Phase 2 Rock Chip Assays Confirm
Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
High-grade uranium confirmed at the Titus Prospect (Reitenbach Lake), with a
Phase 1 uraninite-bearing sample returning 18,986 ppm U₃O₈ (1.90% U₃O₈).1
Phase 2 assays returned multiple elevated uranium results, with values up to
approximately 3,844 ppm U₃O₈ (0.38% U₃O₈), confirming additional zones of
anomalism beyond the Titus Showing.
Samples with elevated uranium assay results are spatially coincident with EM
conductors, radiometric responses and interpreted structural corridors across a
continuous ~15 km × 3 km prospective corridor spanning both projects.
Results continue to upgrade and de-risk priority targets, supporting targeting and
drill planning ahead of a planned maiden drill program in Q2 CY2026.
Engagement with First Nations, government permitting agencies and key
contractors advancing to support drill-readiness.
Maiden drill program at Reynolds Lake and Reitenbach Lake fully funded with
existing cash reserves.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to announce that the
Company has received rock-chip assay results from the Phase 2 field program at its Reynolds Lake and
Reitenbach Lake Uranium Projects in Saskatchewan, Canada.
Infini’s Chief Executive Officer, Rohan Bone, said: "Receiving the Phase 2 assay results is an
important step forward for Infini. While the Titus Prospect remains a standout high-grade target, the Phase
2 results demonstrate that uranium anomalism is broader and more extensive across both Reynolds and
Reitenbach than initially mapped.
Seeing multiple elevated uranium results outside the original discovery area reinforces our confidence in
the potential scale of the system. With the full Phase 1 and Phase 2 dataset now in hand, we are well
positioned to finalise drill targets and advance confidently toward our planned 2026 maiden drilling
program.”
Phase 1 and Phase 2 Rock Chip Assay Results
A total of 181 rock-chip samples from the Reynolds Lake and Reitenbach Lake projects have now been
assayed across the Phase 1 and Phase 2 field programs. Both field programs were designed to
systematically test priority areas identified from airborne EM, radiometrics and structural interpretation.
Rock-chip and soil sampling focused on outcropping bedrock, glacial float and geochemical dispersion
patterns across these priority areas.
At Reitenbach Lake, Phase 1 sampling identified the Titus Showing, where a uraninite-bearing rock
sample returned 18,986 ppm U3O8 (1.90% U3O8), confirming high-grade uranium mineralisation at
surface. Phase 2 sampling returned additional elevated uranium values, with a maximum of 3,844 ppm
U₃O₈, demonstrating that uranium anomalism extends beyond the initial discovery area and remains open
within an interpreted structural corridor coincident with significant EM conductors.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 2
At Reynolds Lake, both Phase 1 and Phase 2 assays confirm elevated uranium values are spatially
associated with EM conductors and mapped shear zones identified during mapping. This reinforces the
interpretation that mineralisation is structurally controlled and associated with priority geophysical targets.
The combined assay, geophysical and structural datasets indicate a potential coherent, system-scale
uranium footprint extending over an approximately 15 km × 3 km corridor across both projects, further
strengthen Infini’s geological model and indicate a geological setting potentially analogous to basement-
hosted uranium systems such as Rabbit Lake, where mineralisation is structurally controlled and spatially
associated with graphitic units and conductive corridors.
Next Steps
Results from the Phase 1 and Phase 2 field programs materially advance Infini’s understanding of both
projects and provide a strong technical foundation for follow-up exploration and drill targeting. Assay
results will now be integrated with geological mapping, geophysical datasets and structural interpretation
to finalise and prioritise drill-ready targets across both Reynolds and Reitenbach Lake projects. Key
upcoming milestones include:
• Acquisition and consolidation of historical datasets and geophysics results relevant to the recently
staked Reitenbach tenements (refer 12 January 2026 ASX Announcement), expected Q1
CY2026
• Target refinement and drill planning integrating structural, geophysical and geochemical
datasets, expected in Q1 CY2026.
• Ongoing engagement with local First Nations, including Ya’thi Néné Lands and Resources
(YNLR), alongside government permitting processes, progressing in parallel to support drilling
activities.
• Appointment and mobilisation of key geological and drilling contractors ahead of commencement
of drilling activities, expected in Q1 and Q2 CY2026.
