‘Use of Funds’ statement included in the Prospectus.
Table 1: Use of funds comparison
Prospectus Current Quarter Total
Exploration & Development (including cash
consideration)
2,484,0001
3,022,676 12,500,998
Lead Manager & Cost of Offer 638,0002
- 753,192
Corporate Administration 960,000 417,314 4,121,944
Working Capital 1,218,000 445,561 1,914,190
Government Grants - - (167,616)
Total 5,300,000 3,885,551 19,122,708
1 Cash Consideration $248k, Exploration & Development $2.236m
2 Lead Manager Fee $318k, Cost of Offer $320k
Exploration and Development
Exploration and development costs for the Quarter relate to the Portland Creek and Reynolds & Reitenbach Lake Projects
with the finalisation of expenses relating to the prior drilling campaigns and field programs plus preparations for the
upcoming exploration programs across both projects in CY26.
Corporate Administration
Corporate and administrative costs for the quarter are aligned with expectations.
Working Capital
Deposit bond of A$432k paid during the quarter for project work to be completed in Q2 CY26 and subsequent return of the
bond at the end of Q2 CY26
Payments to Related Parties
Pursuant to section 6 of the Company Appendix 5B, and as required under ASX Listing Rule 5.3.5, during the Quarter the
Company paid $71k to the Directors for remuneration
Capital Structure
The Capital Structure at the end of the Quarter is as follows:
Table 2: Capital Structure as at 31 March 2026
Securities Number
Shares 108,207,236
Options 42,852,588
Performance Rights 2,061,189
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
References
1. ASX Announcement 9 February 2026; Assays Confirm Structurally Controlled Uranium System at Portland Creek.
2. ASX Announcement 10 July 2024, Soil Grades up to 74,997 ppm U3O8 (7.5%) at Portland Creek.
3. ASX Announcement 10 January 2024, Infini Resources Limited Prospectus.
4. Cameco Website, Yeelirrie Project, https://www.cameco.com/businesses/uranium-projects/yeelirriex.
5. ASX Announcement 25 February 2025, Infini To Acquire Major Footprint In Athabasca Basin.
[END]
This announcement has been approved for release by the Board of Directors of Infini Resources Ltd.
To receive alerts for ASX announcements and updates, or to engage with Infini Resources
directly by asking questions, watching video summaries and seeing what other shareholders
have to say about this, as well as past announcements, please visit
https://infiniresources.com.au or contact us directly at:
Infini Resources Limited
ABN 77 656 098 583
E: info@infiniresources.com.au
T: +61 (08) 9465 1051
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for uranium and lithium.
The company has a diversified and highly prospective portfolio of assets that includes greenfield and more advanced brownfield projects. The company’s
mission is to increase shareholder wealth through exploration growth and mine development.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 4: Overview of Infini's portfolio of projects and global footprint.
Compliance Statement
This report contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s Prospectus dated 30 November
2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance with the 2012 edition of the “Australian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The Company confirms that it is not aware of any new
information or data that materially affects the information included in any original announcement and that all material assumptions and technical parameters
underpinning the estimates in the original market announcement continue to apply and have not materially changed. The original market announcements
are available to view on www.infiniresources.com.au and www.asx.com.au.
This announcement contains information on the Portland Creek Project extracted from ASX market announcements dated 10 January 2024, 15 January
2024, 29 January 2024, 19 February 2024, 3 May 2024, 28 May 2024, 1 July 2024, 10 July 2024, 22 July 2024, 14 October 2024, 23 December 2024, 30
January 2025, 26 March 2025, 4 July 2025, 14 July 2025, 28 July 2025, 4 July 2025, 12 July 2025, 28 July 2025, 3 September 2025, 9 October 2025, 13
October 2025, 21 November 2025, 12 December 2025, 24 December 2025 and 9 February 2026 reported in accordance with the 2012 edition of the
“Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are
available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data that materially affects
the information included in the original market announcement.
This announcement contains information on the Company’s Reynolds Lake, Reitenbach Lake and Boulding Lake Projects extracted from market
announcement released to the ASX market announcements platform on 25 February 2025, 2 June 2025, 19 July 2025, 24 July 2025, 19 August 2025, 8
September 2025, 22 September 2025, 2 October 2025, 3 October 2025, 26 November 2025, 23 December 2025,12 January 2026, 19 January 2026 and
28 January 2026 reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The original market announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company
is not aware of any new information or data that materially affects the information included in the original market announcement.
This announcement contains information on the Company’s Des Herbiers Project extracted from market announcement released to the ASX market
announcements platform on 10 January 2024 and 13 June 2024 reported in accordance with the 2012 edition of the “Australian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on
www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data that materially affects the information
Quarterly Activities Report for the Period Ending 31 March 2026
ASX:I88
included in the original market announcement.
This announcement contains information on the Company’s Yeelirrie North Uranium and Bellah Bore Eat Uranium Projects extracted from market
announcement released to the ASX market announcements platform on 10 January 2024, 8 April 2024 and 3 June 2024 reported in accordance with the
2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data
that materially affects the information included in the original market announcement.
This announcement contains information on the Company’s Tinco Uranium Projects ext
Share your feedback
Discover