Portland Creek Survey Complete and Fieldwork Commenced
Released
Released
Announcement PDF
ASX Announcement
Released 13 July 2026
ASX:I88
Portland Creek Radiometric Survey Completed as
Field Program Advances Phase 3 Drill Targeting
► High-resolution airborne radiometric survey completed, adding a modern radiometric dataset across
Infini’s expanded Portland Creek tenure package.
► Integrated interpretation of new radiometric, magnetic and electromagnetic (EM) data underway,
mapping major fault sets, structural intersections and demagnetised zones, and sharpening the definition
of uranium‑related anomalous areas across the broader structural system at Portland Creek.
► 2026 field program commenced, with mapping, prospecting and sampling designed to refine high-priority
drill targets across multiple structural zones.
► Rock chip and selective soil sampling program in progress to characterise hydrothermal alteration and
pathfinder element associations, providing geochemical vectors for Phase 3 drill planning.
► Phase 3 diamond drilling program remains on schedule for Q3 CY2026, targeting a district‑scale,
structurally controlled uranium system at Portland Creek.
To learn more about this announcement and watch a video update from our CEO, Rohan Bone, click here.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to announce the completion of an airborne
radiometric survey and the commencement of the 2026 field program at its Portland Creek Uranium Project in
Newfoundland, Canada.
Completion of radiometric survey and interpretation of airborne magnetic, electromagnetic and radiometric data
Infini has successfully completed an airborne radiometric survey at the Portland Creek Uranium Project, delivering a
modern, high‑resolution radiometric dataset over the defined survey area within its expanded tenement package. The
heliborne survey was flown by Axiom Exploration Group Ltd. on 200 m‑spaced flight lines at a nominal terrain clearance of
40–65 m (terrain dependent) for a total of 737 line‑kilometres and was specifically designed to complement the existing
electromagnetic and magnetic coverage, substantially enhancing the core airborne geophysical dataset for the Project.
Preliminary interpretation of the airborne magnetic, electromagnetic (EM) and radiometric data is underway and is already
providing significant insight into the subsurface geological framework at Portland Creek. The combined geophysical dataset
is being used to map major fault sets and structural intersections, delineate resistive trends, and identify demagnetised and
radiometrically anomalous zones that may reflect hydrothermal alteration within the granite host. To refine target generation,
these geophysical interpretations are being cross-referenced with historical lake sediment and soil geochemistry data, as
well as results from the Company’s Phase 1 and Phase 2 drill programs.
The final EM dataset did not identify discrete bedrock conductors of significance within the survey area, with responses
limited to waterbodies and cultural features such as powerlines. This outcome is consistent with observations from the
Phase 2 drilling program, which indicate that uranium at Portland Creek is developed within fracture‑controlled zones in
granite rather than being associated with conductive sulphides or graphitic metasediments. In contrast, magnetic‑low zones
resolved in the survey are interpreted as potential magnetite‑to‑hematite alteration halos related to uranium‑bearing
hydrothermal fluids, and are being used, together with radiometric highs, to identify high-priority structures for drill testing.
Collectively, these airborne datasets materially advance the Portland Creek geological model by clarifying the relationship
between brittle fault and fracture networks, magnetic disruption, radiometric anomalism and known uranium mineralisation.
The evolving interpretation is directly informing the ranking of structural corridors, target zones and untested anomaly
clusters for follow‑up field work and Phase 3 drilling.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
ASX:I88
Figure 1: Map illustrating the distribution of airborne radiometric uranium anomalism at Portland Creek, with multiple
high‑intensity zones aligned along key structural trends across Infini’s tenement package.
Figure 2: Map showing interpreted fault architecture, demagnetised zones and radiometric uranium anomalies at Portland
Creek, highlighting priority structural target areas for the 2026 field program and Phase 3 drilling.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
ASX:I88
Field program commenced
Infini has mobilised geological crews to Portland Creek and commenced the field program, with activities focused on
ground‑truthing priority radiometric anomalies identified in the recent airborne survey and refining structural and geological
controls across the project area.
Field activities are targeting outcropping fault zones, fracture networks and breccia bodies within the granitic plateau and
adjacent structural domains, with particular emphasis on areas where interpreted demagnetised zones, radiometric highs
and uranium-in-soil anomalies coincide. Mapping and oriented measurements are aimed at better constraining the
orientation and kinematics of the principal structures, as well as secondary splays and intersection zones that may have
acted as localised traps for uranium mineralisation.
Rock chip and selective soil sampling will be used to characterise hydrothermal alteration assemblages and pathfinder
element associations (including molybdenum, zinc and copper) in surface exposures, providing additional geochemical
vectors that can be integrated with subsurface assay data from the Phase 1 and Phase 2 drill programs. Outcomes from
the field program will feed directly into target generation and drill hole planning for the upcoming Phase 3 diamond drilling
campaign, scheduled to commence in Q3 CY2026.
