Released 24 July 2025
Major Bedrock Conductors Identified at
Reynolds Lake Uranium Project
Interpretation of airborne electromagnetic survey results identifies multiple large-scale
electrical conductors (largest >10 km long) coincident with radiometric anomalies and
magnetic lows, suggestive of shallow unconformity-style uranium mineralisation on the
outboard edge of the Athabasca Basin.
First modern airborne electromagnetic survey completed over Infini’s 100% owned
Reynolds Lake Uranium Project, comprising 1,100 line km airborne TDEM survey
over highly prospective tenure in the Athabasca Region of Saskatchewan, Canada.
Notable vertically dipping, parallel bedrock EM conductors >10 km in length
identified within the southern portion of the project, coincident with magnetic lows
and radiometric U anomalism. The majority of newly identified target areas have
not been subject to any modern exploration.
TDEM survey data indicates that unconformity targets at Reynolds Lake are
relatively shallow (possible ~20 m depth to anomaly), representing an extremely
attractive setting for possible near-surface Uranium mineralisation.
Detailed desktop study to collate and combine available geophysics and
geochemical data nearing completion in coming weeks, identifying key targets for
further exploration.
Infini Resources Ltd (ASX: I88, “Infini” or the “Company”) is pleased to announce the results of its
high-resolution airborne electromagnetic (EM) survey conducted over the 100%-owned Reynolds Lake
Uranium Project, located in Saskatchewan, Canada.
Airborne EM Survey of Reynolds Lake Uranium Project
Earlier in 2025, Infini completed 1,100 line km of time-domain electromagnetic (TDEM) survey (Annexure
A) over the Reynolds Lake Uranium Project, the first property-wide airborne EM survey over the
prospective project since the 1970’s. Developments in exploration technology since that time period
enable greater spatial resolution and penetrating power, able to resolve conductors beneath conductive
glacial overburden and allowing the Company greater insights into the prospectivity of the project. Since
completing the TDEM survey, the Company has engaged geophysicists Resource Potentials to interpret
the data collected from the airborne survey to precisely locate any EM anomalies that will aid in geological
interpretations and advanced exploration targeting.
Interpretation of the TDEM data has identified significant parallel bedrock EM conductors within the
Reynolds Lake Uranium Project, most notably two >10 km long conductors located in the southern
portion of the project area. Figure 1 illustrates the coincidence of the main conductors, indicative of the
presence of graphite with a magnetic low, signifying a prospective metapelitic rock package adjacent to
the Needle Falls Shear Zone. The presence of graphite is important given its role in the reduction and
precipitation process of uranium and typical for unconformity-style uranium mineralisation associated with
the Athabasca Basin.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
1
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Figure 1: Reynolds Lake semi-transparent Xcite EM decay image where hot colours indicate electrical conductors, over a
greyscale magnetic derivative image. Note the conductors are coincident with mag-low trends.
Regional radiometric data was also analysed in the interpretation of the TDEM survey results. Figure 2
illustrates the identification of uranium radiometric anomalies across the Reynolds Lake Uranium Project.
Important to note is the coincidence of U anomalism with the EM conductors. This suggests the potential
near-surface presence of uranium mineralisation within the potential large-scale graphitic zones identified
in the survey.
Situated within the Needle Falls Shear Zone at the outboard edge of the Athabasca Basin, the Reynolds
Lake Uranium Project is located at the outcropping interface of the Wollaston Domain and Peter Lake
Domain, with any potential uranium mineralisation expected to be near surface.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
2
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Interpretation of the TDEM survey data suggests that the EM conductors are vertically dipping
and may be as shallow as 20m, significantly shallower than many well-known deposits within the
Athabasca Basin (e.g. Cameco’s operations at Cigar Lake ~480 mbgl3 and McArthur River
~530mbgl4), and likely to result in more efficient and cost effective exploration of any prospective
target areas.
Figure 2: Reynolds Lake radiometric image overlaid with electrical conductor anomalies. Note U anomalism also
coincident with conductor anomalies, indicative of potential Uranium mineralization of conductive structures.
Infini’s Chief Executive Officer, Rohan Bone, said: "Outcomes from the TDEM survey over the
Reynolds Lake Uranium Project, previously untested by property-wide modern airborne survey methods,
are extremely promising. The identification of major EM conductors in an historically underexplored region
located on the outboard edge of the Athabasca Basin is highly significant.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
3
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
The coincidence of key geophysics markers across multiple large-scale anomalies reinforces the
prospectivity for unconformity-style uranium mineralisation. Importantly, results of the geophysics
interpretation suggesting that the anomaly is near surface with potential for outcropping, meaning these
anomalies can be explored efficiently and rapidly.
We are increasingly impressed with the recently acquired Reynolds Lake Uranium Project and eagerly
look forward to the completion of the desktop study which will take into consideration all available
geophysics, geochemistry and mapping data to generate walk-up targets for the next phase of
exploration.”
