Project-Wide Airborne Geophysics Completed at Portland Creek
Released
Released
Announcement PDF
ASX Announcement
Released 26 May 2026
ASX:I88
Project-Wide Airborne Geophysics Completed
at Portland Creek Uranium Project
► Airborne electromagnetic (EM) and magnetic survey completed for 2,230 line km over 252 km² of Infini's
Portland Creek tenement package, the first modern helicopter-supported geophysical survey over the
tenements.
► High-resolution magnetic data expected to significantly advance the geological model, enabling
identification of new structural targets and hydrothermal alteration corridors across Infini's expanded
tenement package.
► Integrated interpretation of the complete 5,310 m Phase 2 drill data, including structural measurements,
geochemical and alteration data, provides a significantly improved geological framework, confirming
uranium enrichment across more than 6 km of strike at Portland Creek.
► Follow-on airborne radiometric survey planned this quarter to complete the project-wide geophysical
dataset, followed by field-based prospecting and structural mapping commencing in Q2.
► Expanded Phase 3 diamond drilling program planned for Q3 CY2026, designed to test the highest-
priority structural corridors identified from the integrated geological, geochemical and geophysical
dataset.
To learn more about this announcement and watch a video update from our CEO, Rohan Bone, click here.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to announce the completion of a project-wide
airborne electromagnetic (EM) and magnetic geophysical survey over the Portland Creek Uranium Project in Newfoundland,
Canada, together with receipt of the final laboratory assay results from its completed Phase 2 drilling program.
Infini’s Chief Executive Officer, Rohan Bone, said: "The completion of the airborne geophysics survey over Infini's
broader Portland Creek tenement package is an important milestone for the Company and a significant step forward in our
ability to identify new targets across what we believe is a substantially underexplored structural system. The high-resolution
magnetic dataset is expected to provide a step-change in our understanding of the granite host, identifying granitic contact
zones, crosscutting fault structures and demagnetised anomalies associated with hydrothermal uranium mineralisation
across the full extent of our tenement package.
Portland Creek remains significantly underexplored, with only a small portion of the broader structural corridor having been
drill-tested to date. The integration of the complete drilling dataset with airborne geophysics and upcoming fieldwork
positions Infini strongly for a focused, high-impact Phase 3 drilling program later in 2026."
Completion of airborne geophysics survey and preliminary interpretation of results
The Company has recently completed 2,230 line km of EM and magnetic survey at a combination of 100m and 200m line
spacings over the Portland Creek Uranium Project (Figure 2). This is the first time an airborne EM and detailed magnetic
survey has been completed over Portland Creek using modern survey equipment. Recent developments in exploration
technology have enabled greater spatial resolution and ground penetrating power, improving our ability to resolve discrete
EM conductors beneath conductive till and clay overburden.
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Interpretation of the newly acquired airborne EM data is in progress and is providing important insights into the subsurface
geology and structural architecture of the Portland Creek project. The sub-glacial bedrock of the project area is generally
quite resistive and is consistent with the presence of a large granitic intrusion. No discrete conductors have been identified.
High-resolution magnetic data, acquired simultaneously with the EM survey, is expected to be the primary geophysical tool
for advancing structural interpretation and drill targeting at Portland Creek. Processed magnetic products, including suites
of filtered magnetic anomaly images and 3D susceptibility inversion models, will be used to map varying fault sets,
intersections of these faults, and locations of demagnetised anomaly zones. Hydrothermal alteration associated with
uranium mineralisation in granite-hosted systems, particularly hematite-chlorite overprinting of magnetite-bearing granite,
typically produces characteristic magnetic-low anomaly zones that can be resolved and interpreted from magnetic survey
data. The ability to resolve subtle magnetic contrasts at the line spacing and altitude achieved by the Xcite™ helicopter EM
and magnetic survey system represents a material improvement over the legacy airborne geophysical surveys previously
flown over the project area.
Integration of the magnetic interpretation with the structural model derived from Phase 2 drilling and existing geochemical
and mapping datasets will directly inform the design of the Phase 3 drilling programme targeted for Q3 CY2026.