Figure 3: Field program underway at Portland Creek, with mapping, sampling and prospecting across priority
radiometric anomaly and structural target areas to refine Phase 3 drill planning.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
ASX:I88
Infini’s Chief Executive Officer, Rohan Bone, said: "With the radiometric survey now complete and our field crews on
the ground, we are moving into the next phase of systematically unlocking Portland Creek’s potential as a structurally
controlled, district‑scale uranium system. The integrated geophysical and geological dataset we are building is designed to
deliver sharper targets and a more focused Phase 3 drilling program commencing in Q3, where we aim to build upon drilling
results of 2025 and convert this growing technical understanding into meaningful discovery outcomes for shareholders."
Next steps at Portland Creek
With the field program now underway, Infini is advancing toward an expanded drilling campaign at the Portland Creek
Uranium Project. Key upcoming activities include:
• Completion of detailed structural mapping, rock chip sampling and prospecting across priority target areas. Field
activities will focus on identifying outcropping fault structures, characterising hydrothermal alteration and refining
drill collar locations to maximise the effectiveness of the Phase 3 drilling program.
• Integration of these results with drilling data, structural observations and geochemical datasets to define high-
priority targets and finalise the scope and focus areas for the planned Phase 3 drilling program.
• Progressing regulatory approvals and logistics for the Phase 3 diamond drilling program, focused on testing the
highest priority structural corridors and intersection zones within the interpreted district-scale uranium system at
Portland Creek.
The drilling program is scheduled to commence in Q3 CY2026 and represents a significant expansion of drill testing across
a structurally controlled and highly prospective uranium system hosted within the Precambrian Long-Range Complex of
Newfoundland's Humber Tectonic-Stratigraphic Zone, a geological setting considered highly favourable for structurally
hosted, hydrothermal uranium mineralisation.
[END]
This announcement has been approved for release by the Board of Directors of Infini Resources Ltd.
To receive alerts for ASX announcements and updates, or to engage with Infini Resources
directly by asking questions, watching video summaries and seeing what other shareholders
have to say about this, as well as past announcements, please visit
https://infiniresources.com.au or contact us directly at:
Infini Resources Limited
ABN 77 656 098 583
E: info@infiniresources.com.au
T: +61 (08) 9465 1051
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
ASX:I88
About Portland Creek
The Portland Creek Uranium Project spans 329 km² and lies within the Precambrian Long-Range Complex of the Humber
Tectonic-Stratigraphic Zone. The geology consists of metaquartzite and a suite of paragneisses, intruded by leucocratic
granite, which are believed to have been thrust westward over Paleozoic carbonate-dominant sediments.
The project area covers a large regional uranium anomaly, first identified in the 1970s through a Newfoundland government
lake sediment sampling program. Originally, one uranium showing was recorded in the Newfoundland Mineral Deposit
Index, reporting 2,180 ppm U₃O₈. A compilation of historic and recent exploration data have since delineated a 6 km zone
of anomalous uranium and radon gas in lake sediments, soils and in an airborne radiometric survey. This anomaly closely
follows a prominent fault scarp, marking the edge of a granitic plateau interpreted as a deep-seated fault.
Since listing, the Company has verified historical uranium anomalies and completed a soil sampling grid over the Falls Lake
Prospect (formerly the Talus Prospect). This work defined a ~800 m x 100 m high-grade uranium anomaly, with a peak
result of 74,997 ppm U₃O₈. This anomaly is located down-ice and west of a 1.5 km radiometric anomaly. Additionally, Infini
has identified a southern 500 m-wide cluster of high-grade soil samples, which includes a peak of 1,500 ppm U₃O₈ and lies
1.5 km from the recently completed Phase 2 drill program.
Figure 4: Overview of prospective exploration areas at Portland Creek, demonstrating the occurrence of soil sampling assays
up to 74,997 ppm U₃O₈, anomalous radiometric data and Infini’s package of tenements.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
ASX:I88
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for uranium and lithium.
The company has a diversified and highly prospective portfolio of assets that includes greenfield and more advanced brownfield projects. The company’s
mission is to increase shareholder wealth through exploration growth and mine development.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 5: Overview of Infini's portfolio of projects and global footprint.
Competent Person Statement
The information in this report that relates to exploration results for the Portland Creek Project is based on, and fairly represents, information and supporting
documentation compiled and evaluated by Drew Heasman, an independent consultant to the Company through SMCG Services Inc., who is a Professional
Geoscientist (P.Geo., registration no. 10901) of the Professional Engineers and Geoscientists of Newfoundland and Labrador (PEGNL), and is a member
in good standing. Mr. Heasman has sufficient experience relevant to the style of mineralisation, type of deposit under consideration, and the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources,
and Ore Reserves (JORC Code). Mr. Heasman consents to the inclusion of the information in the form and context in which it appears. The information
in the market announcement is an accurate representation of the available data and studies for the Portland Creek Project.