Next steps at the Reynolds Lake Uranium Project
Results from the interpretation of the TDEM survey data will now be included within the ongoing broader
detailed desktop study. The objective of the desktop study is to collate and interpret all available
geophysics, geochemistry and mapping data to identify prospective targets for further exploration. It is
anticipated that the desktop study will be concluded in the coming weeks before commencing the
evaluation and planning of an inaugural field campaign of lithogeochemical sampling, prospecting and
mapping at the Reynolds Lake Uranium Project.
About Reynolds Lake Uranium Project
The Reynolds Lake Uranium Project, as shown in Figure 3, comprises 12 claims covering 386 km²,
located on the eastern outboard edge of the Athabasca Basin in northern Saskatchewan — a benchmark
region globally renowned for high-grade uranium. The property lies approximately 40 km east of the
community of Wollaston Lake. It is flanked by the Keeping Lake Project to the north and the Jewison Lake
Project to the south.
Figure 3: Location of the Reynolds Lake Uranium Project relative to the world-renowned Athabasca Basin, synonymous
with high-grade uranium deposits, and in close proximity to existing operations, access and infrastructure.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
4
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Exploration outside the basin margin is driven by evidence that the geological conditions necessary for
unconformity-type deposit formation — namely, reactivated basement structures, graphitic
metasedimentary rocks, and the presence of hydrothermal fluids — extend beyond the current limits of
Athabasca sandstone cover and are related to the paleo conditions when the Thelon and Athabasca
basins were joined in the Paleoproterozoic era, (1.7 to 1.6 Ga).
The Reynolds Lake Project is underlain by Archean felsic gneisses, which are overlain by a sequence of
Lower Proterozoic metamorphic rocks of the Wollaston Domain. This sequence includes quartzite, mafic
gneiss, meta-arkose, and calc-silicate units. The structural fabric of the area is dominated by northeasttrending isoclinal folding. A major structural feature, the Needle Falls Shear Zone, transects the project
area with a northeast-southwest orientation. Graphitic schists and gneisses — critical host rocks for
unconformity-type uranium mineralisation — have been identified at several locations across the property.
References
1.
2.
3.
4.
ASX Release, Infini Resources, Infini Advances its Canadian Uranium Portfolio, 2nd June 2025.
ASX Release, Infini Resources, Infini Completes Acquisition Of Athabasca Basin Projects, 31st
March 2025.
Cameco website, Cigar Lake Operations, https://www.cameco.com/businesses/uraniumoperations/canada/cigar-lake, accessed 23rd July 2025.
Cameco
website,
McArthur
River
/
Key
Lake
Operations,
https://www.cameco.com/businesses/uranium-operations/canada/mcarthur-river-key-lake,
accessed 23rd July 2025.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
5
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and more
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JOR 2012 Mineral Resource Deposit
JORC 2012 Classification
Tonnes and Grade
Des Herbiers (U)
Inferred Combined Resource
162 Mt @ 123ppm U3O8 (43.95mlb)
Competent Person & Compliance Statement
The information in this report that relates to exploration results for the Reynolds Lake Project is based on, and fairly represents,
information and supporting documentation compiled and evaluated by Mark Couzens, a consulting geologist to the Company who
is a Member of the AusIMM. Mr. Couzens has sufficient experience relevant to the style of mineralisation, type of deposit under
consideration, and the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australian
Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Mr. Couzens consents to the
inclusion of the information in the form and context in which it appears. The information in the market announcement is an accurate
representation of the available data and studies for the Reynolds Lake Project.
This announcement contains information on the Reynolds Lake Uranium Project extracted from ASX market announcements dated
25 February 2025, 31 March 2025 and 2 June 2025 reported in accordance with the 2012 edition of the “Australian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are
available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data
that materially affects the information included in the original market announcement.
This report contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s Prospectus
dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in
any original announcement and that all material assumptions and technical parameters underpinning the estimates in the original
market announcement continue to apply and have not materially changed. The original market announcements are available to
view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
6
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Annexure A – Flight paths of TDEM surveys over the Reynolds and Boulding Lake Projects.
Figure 4: Flight path of the TDEM survey conducted over the Reynolds Lake Project in the Athabasca region.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
7
ASX Announcement
Released 14 July 2025
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
•
•
•
•
Drilling
techniques
Infini Resources Limited
•
Commentary
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
•
•
The helicopter-borne Time-Domain Electromagnetic (TDEM)
survey over the Reynolds Lake project was flown along
450m spaced traverse lines oriented 130o – 310o and
4,500m spaced tie-back lines oriented 040 o – 220o for a total
of 1,108-line kilometers flown.
The system utilizes a patented inflatable transmitter loop with
a diameter of approximately 20 meters, suspended about 30
meters below the helicopter. It features a programmable
waveform with a fast turn-off time, allowing for flexibility in
data acquisition and improved resolution of both shallow and
deep targets. The instrument is able to measure Dipole
moment up to 372,000 NIA (Newton–ampere).
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
•
Not applicable due to no drilling undertaken.
ABN 77 656 098 583
http://www.infiniresources.com.au
InfiniResources
8
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Criteria
Drill sample
recovery
JORC Code explanation
•
•
•
Logging
•
•
•
Sub-sampling
techniques
and sample
preparation
•
•
•
•
•
•
Infini Resources Limited
www.infiniresources.com.au
Commentary
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
•
Not applicable due to no drilling undertaken.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
•
Not applicable due to no drilling undertaken.