Figure 1: First modern helicopter-supported geophysical survey flown over 252 km² of Infini’s tenements at Portland Creek, returning high
resolution electromagnetic (EM) and magnetic data to advance structural interpretation and targeting for the upcoming Phase 3 drill program.
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Figure 2: Flight path of the helicopter EM and magnetic survey conducted over Infini’s Portland Creek Uranium Project in Newfoundland,
Canada.
Receipt of remaining Phase 2 assays (holes PCDD25-011, 019, 020, 021, 022 and 023)
Infini has received laboratory assay results for the final six drillholes from the Phase 2 program, completing the full analytical
dataset across all 17 holes drilled in 2025. The Phase 2 assay dataset is current as at the date of this announcement and
no further results are outstanding or pending.
Key results from the remaining holes are as follows. PCDD25-011 at Target 2 returned three intervals above 100 ppm U₃O₈,
including a best result of 115 ppm U₃O₈ over 1.0 m at 82-83 m, with broadly anomalous uranium values persisting from
near surface to approximately 155 m depth. PCDD25-019 at Target 5 returned 107 ppm U₃O₈ over 0.62 m at 137-137.62
m, with near-continuous uranium anomalism across more than 310 m of downhole length, the most extensive intersection
of the Phase 2 program. PCDD25-022 at Target 7 returned four intervals above 100 ppm U₃O₈, including a best result of
192 ppm U₃O₈ over 0.5 m at 53-53.5 m, with further elevated intervals confirmed at approximately 311 m depth,
demonstrating significant vertical extent of the Target 7 mineralising system. PCDD25-023 at Target 7 returned 180 ppm
U₃O₈ over 0.45 m at 8.4-8.85 m with additional anomalous zones at multiple depths. PCDD25-020 and PCDD25-021 did
not return uranium mineralisation above the 100 ppm U₃O₈ reporting threshold.
Combined with the first-batch results, elevated uranium mineralisation has now been confirmed across multiple drillholes
spanning the full 6 km strike length of the project, with discrete mineralised zones consistently hosted within structurally
controlled fracture networks. Full drill results are provided in Appendix 1.
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Updated geological model interpretation
Integration of the complete Phase 2 dataset, 5,310 m across 17 drillholes, supported by 2,814 structural measurements,
multi-element laboratory assays and alteration characterisation, provides a significantly improved geological framework for
uranium exploration at Portland Creek.
Portland Creek is interpreted as a structurally controlled, multi-stage hydrothermal uranium system developed within
granite. Observations of core and outcrop consistently show uranium mineralisation associated with pervasive hematite–
chlorite alteration overprinting earlier albitic alteration, a relationship characteristic of shear-zone hosted uranium systems
globally. Uranium enrichment is preferentially developed at intersections of the two principal fracture families (NW–SE and
E-W to WNW-ESE), with holes dominated by a single structural trend returning significantly weaker mineralisation. Zones
where multiple fracture orientations interact are interpreted to create localised dilation and fluid focusing, controlling uranium
deposition. This structural framework will directly guide Phase 3 target prioritisation and drill design.
Implications for Phase 3 targeting
The updated geological model, incorporating the complete Phase 2 assay dataset and final airborne geophysics
interpretation will directly inform Phase 3 drilling targets.
The dominant NW-SE structural corridor is interpreted as the principal interpreted fluid pathway across the project, with
step-out drilling along strike and down-dip from PCDD25-012 representing the highest-priority exploration activity for Phase
3 drilling. Testing of zones where variably oriented structures intersect this corridor is also prioritised, as these represent
the structural settings most likely to generate the fracture intersection density and localised permeability required for
uranium concentration.
Geophysical filtered magnetic imagery, contours and inversion model results will be used to identify and map structures
and demagnetised anomalies across the full project tenement package, including areas not yet covered by drilling. This will
enable systematic identification of additional structural intersections and alteration zones prospective for uranium
mineralisation, extending the targeting framework beyond the areas tested in Phases 1 and 2 drilling.
