Amendment to ASX Announcement 22 September 2025
Released
Released
Announcement PDF
ASX Announcement
Released 2 October 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 1
Amendment to ASX Announcement;
Reynolds Lake Field Program Expanded to
Target New EM Anomalies
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) refers to its announcement released
on 22 September 2025 titled “Reynolds Field Program Expanded to Target New EM Anomalies”.
The attached amended announcement now includes further information under Listing Rule 5.7.1 in the
JORC Table 1 regarding the geophysical data generated at the Reitenbach Uranium Project.
The Company also confirms that it is not aware of any new information or data that materially affects the
information included in this announcement.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Amendment to ASX Announcement; Reynolds Lake Field Program
Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 2
About Reynolds Lake & Reitenbach Lake
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 19 mineral claims
covering a total footprint of 677 km² on the eastern outboard margin of the Athabasca Basin in northern
Saskatchewan. The projects are contiguous, with Reynolds Lake consisting of 12 claims (386 km²) and
Reitenbach Lake consisting of 7 claims (291 km²) adjoining the Reynolds Lake northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are
bisected by the crustal-scale Needle Falls Shear Zone, a major structural corridor separating the
Wollaston Domain to the west from the Peter Lake Domain to the east. The Wollaston Domain is
dominated by Paleoproterozoic siliciclastic metasediments including paragneiss, quartzite, and calc-
silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic granitoid gneisses and
supracrustal rocks. Both domains are strongly deformed and metamorphosed, with northeast-trending
isoclinal folding and later cross-cutting north–south fault systems that provide structural complexity and
potential pathways for hydrothermal fluid flow.
Graphitic schists and gneisses — key lithologies known to host unconformity-associated uranium
mineralisation — have been identified within the project area. These are spatially associated with
electromagnetic conductors, radiometric anomalies, and elevated uranium-in-lake sediment
geochemistry. Regionally, the geological setting is considered analogous to uranium systems at Eagle
Point and Rabbit Lake, where mineralisation occurs along graphitic shear zones at the boundary between
Wollaston metasediments and granitoid basement.
Figure 1: Location of the Reynolds Lake Uranium Project and Reitenbach Uranium Project relative to the
world-renowned Athabasca Basin, synonymous with high-grade uranium deposits, and in close proximity to
existing operations, access and infrastructure.
Amendment to ASX Announcement; Reynolds Lake Field Program
Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 3
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and more
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JOR 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 2: Overview of Infini's portfolio of projects and global footprint.
Competent Person & Compliance Statement
The information in this report that relates to exploration results for the Reynolds Lake Uranium Project and Reitenbach Lake Uranium
Project is based on, and fairly represents, information and supporting documentation compiled and evaluated by Mark Couzens,
Principal Geologist of the Company who is a Member of the AusIMM. Mr. Couzens has sufficient experience relevant to the style
of mineralisation, type of deposit under consideration, and the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC
Code). Mr. Couzens consents to the inclusion of the information in the form and context in which it appears. The information in the
market announcement is an accurate representation of the available data and studies for the Reynolds Lake Uranium Project and
the Reitenbach Lake Uranium Project.
This announcement contains information on the Reynolds Lake Uranium Project and the Reitenbach Lake Uranium Project
extracted from ASX market announcements dated 25 February 2025, 31 March 2025, 24 July 2025, 20 August 2025 and 9
September reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on
www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data that materially affects
the information included in the original market announcement.
This announcement contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s
Prospectus dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in
accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the
information included in any original announcement and that all material assumptions and technical parameters underpinning the
estimates in the original market announcement continue to apply and have not materially changed. The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
ASX Announcement
Released 2 October 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 1
Reynolds Lake Field Program Expanded to
Target New EM Anomalies
First modern airborne time domain electromagnetic survey completed over Infini’s
100% owned Reitenbach Lake Uranium Project, comprising 456 line km covering
highly prospective tenure in the Athabasca Region of Saskatchewan, Canada.
