Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
Released 31 July 2025
Quarterly Activities Report For
Period Ending 30 June 2025
Quarterly Highlights
Announcement of Phase 2 Diamond Drilling Program for Portland Creek Uranium
Project, Newfoundland. Exploration modelling and target generation ongoing,
based on promising maiden drill program results, supporting prospectivity for a
Shear-Hosted Uranium System.
Large-scale desktop studies progressed to define targets for Infini’s inaugural
field campaign for the Reynolds Lake and Boulding Lake Uranium Projects,
Saskatchewan.
First modern airborne surveys completed over Infini’s 100% owned Boulding
Lake and Reynolds Lake Uranium Projects, comprising a total of 2,400 line km
TDEM and magnetic airborne surveys over highly prospective tenure in the
Athabasca Region of Saskatchewan, Canada. Infini’s first airborne
electromagnetic survey over Reynolds Lake. Reynolds Lake Release of results in
July identified multiple large-scale bedrock conductors, supporting possible
near-surface Uranium mineralisation.
Appointment of internationally experienced mining executive Mr Rohan Bone as
Infini Chief Executive Officer, to lead the Company’s next growth phase across
its highly prospective uranium projects in Canada and Western Australia and
bolster team capability.
Infini Resources Ltd (ASX: I88, “Infini” or the “Company”) is pleased to report on its activities for the
quarter ended 30 June 2025 (the “Quarter”). During the Quarter, the Company advanced its project
portfolio with next phase exploration planning focused on its uranium prospects in Canada, including its
flagship Portland Creek Uranium Project, located in Newfoundland, and the Reynolds Lake and Boulding
Lake Uranium Projects, located in Saskatchewan. The Company also announced a critical appointment
to Infini’s leadership team, as it pushes ahead with its next strategic growth phase.
Summary of Exploration Activities
Portland Creek Uranium Project (100% owned, Newfoundland Canada)
The Portland Creek Project covers an area of 149km2 and is situated in the Precambrian Long-Range
Complex of the Humber Tectonic – Stratigraphic zone. This zone contains metaquartzite and a suite of
paragneisses, intruded by leucocratic pink granite, which is locally radioactive. Infini’s Claims are
situated over a large regional uranium anomaly that was identified in the 1970s by a Newfoundland
government sampling program. There was previously one uranium showing on the property as listed in
the Newfoundland Mineral Deposit Index inventory with a rock sample assaying at 2,180 ppm U3O8 (refer
Prospectus dated 30 November 2023).
Since listing, the Company has defined a high-grade uranium in soil anomaly at the Falls Lake prospect
measuring ~800m x 100m with a peak result of 74,997 ppm U3O8 (Trident Lake Zone). In addition, Infini
identified a cluster of anomalous soil samples, with a peak value of 1,500 ppm U3O8 lying 1.5km south of
the area of current drilling (ASX:I88 Announcements 1 July 2024, 10 July 2024 & 14 October 2024) (Falls
Lake Prospect). This soil anomaly will be a focus of further exploration.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
1
Quarterly Activities Report For Period Ending 30 June 2025
Preparations for Phase 2 Diamond Drilling Program at flagship Portland Creek project
During the Quarter, exploration modelling and target generation continued to be undertaken for the
second phase of Infini’s diamond drilling program at the highly prospective Portland Creek Project.
Encouraging Phase 1 results announced in early July 2025 (ASX:I88 Announcement 4 July 2025) will
inform Phase 2 targets. Phase 1 drilling consisted of a six-hole program (of up to 23 permitted holes) and
focused on the high-grade uranium-in-soil results identified at the Falls Lake Prospect. The Falls Lake
Prospect is part of the broader Trident Lake Zone, a 6km long corridor of anomalous uranium in soils and
lake sediments and radon gas in soils coincident with a major structural corridor.
A total of 1,386 core samples from the maiden Phase 1 drilling were collected and submitted for multielement analysis, with results confirming the presence of highly anomalous pathfinder elements and trace
uranium mineralisation. In addition to assay results, televiewer and spectral gamma ray logging were
completed on four holes by Terrane Geoscience Inc.