High-priority drill targets for Phase 3 will be defined by the coincidence of:
• Intersecting fracture sets of differing orientation;
• Strong U-Mo-As geochemical signatures and elevated U/Th ratios;
• Well-developed hematite-chlorite-albite alteration; and,
• Demagnetised anomalies identified from the airborne magnetic survey data, consistent with structurally controlled
hydrothermal alteration.
Areas characterised by a single dominant structural trend, deformation without crosscutting structures, base-metal alteration
decoupled from uranium, or the absence of magnetic low signatures are assigned lower priority.
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Figure 3: Phase 2 drillhole locations with logged visible uranium across multiple drillholes and multiple priority targets,
demonstrating the emerging potential district-scale uranium system at Portland Creek.
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Next steps
With the airborne EM and magnetic survey now complete, Infini is advancing toward an expanded drilling campaign at the
Portland Creek Uranium Project. Key upcoming activities include:
• Finalise processing of the EM and magnetic survey data and refined interpretation of key structural controls,
potential alteration zones and areas prospective for uranium mineralisation.
• Integration of these results with drilling data, structural observations and geochemical datasets to define high-
priority targets and finalise the scope and focus areas for the planned field program.
• Mobilisation of geological teams to site to undertake detailed structural mapping, rock chip sampling and
prospecting across priority target areas. Field activities will focus on identifying outcropping fault structures,
characterising hydrothermal alteration and refining drill collar locations to maximise the effectiveness of the Phase
3 drilling program.
• Obtaining regulatory approvals to support the commencement of the Phase 3 ~5,000m diamond drilling program
across Infini's expanded tenement package at Portland Creek.
The drilling program is scheduled to commence in Q3 CY2026 and represents a significant expansion of drill testing across
a structurally controlled, district-scale uranium system hosted within the Precambrian Long-Range Complex of
Newfoundland's Humber Tectonic-Stratigraphic Zone, a geological setting considered highly prospective for structurally
hosted, hydrothermal uranium mineralisation.
[END]
This announcement has been approved for release by the Board of Directors of Infini Resources Ltd.
To receive alerts for ASX announcements and updates, or to engage with Infini Resources
directly by asking questions, watching video summaries and seeing what other shareholders
have to say about this, as well as past announcements, please visit
https://infiniresources.com.au or contact us directly at:
Infini Resources Limited
ABN 77 656 098 583
E: info@infiniresources.com.au
T: +61 (08) 9465 1051
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
About Portland Creek
The Portland Creek Uranium Project spans 328 km² and lies within the Precambrian Long-Range Complex of the Humber
Tectonic-Stratigraphic Zone. The geology consists of metaquartzite and a suite of paragneisses, intruded by leucocratic
granite, which are believed to have been thrust westward over Paleozoic carbonate-dominant sediments.
The project area covers a large regional uranium anomaly, first identified in the 1970’s through a Newfoundland
government lake sediment sampling program. Originally, one uranium showing was recorded in the Newfoundland Mineral
Deposit Index, reporting 2,180 ppm U₃O₈. A compilation of historic and recent exploration data have since delineated a 6
km zone of anomalous uranium and radon gas in lake sediments, soils and in an airborne radiometric survey. This anomaly
closely follows a prominent fault scarp, marking the edge of a granitic plateau interpreted as a deep-seated fault.
Since listing, the Company has verified historical uranium anomalies and completed a soil sampling grid over the Falls Lake
Prospect (formerly the Talus Prospect). This work defined a ~800 m x 100 m high-grade uranium anomaly, with a peak
result of 74,997 ppm U₃O₈. This anomaly is located down-ice and west of a 1.5 km radiometric anomaly. Additionally, Infini
has identified a southern 500 m-wide cluster of high-grade soil samples, which includes a peak of 1,500 ppm U₃O₈ and lies
1.5 km from the recently completed Phase 2 drill program.
Figure 4: Overview of prospective exploration areas at Portland Creek, demonstrating the occurrence of soil sampling assays
up to 74,997 ppm U₃O₈, anomalous radiometric data and Infini’s package of tenements.
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for uranium and lithium.
The company has a diversified and highly prospective portfolio of assets that includes greenfield and more advanced brownfield projects. The company’s
mission is to increase shareholder wealth through exploration growth and mine development.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 5: Overview of Infini's portfolio of projects and global footprint.