• Commencement of a maiden drill campaign across priority targets at Reynolds and Reitenbach
Lake projects, subject to permitting and stakeholder engagement, targeted for Q2 CY2026.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 3
Figure 1: Assay results from the Phase 1 and Phase 2 field programs at Reynolds and Reitenbach Lake projects
highlight coincidence of anomalous uranium-bearing samples with EM anomalies, RAD anomalies and key
interpreted geological structures across an approximate 15km x 3km corridor.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 4
Figure 2: Geological map of the Titus Prospect at Reitenbach Lake, demonstrating confluence of uranium mineralisation
with large EM anomalies and regional fault corridors.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 5
References
1. ASX announcement, Infini Resources, High-Grade Uraninite Confirmed at Reitenbach Lake – Phase
1 Assay Results Received, 23 December 2025.
2. ASX announcement, Infini Resources, Infini Expands Reitenbach Lake Uranium Project Footprint by
31%, 12 January 2026.
3. ASX announcement, Infini Resources, Amendment to ASX Announcement; Reynolds Lake Field
Program Expanded to Target New EM Anomalies, 2 October 2025 and 22 September 2025.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 6
About Reynolds Lake & Reitenbach Lake
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 22 mineral claims
covering a total footprint of 766 km² on the eastern outboard margin of the Athabasca Basin in northern
Saskatchewan. The projects are contiguous, with Reynolds Lake consisting of 12 claims (386 km²) and
Reitenbach Lake consisting of 10 claims (381 km²) adjoining its northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are
bisected by the crustal-scale Needle Falls Shear Zone, a major structural corridor separating the
Wollaston Domain to the west from the Peter Lake Domain to the east. The Wollaston Domain is
dominated by Paleoproterozoic siliciclastic metasediments including paragneiss, quartzite, and calc-
silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic granitoid gneisses and
supracrustal rocks. Both domains are strongly deformed and metamorphosed, with northeast-trending
isoclinal folding and later cross-cutting north–south fault systems that provide structural complexity and
potential pathways for hydrothermal fluid flow.
Graphitic schists and gneisses, key lithologies known to host unconformity-associated uranium
mineralisation, have been identified within the project area and are spatially associated with
electromagnetic conductors, radiometric anomalies and elevated uranium-in-lake sediment samples.
Recent exploration has confirmed primary uranium mineralisation at surface at Reitenbach Lake, while
petrographic analysis has validated a structurally prepared and hydrothermally altered basement
environment consistent with an unconformity-related uranium system.
Regionally, the geological setting is considered analogous to uranium systems at Eagle Point and Rabbit
Lake, where mineralisation occurs along graphitic shear zones at the boundary between Wollaston
metasediments and granitoid basement.
Figure 3: Location of the Reynolds Lake Uranium Project and Reitenbach Uranium Project relative to the
world-renowned Athabasca Basin, synonymous with high-grade uranium deposits, and in close proximity to
existing operations, access and infrastructure.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 7
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and more
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 4: Overview of Infini's portfolio of projects and global footprint.
Competent Person & Compliance Statement
The information in this report that relates to exploration results for the Reynolds Lake Uranium Project and Reitenbach Lake Uranium
Project is based on, and fairly represents, information and supporting documentation compiled and evaluated by Mark Couzens,
Principal Geologist of the Company who is a Member of the AusIMM. Mr. Couzens has sufficient experience relevant to the style
of mineralisation, type of deposit under consideration, and the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC
Code). Mr. Couzens consents to the inclusion of the information in the form and context in which it appears. The information in the
market announcement is an accurate representation of the available data and studies for the Reynolds Lake Uranium Project and
the Reitenbach Lake Uranium Project.
This announcement contains information on the Reynolds Lake Uranium Project and the Reitenbach Lake Uranium Project
extracted from ASX market announcements dated 25 February 2025, 31 March 2025, 24 July 2025, 20 August 2025, 9 September
2025, 22 September 2025, 2 October 2025, 3 October 2025, 26 November 2025, 23 December 2025 and 12 January 2026 and
reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves” (JORC Code). The original market announcements are available to view on www.infiniresources.com.au and
www.asx.com.au. The Company is not aware of any new information or data that materially affects the information included in the
original market announcement.
This announcement contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s
Prospectus dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in
accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the
information included in any original announcement and that all material assumptions and technical parameters underpinning the
estimates in the original market announcement continue to apply and have not materially changed. The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 8
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 9
Appendix 1: Reynolds and Reitenbach Lake Phase 2 field program rock
chip sample assay results
Table 1: Recently completed rock chip sample assay results from the Reynolds Lake and Reitenbach Lake
Phase 2 field program. All survey sites are projected in NAD83 UTM Zone 13.