Observations from geological experts engaged in the refinement of the exploration model confirm the
possibility of a shear-hosted uranium system, while also suggesting the potential for alternative style
deposits.
The Company remains buoyed by the potential for a large-scale uranium discovery at Portland Creek
given the highly anomalous uranium-in-soil grades complemented by the observed presence of
widespread hydrothermal alteration, uranium pathfinders, radon gas, radiometrics and structural
indicators suggestive of a possible large, proximal uranium system. Importantly, interpretation of
structural data collected during the Phase 1 drill program indicates that the target primary structures have
not yet been intersected and remain untested.
Preparations are underway to refine the exploration model and drill targeting at Portland Creek, with
additional structural mapping and geochemical sampling planned ahead of the upcoming Phase 2 drilling
program, set to commence in August 2025.
Figure 1: Cross-section of the Fall Lake Prospect illustrating subparallel orientation of drillholes relative to the
orientation of the inferred thrust fault, leaving the primary structural target untested.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
2
Quarterly Activities Report For Period Ending 30 June 2025
Figure 2: Overview of exploration activity conducted at Portland Creek to date, demonstrating the occurrence of soil
sampling grades up to 74,997 ppm U₃O₈, anomalous radiometric data and Phase 1 drillholes.
Reynolds and Boulding Lake Uranium Projects (100% owned, Saskatchewan
Canada)
The Reynolds Lake and Boulding Lake Projects comprise a total landholding of 931km2, with both projects
located within 100km of the world class McArthur River and Eagle Point high grade uranium camps. The
Athabasca Basin is the world's richest source of high-grade uranium. Spanning approximately
100,000km2, it is host to some of the most prolific uranium deposits, including the Cigar Lake and
McArthur River mines.
The Reynolds Lake Project comprises a 677km2 landholding and contains reported anomalous uranium
in lake sediments and radiometric anomalies in proximity to the underexplored Needle Falls shear zone.
Boulding Lake is a 254km2 property directly adjacent to claims containing a large number of radioactive
boulders, with the potential for a primary uranium source within the project area.
Infini completed 100% acquisition of the two highly prospective properties in late Q3 FY2025.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
3
Quarterly Activities Report For Period Ending 30 June 2025
Figure 3: Location of the Reynolds Lake Uranium Project relative to the world-renowned Athabasca Basin, synonymous
with high-grade uranium deposits, and in close proximity to existing operations, access and infrastructure.
Reynolds Lake Airborne EM Survey data interpretation
During the Quarter, Infini completed 1,100 line km of time-domain electromagnetic (TDEM) survey over
the Reynolds Lake Uranium Project and and 1,300 line km of airborne magnetic survey over the Boulding
Lake project. This is the first time a property-wide airborne electromagnetic (EM) survey has been
completed over the highly prospective Reynolds Lake project since the 1970’s. Since then, developments
in exploration technology enable greater spatial resolution and penetrating power, able to resolve
conductors beneath conductive glacial overburden and allowing the Company greater insights into the
prospectivity of the project.
The Company engaged geophysicists Resource Potentials to interpret the data collected from the
airborne survey to precisely locate any EM anomalies that will aid in geological interpretations and
advanced exploration targeting.
The Company subsequently announced that TDEM data had identified significant parallel bedrock EM
conductors within the Reynolds Lake Uranium Project, most notably two >10km long conductors located
in the southern portion of the project area. the coincidence of the main conductors, indicative of the
presence of graphite with a magnetic low, signifying a prospective metapelitic rock package within the
Needle Falls Shear Zone. The presence of graphite is important given its role in the reduction and
precipitation process of uranium and typical for unconformity-style uranium mineralisation associated with
the Athabasca Basin (ASX:I88 Announcement 24 July 2025).
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
4
Quarterly Activities Report For Period Ending 30 June 2025
Figure 4: Reynolds Lake semi-transparent Xcite EM decay image where hot colours indicate electrical conductors, over
a greyscale magnetic derivative image. Note the conductors are coincident with mag-low trends.