Compliance Statements
This announcement contains information on the Portland Creek Project extracted from ASX market announcements dated 10 January 2024, 15 January
2024, 29 January 2024, 19 February 2024, 28 May 2024, 1 July 2024, 10 July 2024, 22 July 2024, 14 October 2024, 23 December 2024, 26 March 2025,
4 July 2025, 14 July 2025, 28 July 2025, 30 July 2025, 3 September 2025, 11 September 2025, 9 October 2025, 13 October 2025, 21 November 2025,
12 December 2025, 9 February 2026 and 26 May 2026 reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on www.infiniresources.com.au
and www.asx.com.au. The Company is not aware of any new information or data that materially affects the information included in the original market
announcement.
This announcement contains information regarding the Des Herbiers Mineral Resource Estimate (162 Mt @ 123 ppm U₃O₈, Inferred), extracted from the
Independent Geologist's Report in the Company's Prospectus dated 30 November 2023 and released to the ASX market announcements platform on 10
January 2024, reported in accordance with the 2012 Edition of the JORC Code. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the original disclosure and that all material assumptions and technical parameters underpinning the
estimate continue to apply and have not materially changed. The original market announcements are available to view on www.infiniresources.com.au
and www.asx.com.au
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
ASX:I88
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Statements regarding I88’s plans with respect to its mineral properties
and programs are forward-looking statement. Such forward-looking statements/projections are estimates for discussion purposes only and should not be
relied upon. Forward-looking statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved. There
can be no assurance that I88’s plans for development of its mineral properties will proceed as currently expected. There can also be no assurance that
I88 will be able to confirm the presence of additional mineral resources, that any mineralisation will prove to be economic or that a mine will successfully
be developed on any of I88’s mineral properties. Infini Resources Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projections based on new information, future
events or otherwise, except to the extent required by applicable laws. While the information contained in this report has been prepared in good faith,
neither Infini Resources Limited or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as
to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
Portland Creek Radiometric Survey Completed as Field Program Advances Phase 3 Drill Targeting
ASX:I88
Appendix 1: Flight lines of the 2026 airborne radiometric survey
Figure 6: Flight path of the radiometric survey conducted over the Portland Creek Project in Newfoundland, Canada.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
Portland Creek Radiometric Survey Completed as Field Program Advances Phase 3 Drill Targeting
ASX:I88
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
• The heliborne Radiometric survey over the Portland Creek
project was flown along 200m spaced traverse lines
oriented 120o
– 300o
and 90o
– 270o
for a total of 737 line-
kilometres flown.
• The radiometric system consists of a Radiation Solutions
RSX-4 gamma-ray spectrometer equipped with a 16-litre
downward-looking NaI (sodium iodide) crystal detector,
securely mounted beneath the helicopter. The detector was
rigidly fixed to the airframe to maintain consistent
orientation and minimize interference during flight. This
configuration allows for high-resolution, high-sensitivity data
acquisition essential for detailed radiometric mapping. The
survey was flown by Axiom Exploration Group Ltd. of
Saskatoon, Saskatchewan.
• Details of the 2026 airborne TDEM survey have been
previously disclosed (ASX 26th
May 2026).
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
• Not applicable for this announcement, no new drilling
activities reported.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
Portland Creek Radiometric Survey Completed as Field Program Advances Phase 3 Drill Targeting
ASX:I88
Criteria JORC Code explanation Commentary
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Not applicable for this announcement, no new drilling
activities reported.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
• Not applicable for this announcement, no new drilling,
logging or sampling activities reported.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected, including for
instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of
the material being sampled.
• Not applicable for this announcement, no new drilling or
sampling activities reported.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
Portland Creek Radiometric Survey Completed as Field Program Advances Phase 3 Drill Targeting
ASX:I88
Criteria JORC Code explanation Commentary
Quality of
assay data
and laboratory
tests
• The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the technique
is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
• Radiometric system calibration followed the survey contract
specifications, including daily thorium source tests verifying
that system sensitivity remained within 8% of the survey
average. Data processing by Axiom Exploration Group Ltd.
included NASVD spectral processing, radon background
correction, spectral stripping, height correction and
conversion to elemental concentrations, with final
processing carried out on the full 1024-channel spectrum.
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• Not applicable for this announcement, no new drilling or
sampling activities reported.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• The GPS utilized in the airborne geophysics was a a Novatel
DL-V3L1L2 which has L1/L2, 12 satellites, and was
recording at 2 Hz.
• A Laser altimeter was used, SF00 (heli) with a 1cm
resolution, recording rate 20Hz.
• Details of the 2026 airborne TDEM survey have been
previously disclosed (ASX 26th
May 2026).