Sample
ID
UTM
East
(m)
UTM
North
(m)
UTM
Elevation
(m)
U3O8
(ppm)
Th
(ppm)
As
(ppm)
Co
(ppm)
Ni
(ppm)
Pb
204
(ppm)
Pb
206
(ppm)
Pb
207
(ppm)
D201413 623162 6423678 387 3278 22.8 1.1 16.0 7.4 0.1 922.0 102.5
D201414 628391 6421215 374 20 95.2 0.8 1.5 2.7 0.3 11.5 5.4
D201415 628382 6421235 366 86 189.0 1.5 2.1 3.9 0.3 36.2 7.3
D201416 628382 6421247 374 62 100.5 0.5 1.8 3.6 0.3 23.5 6.9
D201417 628301 6421403 382 11 25.9 0.7 1.9 2.1 0.7 23.2 11.6
D201418 629604 6421783 373 25 50.7 0.4 1.8 1.7 0.5 17.3 8.6
D201419 629468 6422216 359 11 24.8 1.4 1.7 1.7 0.8 17.8 13.4
D201420 626262 6413486 383 5 19.9 2.0 6.2 13.5 0.2 5.0 3.6
D201421 626403 6414124 363 47 32.4 0.4 0.4 0.5 0.5 18.9 8.4
D201422 626446 6414167 374 3 8.7 0.9 0.7 1.5 0.1 1.6 0.9
D201423 627034 6414301 361 139 540.0 0.4 1.0 1.4 0.6 50.7 12.8
K665557 623341 6424114 379 145 17.9 0.4 3.0 2.6 0.1 54.9 7.0
K665558 623490 6423952 377 2700 44.8 0.3 2.4 1.5 0.2 728.0 80.6
K665559 627793 6421044 380 20 35.6 0.3 0.8 1.3 0.7 20.8 11.6
K665560 622803 6425992 N/A 8 47.3 0.2 3.4 1.4 0.7 14.1 11.6
K665561 625430 6415056 N/A 83 314.0 0.4 1.3 1.5 0.5 31.5 10.1
K665562 625541 6415470 364 12 54.3 0.2 4.3 11.3 0.4 9.3 6.1
K665651 623430 6424004 381 3844 14.0 2.4 25.2 50.2 0.2 1200.0 135.5
K665652 623447 6423972 378 1071 28.1 0.6 4.0 1.7 0.2 320.0 38.5
K665653 623756 6424390 381 544 30.5 0.2 5.0 1.8 0.3 183.5 24.4
K665654 627584 6420832 377 4 45.8 0.2 2.6 3.4 0.5 8.7 7.3
K665655 628091 6420948 N/A 22 226.0 0.3 8.6 13.3 0.3 17.7 5.7
K665656 623456 6424079 388 14 273.0 0.4 1.0 0.6 0.6 12.7 8.8
K665657 623545 6424256 377 6 174.0 0.1 1.2 2.1 0.1 2.4 1.3
K665658 626252 6413486 367 105 123.0 0.3 0.8 1.7 0.5 36.0 9.7
K665659 626412 6414110 371 50 26.2 0.2 0.4 0.7 0.6 22.2 10.2
K665660 626396 6414136 369 39 40.6 0.2 0.4 0.5 0.8 28.9 14.4
K665661 626785 6414118 366 59 42.3 0.4 0.7 0.6 0.5 32.1 10.2
K665662 627186 6414675 351 17 90.9 0.4 0.9 2.2 0.5 62.2 13.6
K665663 627268 6414878 351 266 181.5 0.4 0.5 1.3 0.1 60.0 7.3
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at
Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 10
Sample
ID
UTM
East
(m)
UTM
North
(m)
UTM
Elevation
(m)
U3O8
(ppm)
Th
(ppm)
As
(ppm)
Co
(ppm)
Ni
(ppm)
Pb
204
(ppm)
Pb
206
(ppm)
Pb
207
(ppm)
K665701 629409 6420567 408 131 12.9 0.5 0.8 1.2 0.2 33.0 6.0
K665702 625806 6415377 N/A 5 27.4 0.2 0.6 0.7 0.5 8.6 7.2
K665703 625525 6414981 N/A 12 49.9 0.3 1.5 1.5 0.4 12.7 7.3
K665704 625489 6415430 N/A 12 55.6 0.2 1.1 2.3 0.3 5.7 4.5
K665705 625687 6415584 N/A 33 24.8 0.2 0.3 0.4 0.6 17.0 9.9
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
11
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
• Mapping and Prospecting Samples
Mapping and prospecting include both select grab samples
and lithological geochemical (LGC) grab samples. Select
samples are guided by a handheld scintillometer (RS-125
Super-SPEC), targeting anomalous readings greater than
400 cps. LGC samples are prioritized based on lithology,
alteration, and mineralisation, consistent with industry
standards. For both sampling types, UTM coordinates (UTM
Zone 13), sample site details, and lithology / alteration /
mineralisation descriptions are collected and stored digitally.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
• Not applicable due to no drilling undertaken.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
12
Criteria JORC Code explanation Commentary
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Not applicable due to no drilling undertaken.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
• Not applicable due to no drilling undertaken.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected, including for
instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of
the material being sampled.