Multiple >10 km long conductors coincident with radiometric anomalies and
uranium-in-lake sediments identified along key structural corridors, indicating
potential for shallow unconformity-style uranium mineralisation.
Ongoing field program at Reynolds Lake expanded to include new targets
identified at Reitenbach Lake, with the aim of defining targets for a potential drill
program in 2026.
Fieldwork at Reynolds Lake has so far encountered highly anomalous radioactive
boulders and exposed bedrock, with 59 samples exceeding scintillometer readings
of 1,000 cps up to a maximum value of 9,700 cps1
.
All samples to be sent to ALS for geochemical analysis, with assay results
expected in Q4 CY 2025.
Field program at Reynolds and Reitenbach complementary to Infini’s aggressive
uranium exploration strategy, with Phase 2 drilling currently underway at the highly
prospective Portland Creek Uranium Project.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to announce the expansion
of its ongoing field program at the Reynolds Lake Uranium Project, following interpretation of the first
modern airborne electromagnetic survey at the adjacent Reitenbach Lake Uranium Project. This strategic
step positions the Company to define potential drill targets across both properties ahead of a planned
maiden drill program.
Airborne EM Survey of Reitenbach Lake Uranium Project
Infini completed 456 line km of time-domain electromagnetic (TDEM) survey over the Reitenbach Lake
Uranium Project, representing the first exploration activities across the project since the 1970s. The
survey was flown at a combination of 200 m and 400 m line spacings, providing high-resolution data
capable of detecting conductive horizons beneath glacial overburden. Advances in survey technology
since the historical work enable greater penetration and spatial resolution, significantly enhancing Infini’s
ability to assess the project’s uranium prospectivity.
The Company engaged geophysicists Resource Potentials to interpret the Reitenbach Lake dataset.
Interpretation of the TDEM data has identified multiple >10 km long significant, parallel bedrock
conductors across the project area. These conductors are spatially associated with magnetic lows,
consistent with graphitic metasedimentary packages within the Wollaston Domain, intersected by N-S
1. Cautionary Statement: In relation to handheld scintillometer readings, the Company cautions that measurements of radioactivity
from scintillometer readings are preliminary in nature and should not be considered a proxy or substitute for quantitative analysis of
a laboratory assay result. While scintillometers confirm the presence of radioactivity, it does not accurately determine elemental
uranium concentrations and can also be influenced by the presence of thorium and potassium.
Reynolds Lake Field Program Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 2
oriented cross-cutting fault structures and adjacent to the Needle Falls Shear Zone Graphite is considered
an important reductant in the precipitation of uranium and its presence is a hallmark of unconformity-style
mineralisation within the Athabasca Basin.
Regional radiometric datasets were also reviewed in conjunction with the TDEM results. The analysis
highlights the coincidence of uranium radiometric anomalies with the mapped EM conductors across the
project. This spatial correlation suggests the potential for near-surface uranium mineralisation associated
with graphitic shear zones inferred from the survey.
The Reitenbach Lake Project is situated along the Needle Falls Shear Zone at the outboard margin of
the Athabasca Basin, where the Wollaston Domain and Peter Lake Domain converge at surface.
Interpretation of the TDEM data suggests that many of the conductors are shallow and steeply dipping.
This shallow structural setting contrasts with several of the Basin’s largest uranium deposits,
such as Cigar Lake (~480 m below surface5
) and McArthur River (~530 m below surface6
),
underscoring the potential for a near-surface uranium discovery at both Reynolds and Reitenbach
Lake Projects.
Infini’s Chief Executive Officer, Rohan Bone, said: "The field program at Reynolds Lake is delivering
extremely promising early results, and by extending this work into Reitenbach Lake we are accelerating
the systematic evaluation of two highly prospective projects in parallel. With shallow conductors,
coincident radiometric anomalies, and confirmed surface alteration, both projects present compelling
potential as we build towards defining high-priority Uranium drill targets in one of the world’s premier
uranium mining jurisdiction.”