Figure 5: Reynolds Lake radiometric image overlaid with electrical conductor anomalies. Note U anomalism also
coincident with conductor anomalies, indicative of potential Uranium mineralization of conductive structures.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
5
Quarterly Activities Report For Period Ending 30 June 2025
TDEM survey data indicates that unconformity targets at Reynolds Lake are relatively shallow (possible
~20m depth to anomaly), representing an extremely attractive setting for possible near-surface Uranium
mineralisation.
A detailed desktop study to collate and combine available geophysics and geochemical data to identify
key targets for further exploration at Reynolds Lake and Boulding Lake is progressing.
Figure 6: Configuration of XciteTM TDEM survey system.
Des Herbiers Uranium Deposit (100% owned, Québec Canada)
The Des Herbiers Uranium Project consists of 66 non-contiguous claims totaling 36.25 km2. It is located
within the Des Herbiers township, approximately 9km NW of the Baie-Johan-Beetz municipality and 52km
ENE of the municipality of Havre St-Pierre on the Gulf of St. Lawrence in Quebec, Canada. The Project
is situated in the Grenville Province of the Canadian Shield. The rocks underlying the immediate area are
comprised of biotite rich granitic rocks, quartzites and quartzo-feldspathic gneisses that are derived from
strongly metamorphosed sandstones and arkoses, amphibole rich gabbros and gneisses. Regional
structures trend north to northwest and display large-scale curvilinear folding. Historical exploration and
drilling have revealed an abundance of low grade, near surface, bulk tonnage uranium that contains a
combined JORC compliant inferred mineral resource of 162Mt @ 123ppm U3O82.
The Company did not complete any new work on the Des Herbiers project during the reporting period.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
6
Quarterly Activities Report For Period Ending 30 June 2025
Figure 7: The Des Herbiers Uranium Project in plan view depicting anomalous radiometrics (U2/Th), historical drilling and
trench channel sampling. Note the several large target areas that have never been drill tested.
Bellah Bore East Uranium Deposit (100% owned, Western Australia)
The Bellah Bore East deposit is approximately 500m x 150m in size and located within prospecting license
P 53/1703, comprising 92.67 hectares. The licence is situated within the western edge of the Company’s
already existing E 53/2188 tenement ~60km southwest of Wiluna. The deposit is hosted by calcrete and
comprises a historical inferred mineral resource in accordance with the JORC Code (2004) (it is noted
that these exploration results reported under the JORC 2004 code may not conform to the requirements
of the JORC Code 2012). Mineralisation is reported as open in the northeast. Carnotite is identified as
the primary ore mineral in historical drilling.
The Company did not complete any new work on the Bellah Bore East deposit during the reporting period.
Yeelirrie North Uranium Project (100% owned, Western Australia)
The Yeelirrie North Project currently consists of exploration licence E53/2188 and prospecting licence
P53/1703, covering an area of ~208km², located approximately 70km southwest of Wiluna, Western
Australia. If successfully granted, the new exploration licence applications will see the Company’s Project
size increase by an additional ~538km2, to a total area of ~746km2. The Yeelirrie Project is located near
the northern extremity of the Archaean Norseman Wiluna greenstone belt of the Yilgarn Craton. The
project is highly prospective for hosting high-grade uranium mineralised calcrete and lies within the same
geological domain as the world class Yeelirrie Uranium Deposit hosting 128.1Mlb U3O8 at an average ore
grade of 1500 ppm U3O8.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
7
Quarterly Activities Report For Period Ending 30 June 2025
The Company is continuing to progress its access and Aboriginal heritage agreements in relation to the
recent licence applications.
Figure 8: Location of the newly staked exploration licences (highlighted red) at the world-class Yeelirrie uranium camp
showing the geological rationale with extensive and coincidental uranium-thorium anomalism identified in regional
radiometrics.