Competent Person Statement
The information in this report that relates to exploration results for the Portland Creek Project is based on, and fairly represents, information and supporting
documentation compiled and evaluated by Drew Heasman, Consulting Geologist for the Company who is a Professional Geoscientist (P.Geo.,
registration no. 10901) of the Professional Engineers and Geoscientists of Newfoundland and Labrador (PEGNL), and is a member in good standing.
Mr. Heasman has sufficient experience relevant to the style of mineralisation, type of deposit under consideration, and the activity being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources,
and Ore Reserves (JORC Code). Mr. Heasman consents to the inclusion of the information in the form and context in which it appears. The
information in the market announcement is an accurate representation of the available data and studies for the Portland Creek Project.
Compliance Statements
This announcement contains information on the Portland Creek Project extracted from ASX market announcements dated 10 January 2024, 15 January
2024, 29 January 2024, 19 February 2024, 28 May 2024, 1 July 2024, 10 July 2024, 22 July 2024, 14 October 2024, 23 December 2024, 26 March 2025,
4 July 2025, 14 July 2025, 28 July 2025, 30 July 2025, 3 September 2025, 11 September 2025, 9 October 2025, 13 October 2025, 21 November 2025,
12 December 2025 and 9 February 2026 reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on www.infiniresources.com.au and
www.asx.com.au. The Company is not aware of any new information or data that materially affects the information included in the original market
announcement.
This announcement contains information regarding the Des Herbiers Mineral Resource Estimate (162 Mt @ 123 ppm U₃O₈, Inferred), extracted from the
Independent Geologist's Report in the Company's Prospectus dated 30 November 2023 and released to the ASX market announcements platform on 10
January 2024, reported in accordance with the 2012 Edition of the JORC Code. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the original disclosure and that all material assumptions and technical parameters underpinning the
estimate continue to apply and have not materially changed. The original market announcements are available to view on www.infiniresources.com.au
and www.asx.com.au
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Statements regarding I88’s plans with respect to its mineral properties
and programs are forward-looking statement. Such forward-looking statements/projections are estimates for discussion purposes only and should not be
relied upon. Forward-looking statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved. There
can be no assurance that I88’s plans for development of its mineral properties will proceed as currently expected. There can also be no assurance that
I88 will be able to confirm the presence of additional mineral resources, that any mineralisation will prove to be economic or that a mine will successfully
be developed on any of I88’s mineral properties. Infini Resources Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projections based on new information, future
events or otherwise, except to the extent required by applicable laws. While the information contained in this report has been prepared in good faith,
neither Infini Resources Limited or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as
to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Appendix 1: Intersections of anomalous uranium observed in the assays from Phase 2 drilling at
Portland Creek
Of the 17 Phase 2 drillholes (PCDD25-007 to PCDD25-023, with restarted holes 009A and 011A replacing 009 and 011), nine returned at least one sample above the
100 ppm U₃O₈ reporting threshold and are listed below. The remaining eight holes (PCDD25-007, 009A, 013, 015, 017, 018, 020 and 021) did not exceed this threshold;
their geological and structural results are described in the body of this announcement.
Table 1: Material drill hole samples (mineralised intervals >100 ppm U3O8) taken from the Phase 2 drilling program at Portland Creek demonstrating localised
uranium intercepts. Intervals are down hole length. True width not known.
