Saskatchewan Drill Contracts Awarded
Released
Released
Announcement PDF
ASX Announcement
Released 19 March 2026
ASX:I88
Key Contractors Appointed for Maiden
Drilling at Reynolds and Reitenbach Lake
Uranium Projects
Rodren Drilling Ltd appointed as diamond drilling contractor, bringing over 4 7 years
of experience supporting mineral exploration and uranium drilling programs across
Canada, including in the Athabasca Basin.
Archer Cathro & Associates Ltd appointed to provide in -field geological services
throughout the upcoming drilling program, bringing over 60 years of exploration
experience across northern Canada.
Minimum 2,500m drill program developed to effectively test
unconformity/basement -hosted uranium targets defined by the 2025 airborne
geophysics and field programs , with ability to scale up the program based on drilling
results.
Drilling will target zones where ~80 km of EM conductors coincide with structural
corridors (defined using airborne magnetics) and uranium geochemical anomalism
across Reynolds and Reitenbach Lake.
High-grade uranium confirmed at the Titus Showing, where a uraninite -bearing rock
sample returned 1.90% U₃O₈ along a prospective EM conductor hosted in a n
interpreted metapelitic unit adjacent to a broad structural flexure, will be drilled this
spring.
Mobilisation of contractors to Reynolds and Reitenbach Lake is expected mid-April
2026 with drilling scheduled to commence shortly thereafter .
Concurrently, Portland Creek airborne geophysics survey expected to re-commence
in April to support target refinement ahead of expanded 2026 exploration and drilling
program .
To lea rn more a bout this a nnouncement a nd watch a video upda te from our CEO, Roha n Bone, click here.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is plea sed to announce the a ppointment
of Archer Ca thro & Associa tes Ltd (“Archer Ca thro”) a nd Rodren Drilling Ltd (“Rodren Drilling”) a s key
contra ctors for the Compa ny’s planned ma iden drilling ca mpa ign a t Infini’s 1
00%owned Reynolds Lake
a nd Reitenba ch La ke Ura nium Projects, loca ted on the ea stern ma rgin of the world-renowned
Atha ba sca Ba sin ura nium ca mp.
Infini’s Chief Executive Officer, Rohan Bone, said: "We are very pleased to appoint Archer Cathro and
Rodren Drilling to support our maiden drill campaign at Reynolds Lake and Reitenbach Lake, both of
whom bring extensive experience supporting uranium exploration programs across northern Canada.
The scale of the EM conductors, strong uranium geochemical anomalism and the high -grade Titus
Showing together highlight the prospectivity of the system and provide compelling targets for drilling.
Key Contractors Appointed for Maiden Drilling at Reynolds and
Reitenbach Lake Uranium Projects
ASX:I88
With preparations now well advanced, we look forward to commencing our maiden drill program on the
margins of the Athabasca Basin in Q22026.”
Appointment of drilling and geological contractors in preparation for maiden drilling campaign
Rodren Drilling is a highly regarded Canadian drilling contractor with more than four decades of
operational experience delivering diamond drilling services across complex , often remote geological
environments throughout Canada. The company has a strong track record supporting uranium
exploration programs, including work across the Athabasca Basin, and is recognised for its focus on
operational efficiency, safety and environmental stewar dship.
Rodren Drilling will be responsible for executing the diamond drilling component of Infini ’s maiden drill
program at Reynolds Lake and Reitenbach Lake, designed to test priority targets associated with
conductive horizons, structural corridors and geochemical anomalism identified across the projects.
Archer Cathro will provide geological services throughout the program, including drill supervision,
geological logging, sampling and field program coordination. Archer Cathro is one of Canada ’s most
established geological consultancies and has been actively involved in mineral exploration across
northern Canada for over 60 years, supporting numerous discoveries across a range of commodities
including uranium, gold and critical minerals.
Their technical expertise and deep experience operating in northern exploration environments will
support efficient execution of the drilling campaign and real -time geological interpretation as drilling
progresses.
Infini’s Exploration Manager, Nick Mitchell, said: “We are excited to begin the maiden drilling campaign
at the Reynolds and Reitenbach Lake Project
s. The targets have been defined through careful review of
the surface work and analysis of the geophysical surveys completed in 2025, giving us a strong technical
foundation for this drill program.
With a highly experienced team in place, we are now ready to test a series of well -defined targets
generated through a multi -disciplinary exploration approach. Both Archer Cathro and Rodr en Drilling
bring deep roots in Canadian exploration, and that experience allows us to stay focused on the science
of discovery while deploying exploration capital efficiently and where it matters most, in the ground
testing high quality targets.”
Mobilisation of both contractors to site is scheduled to commence mid -April 2026, with drilling activities
expected to begin shortly thereafter.
The program has been designed with agility and flexibility in mind, allowing drilling intensity and scope
to be scaled quickly in response to results. An initial 2,500m campaign will focus on high
-priority targets,
with early success guidingadditional follow-up drillholes.
Drilling will focus on testing kilometre scale graphitic conductive horizons , and associated structural
intersections interpreted from airborne geophysics Excite EM and MAG datasets across the Reynolds
Lake and Reitenbach Lake projects . These identified features represent favourable settings for
basement-hosted uranium mineralisation. Priority targets are defined by the spatial association of EM
conductors, structural corridors and uranium geochemical anomalism, including areas surrounding the
high-grade Titus Showing where a uraninite-bearing sample returned 1.90% U₃O₈. Final drillhole locations
and orientations will be refined following permitting approval and confirmation of suitable drill platforms.
