Commencement of Maiden Field Program
at Reynolds Lake Uranium Project
Field program underway at Reynolds Lake, consisting of systematic soil sampling
of priority targets, rock chip sampling and geological mapping.
Multiple large-scale electrical conductors (largest >10 km long) coincident with
radiometric anomalies and anomalous lake sediments identified along key
structural corridors, indicating potential for shallow unconformity-style uranium
mineralisation on the outboard edge of the Athabasca Basin.
Approximately 1,600 soil and rock-chip samples planned to be collected
throughout the field program.
Program designed to advance the highest-priority targets to drill-ready status for
a potential Phase 1 drill program at Reynolds Lake in 2026.
Timing of the Reynolds Lake field program complementary to Infini’s upcoming
Phase 2 drilling campaign at the Portland Creek Uranium Project, with mobilisation
of geology and drill teams currently underway.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to advise that the field
program has commenced at its Reynolds Lake Uranium Project in the Athabasca Basin, Saskatchewan,
Canada.
Objectives of Reynolds Lake Field Program
The field program will run over several weeks and is focused on advancing multiple high-priority
exploration target areas. Work will include geological mapping and prospecting, with scintillometer and
magnetic susceptibility readings taken across the target sample sites.
A key component of the program is the collection of up to approximately 1,600 soil and rock-chip samples.
Analytical results from sample assays are expected to further refine the Company’s exploration model.
The scope of work being conducted during the field program includes:
•
Soil sampling on systematic grids across anomaly zones;
•
Rock chip sampling of outcropping uranium-bearing lithologies and glacial boulders;
•
Geological mapping to confirm shear zones and fault structures;
•
Using portable XRF devices (pXRF) in the field to guide the fieldwork programs; and
•
Submitting samples for laboratory analysis using industry-standard methods for uranium and
pathfinder elements.
The field program is expected to be completed in September 2025, with assay results anticipated in Q4
CY2025. The Company looks forward to updating shareholders on progress and results as they become
available.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
1
Commencement of Maiden Field Program at Reynolds Lake Uranium
Project
Infini’s Chief Executive Officer, Rohan Bone, said: " The commencement of the Reynolds Lake field
program marks an important step for Infini. Our geophysical interpretation has highlighted large-scale EM
conductors that could represent uranium mineralisation potentially as shallow as 20 metres below surface
— a highly significant development in an underexplored area on the outer edge of the Athabasca Basin.
This program will generate the detailed geological and geochemical data we need to refine these targets
into drill-ready prospects, and we see a clear opportunity here to make a discovery that could rapidly
transform the scale of Reynolds Lake.”
Figure 1: Fly camp set up at Reynolds Lake upon commencement of the field program.
Recap of the Reynolds Lake Study Results
The integrated review of available datasets has highlighted 14 target areas across the Reynolds Lake
project, illustrated in Figure 2 below. Key findings include:
•
Lake sediment geochemistry: historic data reveal numerous anomalous uranium values, many
of which coincide with favourable structural corridors.
•
Radiometrics: regional airborne surveys highlight distinct uranium-channel responses associated
with interpreted fault structures.
•
TDEM geophysics: multiple large scale EM conductors have been mapped, several of which
overlap with geochemical and radiometric anomalies, suggesting potential zones of structurally
controlled mineralisation.
•
Structural interpretation: has identified broad shear zones and cross-cutting N–S trending faults
throughout the project area. These structures are interpreted as potential conduits for
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
2
Commencement of Maiden Field Program at Reynolds Lake Uranium
Project
mineralising fluids and represent high-priority zones for on-ground exploration.
Together, these datasets provide a compelling, multi-layered exploration model for Reynolds Lake.
Figure 2: Reynolds Lake magnetic image overlaid with interpreted structures, lake sediment geochemistry,
radiometric anomalism and EM targets. Note coincidence of EM targets with interpreted shears, N-S faults
and radiometric anomalism.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
3
Commencement of Maiden Field Program at Reynolds Lake Uranium
Project
About Reynolds Lake Uranium Project
The Reynolds Lake Uranium Project, as shown in Figure 3, comprises 12 claims covering 386 km²,
located on the eastern outboard edge of the Athabasca Basin in northern Saskatchewan — a benchmark
region globally renowned for high-grade uranium. The property lies approximately 40 km east of the
community of Wollaston Lake. It is flanked by the Keeping Lake Project to the north and the Jewison Lake
Project to the south.
Figure 3: Location of the Reynolds Lake Uranium Project relative to the world-renowned Athabasca Basin,
synonymous with high-grade uranium deposits, and in close proximity to existing operations, access and
infrastructure.
Exploration outside the basin margin is driven by evidence that the geological conditions necessary for
unconformity-type deposit formation — namely, reactivated basement structures, graphitic
metasedimentary rocks, and the presence of oxidised hydrothermal fluids — extend beyond the current
limits of Athabasca sandstone cover.
The Reynolds Lake Project is underlain by Archean felsic gneisses, which are overlain by a sequence of
Lower Proterozoic metamorphic rocks of the Wollaston Domain. This sequence includes quartzite, mafic
gneiss, meta-arkose, and calc-silicate units. The structural fabric of the area is dominated by northeasttrending isoclinal folding. A major structural feature, the Needle Falls Shear Zone, transects the project
area with a northeast-southwest orientation. Graphitic schists and gneisses — critical host rocks for
unconformity-type uranium mineralisation — have been identified at several locations across the property.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
4
Commencement of Maiden Field Program at Reynolds Lake Uranium
Project
References
1.
ASX Release, Infini Resources, Further Priority Targets Identified at Reynolds Lake Uranium Project,
20 August 2025.
2.
ASX Release, Infini Resources, Major Bedrock Conductors Identified at Reynolds Lake Uranium
Project, 24 July 2025.
3.
ASX Release, Infini Resources, Infini to Acquire Major Footprint in Athabasca Basin, 25 February
2025.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
5
Commencement of Maiden Field Program at Reynolds Lake Uranium
Project
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and more
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JOR 2012 Mineral Resource Deposit
JORC 2012 Classification
Tonnes and Grade
Des Herbiers (U)
Inferred Combined Resource
162 Mt @ 123ppm U3O8 (43.95mlb)
Compliance Statement
This announcement contains information on the Reynolds Lake Uranium Project extracted from ASX market announcements dated
25 February 2025, 31 March 2025, 24 July 2025 and 20 August 2025 reported in accordance with the 2012 edition of the “Australian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new
information or data that materially affects the information included in the original market announcement.
This announcement contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s
Prospectus dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in
accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the
information included in any original announcement and that all material assumptions and technical parameters underpinning the
estimates in the original market announcement continue to apply and have not materially changed. The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
6
Share your feedback
Discover