Hole number UTM East UTM North
UTM
Elevation
Azimuth (o
) Dip (o
) From (m) To (m) Interval (m) Sample ID U3O8 (ppm)
PCDD25-008 470730 5559405 128 320 -45 143.00 143.30 0.30 L458639 229
PCDD25-010 470291 5557916 123 170 -45 79.28 80.00 0.59 L458896 103
PCDD25-010 470291 5557916 123 170 -45 114.22 114.56 0.36 L458919 110
PCDD25-010 470291 5557916 123 170 -45 159.69 160.12 0.52 L458956 108
PCDD25-010 470291 5557916 123 170 -45 160.62 161.50 0.72 L458958 176
PCDD25-010 470291 5557916 123 170 -45 161.50 162.50 0.34 L458959 142
PCDD25-010 470291 5557916 123 170 -45 261.40 262.40 0.43 H091463 110
PCDD25-011A 470291 5557915 123 170 -65 82.00 83.00 1.00 H100012 115
PCDD25-011A 470291 5557915 123 170 -65 98.00 99.00 1.00 H100029 104
PCDD25-011A 470291 5557915 123 170 -65 99.00 100.00 1.00 H100031 109
PCDD25-012 470461 5557972 123 170 -45 35.51 36.10 0.88 H091026 108
PCDD25-012 470461 5557972 123 170 -45 54.12 54.48 1.00 H091042 116
PCDD25-012 470461 5557972 123 170 -45 54.48 55.00 1.00 H091043 104
PCDD25-012 470461 5557972 123 170 -45 143.13 143.62 1.00 H091156 112
PCDD25-012 470461 5557972 123 170 -45 144.50 145.00 0.49 H091159 116
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Hole number UTM East UTM North
UTM
Elevation
Azimuth (o
) Dip (o
) From (m) To (m) Interval (m) Sample ID U3O8 (ppm)
PCDD25-012 470461 5557972 123 170 -45 145.00 145.50 0.50 H091161 114
PCDD25-012 470461 5557972 123 170 -45 171.75 172.23 0.50 H091196 120
PCDD25-012 470461 5557972 123 170 -45 214.91 215.91 0.48 H091258 106
PCDD25-012 470461 5557972 123 170 -45 228.18 228.62 0.44 H091275 124
PCDD25-012 470461 5557972 123 170 -45 254.27 254.85 0.58 H091311 347
PCDD25-012 470461 5557972 123 170 -45 254.85 255.15 0.30 H091312 171
PCDD25-012 470461 5557972 123 170 -45 255.15 255.80 0.65 H091313 113
PCDD25-012 470461 5557972 123 170 -45 255.80 256.15 0.35 H091314 342
PCDD25-012 470461 5557972 123 170 -45 257.15 257.52 0.37 H091316 209
PCDD25-012 470461 5557972 123 170 -45 257.52 258.02 0.50 H091317 218
PCDD25-012 470461 5557972 123 170 -45 258.02 258.52 0.50 H091318 129
PCDD25-012 470461 5557972 123 170 -45 258.52 259.52 1.00 H091319 104
PCDD25-012 470461 5557972 123 170 -45 262.30 262.80 0.50 H091324 267
PCDD25-012 470461 5557972 123 170 -45 267.80 268.00 0.20 H091331 150
PCDD25-012 470461 5557972 123 170 -45 269.60 269.90 0.30 H091334 252
PCDD25-012 470461 5557972 123 170 -45 270.30 271.30 1.00 H091336 105
PCDD25-012 470461 5557972 123 170 -45 277.70 278.38 0.68 H091346 324
PCDD25-012 470461 5557972 123 170 -45 281.38 282.40 1.02 H091351 153
PCDD25-012 470461 5557972 123 170 -45 291.00 291.40 0.40 H091367 152
PCDD25-012 470461 5557972 123 170 -45 296.47 297.47 1.00 H091375 134
PCDD25-012 470461 5557972 123 170 -45 297.47 298.47 1.00 H091376 142
PCDD25-012 470461 5557972 123 170 -45 298.47 299.38 0.91 H091377 120
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Hole number UTM East UTM North
UTM
Elevation
Azimuth (o
) Dip (o
) From (m) To (m) Interval (m) Sample ID U3O8 (ppm)
PCDD25-012 470461 5557972 123 170 -45 299.38 300.38 1.00 H091378 107