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
•
Not applicable due to no drilling undertaken.
ABN 77 656 098 583
InfiniResources
9
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Criteria
Quality of
assay data
and laboratory
tests
JORC Code explanation
•
•
•
Verification of
sampling and
assaying
•
•
•
•
Location of
data points
•
•
•
Commentary
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the technique
is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
•
Not applicable due to no geochemical sampling
undertaken.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
•
Not applicable due to no geochemical sampling undertaken.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
•
All survey location data is in NAD83 UTM Zone 13N.
The GPS was a Novatel DL-V31L2, with differential
correction and utilizes 12 satellites with a recording rate of
20 Hz.
A Lazer altimeter was used, SF11/C (loop) and SF00 (Heli)
with a 1cm resolution, recording rate 20Hz.
The method used is highly accurate and effective.
•
•
Data spacing
and
distribution
Infini Resources Limited
www.infiniresources.com.au
•
Data spacing for reporting of Exploration Results.
•
•
Not applicable as no Mineral Resource and Ore Reserves
are reported.
No sample compositing has been applied.
ABN 77 656 098 583
InfiniResources
10
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Criteria
JORC Code explanation
•
•
Orientation of
data in relation
to geological
structure
•
•
Commentary
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
•
•
The helicopter-borne Time-Domain Electromagnetic
(TDEM) survey over the Reynolds Lake project was flown
along 450m spaced traverse lines oriented 130o – 310o and
4,500m spaced tie-back lines oriented 040 o – 220o for a
total of 1,108-line kilometers flown.
The traverse flight lines are oriented perpendicular to the
interpreted major fault system which is considered
appropriate for this early level of exploration.
Sample
security
•
The measures taken to ensure sample security.
•
Not applicable due to no geochemical sampling undertaken.
Audits or
reviews
•
The results of any audits or reviews of sampling techniques
and data.
•
Review of the data was carried out by Resources Potentials
1/46 Hasler Road, Osborne Park, WA 6017, web site:
www.respot.com.au
Infini Resources Limited
www.infiniresources.com.au
ABN 77 656 098 583
InfiniResources
11
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
•
•
Commentary
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
•
•
The Reynolds Lake uranium project comprises twelve
mineral claims (MC00016423 - MC00016434). The
company acquired the project in 2025 (100% ownership)
and is not aware of any royalties existing on the claims or
impediments to obtaining a license to operate in the area.
The claims are currently live and in good standing.
Exploration
done by other
parties
•
Acknowledgment and appraisal of exploration by other
parties.
•
Review of historical exploration data (referred to in this
document as the Desktop Study) is ongoing. This review will
identify any exploration activities performed by other parties
at the Reynolds Lake project. Historical exploration data is
available through the Canadian Geological Society’s portal.
Geology
•
Deposit type, geological setting and style of mineralisation.
•
The target uranium deposit type remains uncertain at this
early stage of exploration but may include high-grade
unconformity-style deposits (e.g., Cigar Lake and McClean
Lake in Saskatchewan) or structurally controlled albititetype deposits (also referred to as shear zone-hosted
uranium).
Drill hole
Information
•
A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar
dip and azimuth of the hole
•
Review of historical drillhole data (referred to in this
document as the Desktop Study) is ongoing. This review will
identify and detail any drillholes executed historically by
other parties at the Reynolds Lake project. Historical
exploration data is available through the Canadian
Geological Society’s portal.
•
•
•
Infini Resources Limited
www.infiniresources.com.au
ABN 77 656 098 583
InfiniResources
12
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Criteria
Data
aggregation
methods
JORC Code explanation
•
•
•
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
•
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
•
Not applicable due to no drilling undertaken.
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect (eg
‘down hole length, true width not known’).
•
Not applicable due to no drilling undertaken.
Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
•
Appropriate diagrams are included in the main body of this
report. No significant discovery is being reported.
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Infini Resources Limited
www.infiniresources.com.au
Commentary
•
•
•
•
ABN 77 656 098 583
InfiniResources
13
Major Bedrock Conductors Identified at Reynolds Lake Uranium Project
Criteria
JORC Code explanation
Commentary
Balanced
reporting
•
Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
•
Not applicable due to no geochemical sampling undertaken.
Other
substantive
exploration
data
•
Other exploration data, if meaningful and material, should
be reported including (but not limited to): geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
•
No meaningful and material exploration data has been
excluded from this report.
Further work
•
The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale stepout drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations and
future drilling areas, provided this information is not
commercially sensitive.
•
Review of available exploration datasets at the Reynolds
Lake Project is ongoing. The review will also identify any
key target areas considered for geochemical sampling,
geological mapping, and potentially drill testing.
Appropriate diagrams are included in the main body of this
report.
•
Infini Resources Limited
www.infiniresources.com.au
•
ABN 77 656 098 583
InfiniResources
14
Share your feedback
Discover