Figure 1: Overview of priority target area of Reitenbach Lake field program relative to significant EM
anomalism, interpreted structures, radiometric anomalism and lake sediment geochemistry. Note
coincidence of EM targets with interpreted shears, N-S faults and radiometric anomalism.
Reynolds Lake Field Program Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 3
Next steps at the Reitenbach Lake Uranium Project
Based on these highly prospective results, the Company has elected to expand the field program already
underway at Reynolds Lake to also include the priority targets identified at the Reitenbach Lake Uranium
Project. This extended program will systematically evaluate the priority target area illustrated in Figure 1,
ground-truthing anomalies identified in the geophysical interpretation and refining geological models to
advance towards potential drill targeting.
The scope of work being conducted during the field program includes:
• Soil sampling on systematic grids across anomaly zones;
• Rock chip sampling of outcropping uranium-bearing lithologies and glacial boulders;
• Geological mapping to confirm shear zones and fault structures;
• Using portable XRF devices (pXRF) in the field to guide the fieldwork programs; and
• Submitting samples for laboratory analysis using industry-standard methods for uranium and
pathfinder elements.
The field program is expected to be completed in September 2025, with assay results anticipated in Q4
CY2025.
Update on the field program at Reynolds Lake
Infini’s maiden field program at the Reynolds Lake Uranium Project is progressing strongly, with
systematic sampling and mapping well advanced across key target areas. To date, the team has collected
690 soil samples and 124 rock samples, establishing a significant geochemical dataset to support
geological interpretation and future drill targeting.
Initial geological observations confirm that the property is underlain by lithologies consistent with regional
mapping and that a well-developed northeast–southwest foliation is evident throughout much of the
property, aligning with regional structural trends. Localised magnetite and hematite have been observed
along with areas of moderate silica alteration, indicative of hydrothermal alteration confirming the highly
prospective exploration areas. 59 locations were noted to record scintillometer readings exceeding
1,000 counts per second with a maximum of 9,700 counts per second1
. These features are
consistent with the types of alteration and structural controls known to influence uranium mineralisation
in the Athabasca Basin region.
Cautionary Statement: In relation to handheld scintillometer readings, the Company cautions that
measurements of radioactivity from scintillometer readings are preliminary in nature and should not be
considered a proxy or substitute for quantitative analysis of a laboratory assay result. While scintillometers
confirm the presence of radioactivity, it does not accurately determine elemental uranium concentrations
and can also be influenced by the presence of thorium and potassium.
Reynolds Lake Field Program Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 4
Figure 2: Field team on site at Reitenbach Lake mapping and using the RS-125 Scintillometer to gather and
assess the radioactive readings, 59 locations were noted to record scintillometer readings exceeding 1,000
counts per second with a maximum of 9,700 counts per second1
, indicating significant localized radioactivity.
References
2. ASX Release, Infini Resources, Commencement of Maiden Field Program at Reynolds Lake
Uranium Project, 9 September 2025.
3. ASX Release, Infini Resources, Further Priority Targets Identified at Reynolds Lake Uranium Project,
20 August 2025.
4. ASX Release, Infini Resources, Infini to Acquire Major Footprint in Athabasca Basin, 25 February
2025.
5. Cameco website, Cigar Lake Operations, https://www.cameco.com/businesses/uranium-
operations/canada/cigar-lake, accessed 23rd
July 2025.
6. Cameco website, McArthur River / Key Lake Operations,
https://www.cameco.com/businesses/uranium-operations/canada/mcarthur-river-key-lake,
accessed 23rd
July 2025.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Reynolds Lake Field Program Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 5
About Reynolds Lake & Reitenbach Lake
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 19 mineral claims
covering a total footprint of 677 km² on the eastern outboard margin of the Athabasca Basin in northern
Saskatchewan. The projects are contiguous, with Reynolds Lake consisting of 12 claims (386 km²) and
Reitenbach Lake consisting of 7 claims (291 km²) adjoining the Reynolds Lake northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are
bisected by the crustal-scale Needle Falls Shear Zone, a major structural corridor separating the
Wollaston Domain to the west from the Peter Lake Domain to the east. The Wollaston Domain is
dominated by Paleoproterozoic siliciclastic metasediments including paragneiss, quartzite, and calc-
silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic granitoid gneisses and
supracrustal rocks. Both domains are strongly deformed and metamorphosed, with northeast-trending
isoclinal folding and later cross-cutting north–south fault systems that provide structural complexity and
potential pathways for hydrothermal fluid flow.