PCDD25-012 470461 5557972 123 170 -45 305.40 305.94 0.54 H091385 165
PCDD25-014 470462 5558025 131 170 -45 27.70 28.05 0.35 H091491 124
PCDD25-016 470515 5558036 133 170 -45 50.64 51.22 0.58 H091644 143
PCDD25-016 470515 5558036 133 170 -45 57.54 58.00 0.46 H091649 106
PCDD25-016 470515 5558036 133 170 -45 80.63 81.19 0.56 H091662 245
PCDD25-016 470515 5558036 133 170 -45 113.00 114.00 1.00 H091689 297
PCDD25-016 470515 5558036 133 170 -45 124.88 125.88 1.00 H091706 106
PCDD25-019 470813 5558967 127 106 -60 137.00 137.62 0.62 H097466 107
PCDD25-022 470887 5557032 118 180 -45 53.00 53.50 0.50 H097744 192
PCDD25-022 470887 5557032 118 180 -45 119.68 120.20 0.52 H097765 134
PCDD25-022 470887 5557032 118 180 -45 310.50 311.52 1.02 H097816 134
PCDD25-022 470887 5557032 118 180 -45 312.68 313.20 0.52 H097819 114
PCDD25-023 470898 5557131 123 350 -50 8.40 8.85 0.45 H097823 180
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Appendix 2: Intersections of anomalous elements associated with hydrothermal fluids observed in
the assays from Phase 2 drilling at Portland Creek
Table 2: Material drill hole samples (mineralised intervals >100 ppm Cu, or >100 ppm Mo, or >100 ppm Zn) taken from the Phase 2 drilling program at Portland
Creek demonstrating localised intercepts of elements associated with hydrothermal fluids. Intervals are down hole length. True width not known.
Hole number UTM East UTM North
UTM
Elevation
Azimuth (o
) Dip (o
) From (m) To (m)
Interval
(m)
Sample ID Cu (ppm) Mo (ppm) Zn (ppm)
PCDD25-008 470730 5559405 128 320 -45 27.17 27.48 0.31 L458585 1 2 262
PCDD25-008 470730 5559405 128 320 -45 35.68 36.15 0.47 L458591 0 1 173
PCDD25-008 470730 5559405 128 320 -45 44.00 45.00 1.00 L458597 29 1 101
PCDD25-008 470730 5559405 128 320 -45 45.00 46.08 1.08 L458598 28 1 101
PCDD25-008 470730 5559405 128 320 -45 69.00 70.00 1.00 L458612 2 1 334
PCDD25-009A 470740 5559787 132 184 -45 151.00 151.59 0.59 L458769 47 48 135
PCDD25-009A 470740 5559787 132 184 -45 151.59 152.00 0.41 L458771 273 220 676
PCDD25-009A 470740 5559787 132 184 -45 152.00 152.33 0.33 L458772 318 256 220
PCDD25-009A 470740 5559787 132 184 -45 152.33 152.66 0.33 L458773 479 186 273
PCDD25-009A 470740 5559787 132 184 -45 152.66 153.00 0.34 L458774 387 104 99
PCDD25-009A 470740 5559787 132 184 -45 153.00 153.33 0.33 L458775 290 54 452
PCDD25-009A 470740 5559787 132 184 -45 153.33 153.66 0.33 L458776 275 121 179
PCDD25-009A 470740 5559787 132 184 -45 153.66 154.00 0.34 L458777 413 280 207
PCDD25-009A 470740 5559787 132 184 -45 154.00 154.33 0.33 L458778 338 139 64
PCDD25-009A 470740 5559787 132 184 -45 154.33 154.66 0.33 L458779 450 321 67
PCDD25-009A 470740 5559787 132 184 -45 154.66 155.00 0.34 L458781 175 110 68
PCDD25-009A 470740 5559787 132 184 -45 155.00 155.73 0.73 L458782 125 150 50
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Hole number UTM East UTM North
UTM
Elevation
Azimuth (o
) Dip (o
) From (m) To (m)
Interval
(m)
Sample ID Cu (ppm) Mo (ppm) Zn (ppm)
PCDD25-009A 470740 5559787 132 184 -45 155.73 156.70 0.97 L458783 119 54 65