• Rock samples were prepared using ALS method PREP-31,
where samples are crushed to 70% passing 2 mm, a ~250 g
split is taken, and the split is pulverized to 85% passing 75
µm. Analytical work was completed with ME-MS61L, a four-
acid digestion followed by ICP-MS multi-element analysis.
For selected samples—particularly those containing quartz
veins, flooded textures, or fine-grained disseminated
sulphides—an additional gold assay was carried out using
Au-AA23, a 30 g fire assay with AAS finish. The four-acid
digestion provides a near-total digestion for most silicate,
oxide, and sulphide minerals, while fire assay is considered
the most reliable technique for gold determination.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
13
Criteria JORC Code explanation Commentary
Quality of
assay data
and laboratory
tests
• The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the technique
is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
• No quality control procedures (e.g. standards, blanks,
duplicates were added to the samples submitted due to the
exploratory nature of the sample types. Normal lab QAQC
insertions will be performed by ALS Global, an ISO-certified
lab in Sudbury, Ontario.
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• All sample sites and relevant data regarding the site, material
sampled and Lith, Alt and Mineralisation are recorded by the
geologist and stored in a database.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Not applicable due to no drilling undertaken.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Not applicable as no Mineral Resource and Ore Reserves
are reported.
• No sample compositing has been applied.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
14
Criteria JORC Code explanation Commentary
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
• Current understanding is still evolving and the mineralized
strike directions are unknown. Rock sampling was
completed across and along strike of outcrop and subcrop
sample locations.
Sample
security
• The measures taken to ensure sample security. • All samples were within the contractors' possession with a
strong chain of custody protocol. They have been shipped in
sealed and manifested sample bags and delivered by a
bonded courier to ALS Global in Sudbury, Ontario, an ISO
certified lab.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Not applicable
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
15
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
• The Reynolds Lake Uranium Project comprises twelve
mineral claims (MC00016423 - MC00016434). The
company acquired the project in 2025 (100% ownership)
and is not aware of any royalties existing on the claims or
impediments to obtaining a license to operate in the area.
• The Reitenbach Lake Uranium Project comprises ten
mineral claims (MC00018042 - MC00018048, MC00023249
- MC00023251). The company acquired the project in 2025
(100% ownership) and is not aware of any royalties existing
on the claims or impediments to obtaining a license to
operate in the area.
• The claims are currently live and in good standing.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other
parties.
• Historical exploration data is available through the Canadian
Geological Society’s portal.
Geology • Deposit type, geological setting and style of mineralisation. • The target uranium deposit type remains uncertain at this
early stage of exploration but may include high-grade
unconformity-style deposits (e.g., Rabbit Lake in
Saskatchewan) or structurally controlled albitite-type
deposits (also referred to as shear zone-hosted uranium).
Drill hole
Information
• A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar
• dip and azimuth of the hole
• Not applicable due to no drilling undertaken.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
16
Criteria JORC Code explanation Commentary
• down hole length and interception depth
• hole length.
• If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• Not applicable due to no drilling undertaken.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect (eg
‘down hole length, true width not known’).
• Not applicable due to no drilling undertaken.
Diagrams • Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
• Appropriate diagrams are included in the main body of this
report. No significant discovery is being reported.
Phase 2 Rock Chip Assays Confirm Widespread Uranium Anomalism at Reynolds and Reitenbach Lake
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
17
Criteria JORC Code explanation Commentary
Balanced
reporting
•
Share your feedback
Discover