Tinco Uranium-Niobium Project (75% Tinco North, 100% Tinco South,
Saskatchewan Canada)
The Tinco Uranium-Niobium Project lies to the south-southwest of the Athabasca Basin. It is underlain
by the Mudjatik Domain which is composed mainly of granitoid felsic gneisses of probable Archean age,
which are considered basement to narrow, arcuate to closed belts of supracrustal rocks of sedimentary
and volcanic origins. Two types of uranium mineralisation have been recognised in the area - occurrences
in remobilised basement and occurrences in supracrustal. Previous geological mapping has identified
lenses of radioactive pegmatite up to 1.5 m in width. Historical outcropping grab samples on the property
grade up to 600ppm U3O8 and 0.5% Nb.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
8
Quarterly Activities Report For Period Ending 30 June 2025
Figure 9: The magnetic imagery results of the Tinco survey. Note the location and coincidence of the mineralized grab
sample with a major new interpreted shear zone corridor measuring 6km x ~1.5km.
In Q3 FY2025 a heliborne magnetic, radiometric and time-domain electromagnetic survey was completed
covering both claims. The survey was flown along a west-northwest orientation with lines spaced 100m
apart. The total survey comprised of 1030-line kms, flown at an average height of 36 m. Southern
Geoscience Consultants processed the data to produce a set of filtered images. These images were
interpreted to delineate magnetic and radiometric trends, classification of structures, lineaments, faults
and folds, delineation and interpretation of stratigraphic relationships including contacts, and to produce
a set of targets
The survey results indicate that high-resolution magnetic imagery has identified the presence of a major
north-south trending shear zone that contains the historical mineralized grab sample of 600ppm U3O8,
0.5% Nb (ASX:I88 Announcement 25 February 2025). This provides the Company with a large U-Nb
target for future exploration activities. In addition, there are several large ovoid magnetic features of
interest in the centre of the claims which are an additional area of interest that may be followed up with
surface geochemical surveys.
The Company did not complete any new work on the Tinco Uranium-Niobium Project during the reporting
period.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
9
Quarterly Activities Report For Period Ending 30 June 2025
Paterson Lake Lithium Project (100% owned, Ontario Canada)
The Paterson Lake Project is located within the highly prospective Archean Separation Lake Greenstone
Belt of the Superior Province of Ontario, Canada. The Project has been documented to contain abundant
rare-metal bearing pegmatites including seven named petalite bearing pegmatites and up to 50 unnamed
pegmatites that require investigation. Historical outcrop grab sample results include results up to 4.43%
Li2O and the best reported historical drill intercept to date of 8m @ 3.12% Li2O. The Separation Rapids
Lithium Deposit of Avalon Advanced Materials/Sibelco $63M CAD joint venture is located within 2km of
the project boundary.
Figure 10: Location of the Paterson Lake Lithium Project depicting the microgravity survey locations overlain with 1VD
drone magnetics, MMI soil sampling, mineralised outcropping pegmatites and historical drillhole mineralisation.
The Company did not complete any new work on the Paterson Lake project during the reporting period.
Valor Lithium Project (50% owned, earn-in up to 100%, Québec Canada)
The Valor Project comprises 229 Claims covering an area of approximately 125km² in southwest Québec,
approximately 40km north-west of Val-d’Or. The project is situated on the Archean Preissac Lacorne
batholith, a syn-to post-tectonic intrusion that was emplaced in the Southern Volcanic Zone of the Abitibi
Greenstone Belt of the Superior Province of Québec. To the north the batholith is bounded by the
Manneville Fault and to the south by the Cadillac Fault and the eastward extension of the Porcupine
Destor Fault. The batholith, which is a composite body has associated pegmatites and quartz veins. After
completing soil sampling activities, the company has now identified several large scale LCT MMI
geochemical anomalies.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
10
Quarterly Activities Report For Period Ending 30 June 2025
The Company did not complete any new work on the Valor Lithium project during the reporting period.
Figure 11: Location of the Valor lithium project overlain with regional magnetics and historical mineral occurrences.