PCDD25-009A 470740 5559787 132 184 -45 180.76 181.76 1.00 L458794 16 3 143
PCDD25-009A 470740 5559787 132 184 -45 181.76 182.76 1.00 L458795 9 3 128
PCDD25-009A 470740 5559787 132 184 -45 210.00 210.30 0.30 L458798 5 2 213
PCDD25-009A 470740 5559787 132 184 -45 221.00 221.30 0.30 L458799 8 2 147
PCDD25-009A 470740 5559787 132 184 -45 283.25 284.00 0.75 L458813 18 3 108
PCDD25-009A 470740 5559787 132 184 -45 284.00 285.00 1.00 L458814 98 6 390
PCDD25-009A 470740 5559787 132 184 -45 285.00 285.49 0.49 L458815 55 3 407
PCDD25-009A 470740 5559787 132 184 -45 285.49 286.13 0.64 L458816 76 9 259
PCDD25-009A 470740 5559787 132 184 -45 298.92 299.92 1.00 L458834 102 2 55
PCDD25-010 470291 5557916 123 170 -45 79.28 80.00 0.72 L458896 5 240 26
PCDD25-010 470291 5557916 123 170 -45 127.00 128.00 1.00 L458928 1 154 7
PCDD25-011A 470291 5557915 123 170 -65 138.00 139.00 1.00 H100076 2 10 104
PCDD25-011A 470291 5557915 123 170 -65 157.00 158.00 1.00 H100097 4 2 121
PCDD25-011A 470291 5557915 123 170 -65 160.00 161.00 1.00 H100101 9 1 128
PCDD25-014 470462 5558025 131 170 -45 424.41 425.03 0.62 H091557 39 4 105
PCDD25-015 470488 5556666 118 170 -45 278.00 279.00 1.00 H091606 35 1 130
PCDD25-015 470488 5556666 118 170 -45 281.00 282.00 1.00 H091607 64 2 110
PCDD25-015 470488 5556666 118 170 -45 286.31 287.00 0.69 H091611 183 25 103
PCDD25-015 470488 5556666 118 170 -45 288.00 289.00 1.00 H091613 22 1 141
PCDD25-015 470488 5556666 118 170 -45 295.41 296.00 0.59 H091614 49 4 225
PCDD25-015 470488 5556666 118 170 -45 296.00 296.66 0.66 H091615 27 1 168
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
Project-Wide Airborne Geophysics Completed at Portland Creek Uranium Project
ASX:I88
Hole number UTM East UTM North
UTM
Elevation
Azimuth (o
) Dip (o
) From (m) To (m)
Interval
(m)
Sample ID Cu (ppm) Mo (ppm) Zn (ppm)
PCDD25-017 470700 5557873 135 327 -45 30.00 30.30 0.30 H091947 5 1 102
PCDD25-017 470700 5557873 135 327 -45 40.00 40.30 0.30 H091948 6 1 110
PCDD25-017 470700 5557873 135 327 -45 50.00 50.30 0.30 H091949 6 1 127
PCDD25-017 470700 5557873 135 327 -45 81.91 83.00 1.09 H091958 13 1 101
PCDD25-017 470700 5557873 135 327 -45 83.00 84.00 1.00 H091959 11 1 123
PCDD25-017 470700 5557873 135 327 -45 84.00 85.00 1.00 H091961 54 2 106
PCDD25-017 470700 5557873 135 327 -45 85.00 86.00 1.00 H091962 10 2 130
PCDD25-017 470700 5557873 135 327 -45 86.00 87.00 1.00 H091963 8 2 124
PCDD25-017 470700 5557873 135 327 -45 89.00 90.00 1.00 H091966 12 1 125
PCDD25-017 470700 5557873 135 327 -45 90.36 91.00 0.64 H091968 12 2 137
PCDD25-017 470700 5557873 135 327 -45 91.00 91.54 0.54 H091969 7 2 103
PCDD25-017 470700 5557873 135 327 -45 91.54 92.06 0.52 H091971 4 3 156
PCDD25-017 470700 5557873 135 327 -45 92.06 92.51 0.45 H091972 16 3 146
PCDD25-017 470700 5557873 135 327 -45 103.31 104.00 0.69 H091976 8 1 129
PCDD25-017 470700 5557873 135 327 -45 104.00 105.00 1.00 H091977 8 1 132
PCDD25-017 470700 5557873 135 327 -45 105.00 105.96 0.96 H091978 8 2 129
PCDD25-017 470700 5557873
Share your feedback
Discover