Graphitic schists and gneisses — key lithologies known to host unconformity-associated uranium
mineralisation — have been identified within the project area. These are spatially associated with
electromagnetic conductors, radiometric anomalies, and elevated uranium-in-lake sediment
geochemistry. Regionally, the geological setting is considered analogous to uranium systems at Eagle
Point and Rabbit Lake, where mineralisation occurs along graphitic shear zones at the boundary between
Wollaston metasediments and granitoid basement.
Figure 3: Location of the Reynolds Lake Uranium Project and Reitenbach Uranium Project relative to the
world-renowned Athabasca Basin, synonymous with high-grade uranium deposits, and in close proximity to
existing operations, access and infrastructure.
Reynolds Lake Field Program Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 6
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and more
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JOR 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 4: Overview of Infini's portfolio of projects and global footprint.
Competent Person & Compliance Statement
The information in this report that relates to exploration results for the Reynolds Lake Uranium Project and Reitenbach Lake Uranium
Project is based on, and fairly represents, information and supporting documentation compiled and evaluated by Mark Couzens,
Principal Geologist of the Company who is a Member of the AusIMM. Mr. Couzens has sufficient experience relevant to the style
of mineralisation, type of deposit under consideration, and the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC
Code). Mr. Couzens consents to the inclusion of the information in the form and context in which it appears. The information in the
market announcement is an accurate representation of the available data and studies for the Reynolds Lake Uranium Project and
the Reitenbach Lake Uranium Project.
This announcement contains information on the Reynolds Lake Uranium Project and the Reitenbach Lake Uranium Project
extracted from ASX market announcements dated 25 February 2025, 31 March 2025, 24 July 2025, 20 August 2025 and 9
September reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on
www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data that materially affects
the information included in the original market announcement.
This announcement contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s
Prospectus dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in
accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the
information included in any original announcement and that all material assumptions and technical parameters underpinning the
estimates in the original market announcement continue to apply and have not materially changed. The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Reynolds Lake Field Program Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 7
Appendix
Table 1: Scintillometer readings (greater than 1,000 counts per second) of samples taken to date during the
ongoing field program at the Reynolds Lake Uranium Project.
Sample ID Easting (m) Northing (m) Elevation (m)
Scintillometer
Reading (cps)1
25RNJG001 619445 6416518 451 1,240
25RNJG002 619364 6416381 444 1,200
25RNJG004 619771 6415847 429 1,200
25RNJG008 619984 6416156 427 1,500
25RNCF002 619730 6416592 409 1,070
25RNCF004 619744 6416185 399 1,500
25RNCF008 620037 6416380 396 1,137
25RNBP004 620154 6416667 Not available 1,140
25RNBP005 620450 6416270 Not available 1,210
25RNGG008 618888 6416389 415 1,038
25RNGG010 619148 6415773 418 1,025
25RNGG011 619139 6415746 412 1,266
25RNGG012 619023 6415730 421 1,739
25RNJG021 620664 6417733 440 2,168
25RNJG025 621400 6418249 419 1,377
25RNJG027 621564 6418468 416 1,509
25RNJG031 620599 6417982 433 1,400
25RNCF010 620594 6416809 408 3,685