Pegasus Lithium Project (100% owned, Western Australia)
The Pegasus Lithium Project consists of one granted exploration licence (E74/715) which covers an area
of 40 Blocks (~121km²) located approximately 15km southeast of Ravensthorpe in the Esperance region
of Western Australia. The project is considered prospective for hard-rock lithium-tantalum mineralisation
based primarily on geological and structural analogues drawn from Allkem Limited’s Mt Cattlin lithium
deposit located approximately 10km to the east.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
11
Quarterly Activities Report For Period Ending 30 June 2025
Figure 12: Location of the Pegasus lithium project overlain with regional magnetics.
Two priority lithium targets have been identified from a previously conducted 278-sample program
measuring 1.4 km2 and 1.8 km2 with peak Li values of 129ppm and 86ppm, respectively (ASX:I88
Announcement 30 January 2025).
The Company did not complete any new work on the Pegasus Lithium Project during the reporting period.
Parna Lithium Project (100% owned, Western Australia)
The Parna Lithium Project consists of two exploration licenses (E63/2183 and E63/2184), covering an
area of 48 Blocks (~146km²) located within the Southern Cross Domain of the Youanmi Terrane. The
Company completed a first pass Ultrafine+™ soil sampling survey across the Parna East and West
tenements on 800m x 400m grids with the results showing peak values of 119 ppm Li, 14.6 ppb Au and
1600 ppm Ni.
The Company did not complete any new work on the Parna Lithium Project during the reporting period.
Schedule of Mining Tenements
The Company’s tenement and claim schedule is provided in Appendix 1.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
12
Quarterly Activities Report For Period Ending 30 June 2025
Corporate Activities
Board and Management Changes – Appointment of CEO
During the Quarter, the Company appointed Mr Rohan Bone as Chief Executive Officer. Mr Bone
commenced on 1 June 2025 and is a highly experienced mining executive and qualified mining engineer
with over 18 years of experience in the international mining industry, spanning Australia, Southeast Asia,
Canada and Europe.
His multi-commodity background and senior roles across leading mining organisations equip him with
deep technical and strategic capabilities essential to driving Infini’s next phase of growth.
Mr. Bone has held executive and senior leadership roles with companies including Alcoa (Senior Manager
of Operations Strategy and Study Manager), Thyssenkrupp Mining Technologies (Head of Contracts),
and Tata Steel Minerals Canada (Project Manager).
Mr Bone holds a Bachelor of Mining Engineering from the WA School of Mines and a Master of Civil
Engineering from the University of New South Wales and is a Member of the Australasian Institute of
Mining and Metallurgy (AusIMM). His strong academic foundation is complemented by nearly two
decades of global, multi-commodity mining experience and proven track record in operational leadership,
project development, and corporate strategy.
Finance
The Appendix 5B quarterly cashflow report for the quarter ended 30 June 2025 is submitted separately.
The Group closed the Quarter with a cash balance of $619k. Exploration expenditure during the quarter
totaled $1,210k (unaudited) and acquisition expenditure relating to Reynolds Lake and Boulding Lake
Uranium Projects totaled $100k (less balance date payables).
During the Quarter the Company received a grant of C$150k from the government of Newfoundland and
Labrador in relation to their Junior Explorer Program (JEA) for exploration work completed on our Portland
Creek project.
After Quarter end, the Company has received cash of circa $650k relating to tenement bonds held by the
Saskatchewan government and HST refunds.
Expenditure
In accordance with Listing Rule 5.3.4, Table 1 below compares the Company’s actual expenditure to 30
June 2025 in comparison with the estimated expenditure outlined in the ‘Use of Funds’ statement included
in the Prospectus.
Table 2: Use of funds comparison
Prospectus
Current Quarter
Total
Exploration & Development
(including cash consideration)
2,484,0001
1,189,244
6,495,031
Lead Manager & Cost of Offer
638,0002
-
753,192
Corporate Administration
960,000
552,714
2,650,029
Working Capital
1,218,000
512,705
1,399,584
-
(167,616)
5,300,000
2,087,027
Government Grants
Total
1
Cash Consideration $248k, Exploration & Development $2.236m
2
Lead Manager Fee $318k, Cost of Offer $320k
Infini Resources Limited
ABN 77 656 098 583
11,297,837
www.infiniresources.com.au
InfiniResources
13
Quarterly Activities Report For Period Ending 30 June 2025
Exploration and Development
Exploration and development costs for the Quarter have been accelerated at the Portland Creek Project
with the commencement of the inaugural drilling campaign.