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The heliborne Radiometric survey over the Portland Creek
project was flown along 200m spaced traverse lines. This is
considered appropriate for this early level of exploration.
• Details of the 2026 airborne TDEM survey have been
previously disclosed (ASX 26th
May 2026).
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
Portland Creek Radiometric Survey Completed as Field Program Advances Phase 3 Drill Targeting
ASX:I88
Criteria JORC Code explanation Commentary
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
• The heliborne Radiometric survey over the Portland Creek
project was flown along 200m spaced traverse lines
oriented 120o
– 300o
and 90o
– 270o
for a total of 737 line-
kilometres flown.
• The traverse flight lines are oriented perpendicular to the
interpreted major fault system which is considered
appropriate for this early level of exploration.
• Details of the 2026 airborne TDEM survey have been
previously disclosed (ASX 26th
May 2026).
Sample
security
• The measures taken to ensure sample security. • Not applicable for this announcement, no new sample
activities reported .
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Review of the airborne geophysics data was carried out by
Resource Potentials Pty Ltd, 1/46 Hasler Road, Osborne
Park, WA 6017, website: www.respot.com.au
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
Portland Creek Radiometric Survey Completed as Field Program Advances Phase 3 Drill Targeting
ASX:I88
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
• The Falls Lake prospect is located on 036683M and
036684M.
• The Portland Creek Uranium Project comprises eleven
mineral licences (036685M, 036831M, 036832M,
037495M, 037496M, 039752M, 039753M, 039754M,
039755M, 040509M and 040510M), totalling 1,316 claims
(approximately 329 km²), wholly owned by Infini
Newfoundland and Labrador Ltd. The project area was first
staked in 2023/24 with additional ground acquired in 2024
and 2025. A 2% Net Smelter Return (NSR) Royalty is
applicable on tenements 036831M and 036832M; the
Company is not aware of any other royalties or known
impediments to obtaining a licence to operate in the area.
The licences are currently live and in good standing.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other
parties.
• Exploration between 1976 and 1980 was carried out by the
Conwest Canadian Uranium Exploration JV. Work included
radon gas (Track Etch) sampling, a ground scintillometer
survey, and VLF-EM and ground magnetic surveys. Follow-
up drilling using a portable “Pionjar” drill capable of drilling
to 8 m depth identified a small, high grade uranium anomaly
(so-called “loam deposit”). Only very sparse details survive
on this drilling program with no assay results or location
data. Five diamond holes were drilled. Partial results have
been found for only one of these, which reported
unmineralised granite.
• Publicly available data was sourced from the Canadian
Airborne Geophysical Database (CAGD) for an airborne
magnetic and radiometric geophysics survey conducted
over the Great Northern Peninsula (North Arm) that was
flown by a fixed-wing aircraft in 1987 at a height of 250m
and line spacing of 1,000m for a total of 11,892 line km.
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
Portland Creek Radiometric Survey Completed as Field Program Advances Phase 3 Drill Targeting
ASX:I88
Criteria JORC Code explanation Commentary
• Subsequent exploration in 2007 included an airborne
IMPULSE EM, magnetic and radiometric survey flown on
behalf of Ucore Uranium Inc. and collection of 8 rock
samples. The property was abandoned shortly after.
Geology • Deposit type, geological setting and style of mineralisation. • The target uranium deposit type is likely to be shear-zone
hosted (albitite-type) in altered granite.
Drill hole
Information
• A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
• If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
• Locations and results of most holes drilled by the Conwest
JV are unknown. The limited historical exploration records
are publicly available in the Government of Newfoundland
and Labrador’s GeoScience OnLine system under the
report IDs: 012I/03/0125 and NFLD/3082.
• Previous drill hole details:
Hole
UTM
East
UTM
North
UTM
Elevation
(m)
Azi-
muth
Dip
Length
(m)
PCDD
25-007
470745 5559555 131 160 -45 130
PCDD
25-008
470730 5559405 128 320 -45 200
PCDD
25-
009A
470740 5559787 132 184 -45 317
PCDD
25-010
470291 5557916 123 170 -45 263
PCDD
25-
011A
470291 5557915 123 170 -65 161
PCDD
25-012
470461 5557972 123 170 -45 350
PCDD
25-013
470635 5558966 128 340 -45 221
PCDD
25-014
470462 5558025 131 170 -45 446
Portland Creek Radiometric Survey Completed as Field Program Advances
Phase 3 Drill Targeting
Portland Creek Radiometric Survey Completed as Field Program Advances Phase 3 Drill Targeting
ASX:I88
Criteria JORC Code explanation Commentary
PCDD
25-015
470488 5556666 118 170 -45 332
PCDD
25-016
470515 5558036 133 170 -45 425
PCDD
25-017
470700 5557873 135 327 -45 491
PCDD
25-018
470718 5558182 131 3 -45 251
Share your feedback