25RNCF011 620719 6416794 400 1,046
25RNCF015 621060 6417162 397 2,162
25RNCF017 621220 6417230 393 1,700
25RNCF018 621093 6417356 400 1,700
25RNBP023 618950 6415403 Not available 1,570
25RNGG017 618615 6415295 398 1,106
25RNGG018 618392 6415100 399 1,177
25RNGG019 618220 6415043 405 1,314
25RNGG025 617577 6415495 409 5,287
25RNJG035 620179 6418260 451 1,167
25RNJG037 620757 6418393 421 9,700
25RNJG038 620911 6418434 425 1,700
Reynolds Lake Field Program Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 8
Sample ID Easting (m) Northing (m) Elevation (m)
Scintillometer
Reading (cps)1
25RNJG039 621044 6418830 428 1,300
25RNGG32 622029 6420000 409 1,027
25RNGG36 621436 6420190 417 2,121
25RNGG38 621198 6419951 413 2,338
25RNGG40 621519 6419621 395 1,120
25RNGG41 621766 6419534 395 1,127
25RNGG45 622029 6419737 391 1,020
25RNBP042 622468 6417875 Not available 2,730
25RNJG042 622351 6420337 429 1,134
25RNJG043 622279 6420354 436 2,845
25RNJG048 622111 6420969 438 1,100
25RNJG049 622085 6421189 428 2,900
25RNJG053 622395 6420898 426 1,100
25RNCF031 623191 6421929 377 1,085
25RNCF032 623253 6422042 376 1,042
25RNGG45B 623752 6419460 375 1,200
25RNGG56 623772 6419624 371 1,073
25RNBP048 623767 6419511 Not available 1,400
25RNBP049 624440 6419326 Not available 2,100
25RNBP054 625171 6419908 Not available 1,300
25RNBP055 624495 6420873 Not available 3,000
25RNCF042 624439 6417961 373 1,050
25RNGG059 620666 6418437 398 1,650
25RNGG060 620463 6418370 416 1,418
25RNJG069 620747 6418396 Not available 3,300
25RNJG070 620739 6418341 Not available 2,500
25RNJG071 620669 6418254 Not available 2,300
25RNJG072 620464 6418356 458 7,000
25RNCF047 624912 6425506 391 2,000
ASX Announcement
Released 30 September 2025
Infini Resources Limited ABN 77 656 098 583 http://www.infiniresources.com.au
InfiniResources
9
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
• Mapping and Prospecting Samples
Mapping and prospecting include both select grab samples
and lithological geochemical (LGC) grab samples. Select
samples are guided by a handheld scintillometer (RS-125
Super-SPEC), targeting anomalous readings greater than
400 cps. LGC samples are prioritized based on lithology,
alteration, and mineralization, consistent with industry
standards. For both sampling types, UTM coordinates,
sample site details, and lithology/alteration/mineralization
descriptions are collected and stored digitally.
• Soil Samples
Soil samples are collected on a predefined grid with NE/SW-
oriented lines spaced 200 m apart, and sample stations
spaced 100 m along each line. Traditional C-horizon soils
are collected where possible; if the C-horizon is absent, B-
horizon samples are taken instead. For each soil sample,
coordinates, site details, and soil horizon are recorded
digitally.
• Reitenbach Geophysics Survey
The helicopter-borne Time-Domain Electromagnetic (TDEM)
survey over the Reitenbach Lake project was flown along
450m spaced traverse lines oriented 130o
– 310o
and
4,500m spaced tie-back lines oriented 040 o
– 220o
for a total
of 456-line kilometers flown.
Reynolds Lake Field Program Expanded to Target New EM Anomalies
Infini Resources Limited ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
10
Criteria JORC Code explanation Commentary
The system utilizes a patented inflatable transmitter loop with
a diameter of approximately 20 meters, suspended about 30
meters below the helicopter. It features a programmable
waveform with a fast turn-off time, allowing for flexibility in
data acquisition and improved resolution of both shallow and
deep targets. The instrument is able to measure Dipole
moment up to 372,000 NIA (Newton–ampere).
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
• Not applicable due to no drilling undertaken.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade
Share your feedback
Discover