Further updates will be provided as the Company progresses toward drill commencement and begins
on ground operations.
Key Contractors Appointed for Maiden Drilling at Reynolds and
Reitenbach Lake Uranium Projects
ASX:I88
Figure 1
: Overview of the Reynolds and Reitenbach Lake Uranium Projects highlighting the confluence of
interpreted airborne EM conductors and major structural architecture with soil and rock-chip uranium assay
results from the Phase 1 and Phase 2 field programs, including the 1.90% U₃O₈ uraninite -bearing rock sample at
the Titus Prospect.
[END]
This announcement has been approved for release by the Board of Directors of Infini Resources Ltd.
To receive alerts for ASX announcements and updates, or to engage with Infini
Resources directly by asking questions, watching video summaries and seeing what
other shareholders have to say about this, as well as past announcements, please
visit https://infiniresources.com.au or conta ct us directly a t:
E:info@infiniresources.com.a u
T: +61(08) 9465 1
051
Key Contractors Appointed for Maiden Drilling at Reynolds and
Reitenbach Lake Uranium Projects
ASX:I88
About Reynolds Lake & Reitenbach Lake
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 22 mineral claims
covering a total footprint of 766 km² on the eastern outboard margin of the Athabasca Basin in northern
Saskatchewan. The projects are contiguous, with Reynolds Lake consisting of 12 claims (386 km²) and
Reitenbach Lake consisting of10claims (381km²) adjoining its northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are
bisected by the crustal -scale Needle Falls Shear Zone, a major structural corridor separating the
Wollaston Domain to the west from the Peter Lake Domain to t he east. The Wollaston Domain is
dominated by Paleoproterozoic siliciclastic metasediments including paragneiss, quartzite, and calc -
silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic granitoid gneisses and
supracrustal rocks.Both domains are strongly deformed and metamorphosed, with northeast -trending
isoclinal folding and later cross
-cutting north–south fault systems that provide structural complexity and
potential pathways for hydrothermal fluid flow.
Graphitic schists and gneisses, key lithologies known to host unconformity -associated uranium
mineralisation, have been identified within the project area and are spatially associated with
electromagnetic conductors, radiometric anomalies and elevated uran ium-in-lake sediment samples.
Recent exploration has confirmed primary uranium mineralisation at surface at Reitenbach Lake, while
petrographic analysis has validated a structurally prepared and hydrothermally altered basement
environment consistent with an unconformity-related uranium system.
Regionally, the geological setting is considered analogous to uranium systems at Eagle Point and Rabbit
Lake, where mineralisation occurs along graphitic shear zones at the boundary between Wollaston
metasediments and granitoid basement.
Figure 2: Location of the Reynolds Lake and Reitenbach Lake Uranium Projects relative to the world -renowned
Athabasca Basin, synonymous with high -grade uranium deposits, and in close proximity to existing operations,
access and infrastructure.
Key Contractors Appointed for Maiden Drilling at Reynolds and
Reitenbach Lake Uranium Projects
ASX:I88
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia fo r
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and mo re
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U
3O8 (43.95mlb)
Figure 3: Overview of Infini's portfolio of projects and global footprint.
Compliance Statement
This announcement contains information on the Reynolds Lake Uranium Project and the Reitenbach Lake Uranium Project
extracted from ASX market announcements dated 25 February 2025, 31 March 2025 , 24 July 2025, 20 August 2025, 9 September
2025, 22 September 2025, 2 October 2025 , 3 October 2025, 26 November 2025, 23 December 2025, 12 January 2026
, 19 January
2026 and 28 January 2026 and reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on
www.infiniresources.com.au and www.asx.co m.au. The Company is not aware of any new information or data that materially
affects the information included in the original market announcement.
This announcement contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s
Prospectus dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in
accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”
(JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the informatio n
included in any original announcement and that all material assumptions and technical parameters underpinning the estimates in
the original market announcement continue to apply and have not materially changed. The original market announcements are
a va ila ble to view on https://nfiniresources.com.a u a nd www.a sx.com.a u.
Forward Looking Statements
This a nnouncement ma y conta in certa in forwa rd-looking sta tements a nd projections.Such forwa rd looking sta tements/projections
a re estima tes for discussion purposes only a nd should not be relied upon. Forwa rd looking sta tements/projections a re inherently
uncerta in a nd ma y therefore differ ma teria lly from results ultima tely a chieved. Infini Resources Limited does not ma ke a ny
representa tions a nd provides no wa rra nties concerning the a ccura cy of the projections a nd discla ims a ny obliga tion to upda te or
revise a ny forwa rd-looking sta tements/projects ba sed on new informa tion, future events or otherwise except to the extent
required by a pplica ble la ws. While the informa tion conta ined in this report ha s been prepa red in good fa ith, neither InfiniResources
Limited or a ny of its directors, officers, a gents, employees or a dvisors give a ny representa tion or wa rra nty, express or implied, a s
to the fa irness,a ccura cy, completeness or correctness of the informa tion,opinions a nd conclusions conta ined in this a nnouncement.
Share your feedback
Discover