Corporate Administration
Corporate and administrative costs for the quarter are inflated due to a timing difference in receiving the
March quarter HST return from the Canadian government. (Received in July 25)
Working Capital
Working capital costs include the acquisition consideration and early exploration program on the Boulding
and Reynolds projects as announced on 25 February 2025.
Capital Structure
The Capital Structure at the end of the Quarter is as follows:
Table 3: Capital Structure as at 30 June 2025
Securities
Number
Shares
73,554,269
Options
10,166,666
Performance Rights
1,311,189
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
14
Quarterly Activities Report For Period Ending 30 June 2025
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada
and Western Australia for uranium and lithium. The company has a diversified and highly prospective
portfolio of assets that includes greenfields and more advanced brownfields projects. The company’s
mission is to increase shareholder wealth through exploration growth and mine development.
JOR 2012 Mineral Resource Deposit
JORC 2012 Classification
Tonnes and Grade
Des Herbiers (U)
Inferred Combined Resource
162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 13: Infini’s global project portfolio.
Compliance Statement
This announcement contains information on the Portland Creek Project extracted from ASX market announcements dated 10
January 2024, 15 January 2024, 29 January 2024, 19 February 2024, 3 May 2024, 28 May 2024, 1 July 2024, 10 July 2024, 22
July 2024, 14 October 2024, 23 December 2024, 26 March 2025, 4 July 2025, 14 July 2025 and 28 July 2025 reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The original market announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The
Company is not aware of any new information or data that materially affects the information included in the original market
announcement.
This announcement contains information on the Company’s Reynolds Lake and Boulding Lake Projects extracted from market
announcement released to the ASX market announcements platform on 25 February 2025 and 24 July 2025 reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The original market announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The
Company is not aware of any new information or data that materially affects the information included in the original market
announcement.
This report contains information on the Company’s Projects extracted from the Company’s Prospectus dated 30 November 2023
and released to the ASX market announcements platform on 10 January 2024, and announcements dated 6 February 2024, 19
February 2024, 26 February 2024, 8 April 2024, 22 April 2024, 3 May 2024, 3 June 2024, 13 June 2024, 15 August 2024, 29 August
2024, 16 September 2024, 14 October 2024, 30 January 2025 and 25 February 2025 reported in accordance with the 2012 edition
of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original
market announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of
any new information or data that materially affects the information included in the original market announcement
This report contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s Prospectus
dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in
any original announcement and that all material assumptions and technical parameters underpinning the estimates in the original
market announcement continue to apply and have not materially changed. The original market announcements are available to
view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
15
Quarterly Activities Report For Period Ending 30 June 2025
Appendix 1 – Schedule of Interests in Mining Tenements (as at 30 June 2025)
Claim Number/Tenement
Project
Location
Status
Interest
Start of
Quarter
Interest
End of
Quarter
036683M, 036684M, 036685M 037492M, 037490M, 037496M, 037495M
Portland Creek
Uranium
Newfoundland,
Canada
Granted
100%
100%
101391, 101392, 101394, 101395, 110791, 116716, 116717, 120996,
120997, 137054, 160156, 160157, 166172, 178990, 178991, 225582,
225583, 232865, 257027, 257906, 269519, 269520, 269521, 281603,
281604, 298897, 298899, 328179, 328180, 328181, 328182, 340536,
340537, 340538, 340539, 340540, 100922, 100924, 116611, 117138,
117139, 120363, 120364, 126906, 128298, 128300, 128301, 128302,
143491, 144082, 157583, 157584, 162218, 163614, 178403, 178404,
203400, 203401, 209542, 211488, 213453, 221629, 221