Mobilisation of Drill Rig & Geological Team Portland Creek
Released
Released
Announcement PDF
ASX Announcement
Released 3 September 2025
Mobilisation of Drill Rig and Geological
Team to Portland Creek Uranium Project
Infini’s geological team on site conducting mapping and sampling to refine
drillhole placement and support agile decision-making.
Drill rig mobilisation to the Portland Creek Uranium Project underway, with drilling
scheduled to commence in the coming weeks.
Rodren Drilling engaged for Phase 2 drilling, supported by Coast Mountain
Geological for program supervision, core logging, and geological reporting.
Program to test 12 priority targets within a >6km corridor of uranium-in-soil
anomalies (up to 74,997 ppm U₃O₈), associated with untested East-West faults.
Minimum 2,500m summer drill program developed to efficiently and effectively test
the exploration areas, with ability to scale the program based on drilling results.
Infini Resources Ltd (ASX: I88, “Infini” or the “Company”) is pleased to advise that its inhouse
geological team has mobilised to the Portland Creek Uranium Project in Newfoundland, Canada.
In addition to drill preparation, Infini’s geological team is undertaking detailed field activities including
geological mapping, rock chip sampling and final drill collar siting. These efforts are designed to validate
surface anomalies, refine structural interpretations, and ensure optimal drillhole placement and alignment
ahead of the upcoming Phase 2 drill program.
Mobilisation of the drill rig to the Portland Creek Uranium Project is also now underway, with transport
and logistical arrangements progressing to ensure timely arrival at site. The rig will be prepared to
commence drilling shortly after arrival, marking the transition from planning and targeting into active
exploration at Portland Creek.
Infini’s Chief Executive Officer, Rohan Bone, said: “The mobilisation of our geological team and drill
rig represents a major milestone for Infini. Phase 2 drilling will test the most compelling uranium targets
defined to date at Portland Creek, with the potential to deliver a significant uranium discovery in tier-1
uranium jurisdiction. We are entering an exciting phase where each metre drilled has the potential to
unlock immense value for shareholders.”
Portland Creek Uranium Project Phase 2 Drill Program Design
The Phase 2 drill program is designed to test multiple priority uranium anomalies, as shown in Figure 1,
interpreted to be associated with primary uranium mineralisation hosted in hydrothermal vein systems
and structurally controlled fault zones. Targets have been prioritised based on the integration of highresolution soil geochemistry, structural geology interpretation, and reconnaissance fieldwork.
The program has been designed with agility and flexibility in mind, allowing drilling intensity and scope to
be scaled in response to results. An initial minimum 2,500m campaign will focus on high-priority targets,
with early success guiding deeper and more targeted follow-up drilling. Drilling will focus on intersecting
East-West oriented fault zones interpreted to host shear-related uranium mineralisation as a potential
source for the project’s exceptionally high uranium-in-soil values, including peak assays of up to 74,997
ppm (~7.5%) U₃O₈. Indicative hole locations and orientations have been included in Figure 1, subject to
further geological mapping, early exploration results and final sighting for suitable drill sites.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
1
Mobilisation of Drill Rig and Geological Team to Portland Creek Uranium
Project
The Company will provide shareholders with further updates as the drill program progresses.
Figure 1: Overview of indicative number, location and orientation of drillholes for the planned Phase 2
diamond drilling program. Drillholes are designed to methodically test the exploration targets along
interpreted East-West fault corridors, with drillholes prioritised based on structural features, geochemical
anomalies, and indicators of hydrothermal alteration.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
2
Mobilisation of Drill Rig and Geological Team to Portland Creek Uranium
Project
About Portland Creek Uranium Project
The Portland Creek Uranium Project spans 149 km² and lies within the Precambrian Long-Range
Complex of the Humber Tectonic-Stratigraphic Zone. The geology consists of metaquartzite and a suite
of paragneisses, intruded by leucocratic granite, which are believed to have been thrust westward over
Paleozoic carbonate-dominant sediments.
The project area covers a large regional uranium anomaly, first identified in the 1970’s through a
Newfoundland government lake sediment sampling program. Originally, one uranium showing was
recorded in the Newfoundland Mineral Deposit Index, reporting 2,180 ppm U₃O₈. A compilation of historic
and recent exploration data has since delineated a 6 km zone of anomalous uranium and radon gas in
lake sediments, soils and in an airborne radiometric survey. This anomaly closely follows a prominent
fault scarp, marking the edge of a granitic plateau interpreted as a deep-seated fault.
Since listing, the Company has verified historical uranium anomalies and completed a soil sampling grid
over the Falls Lake Prospect (formerly the Talus Prospect). This work defined a ~800 m x 100 m highgrade uranium anomaly, with a peak result of 74,997 ppm U₃O₈. This anomaly is located down-ice and
west of a 1.5 km radiometric anomaly. Additionally, Infini has identified a southern 500 m-wide cluster of
high-grade soil samples, which includes a peak of 1,500 ppm U₃O₈ and lies 1.5 km from the recently
completed Phase 1 drill program.
Figure 2: Overview of exploration activity conducted at Portland Creek to date, demonstrating the occurrence of soil
sampling grades up to 74,997 ppm U₃O₈, anomalous radiometric data and Phase 1 drillholes.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
3
Mobilisation of Drill Rig and Geological Team to Portland Creek Uranium
Project
References
1.
2.
ASX Release, Infini Resources, Phase 2 Drilling at Portland Creek Set to Unlock High-Grade
Uranium Targets, 28th July 2025.
ASX Release, Infini Resources, Key Contractors Appointed for Phase 2 Drilling at Portland Creek
Uranium Project, 30th July 2025.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
4
Mobilisation of Drill Rig and Geological Team to Portland Creek Uranium
Project
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and more
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JOR 2012 Mineral Resource Deposit
JORC 2012 Classification
Tonnes and Grade
Des Herbiers (U)
Inferred Combined Resource
162 Mt @ 123ppm U3O8 (43.95mlb)
Competent Person & Compliance Statement
The information in this report that relates to exploration results for the Portland Creek Project is based on, and fairly represents,
information and supporting documentation compiled and evaluated by Mark Couzens, Principal Geologist for the Company who is
a Member of the AusIMM. Mr. Couzens has sufficient experience relevant to the style of mineralisation, type of deposit under
consideration, and the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australian
Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Mr. Couzens consents to the
inclusion of the information in the form and context in which it appears. The information in the market announcement is an accurate
representation of the available data and studies for the Portland Creek Project.
This announcement contains information on the Portland Creek Project extracted from ASX market announcements dated 10
January 2024, 15 January 2024, 29 January 2024, 19 February 2024, 3 May 2024, 28 May 2024, 1 July 2024, 10 July 2024, 22
July 2024, 14 October 2024, 23 December 2024, 26 March 2025, 4 July 2025, 14 July 2025, 28 July 2025 and 30 July 2025 reported
in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The original market announcements are available to view on www.infiniresources.com.au and
www.asx.com.au. The Company is not aware of any new information or data that materially affects the information included in the
original market announcement.
This report contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s Prospectus
dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in
any original announcement and that all material assumptions and technical parameters underpinning the estimates in the original
market announcement continue to apply and have not materially changed. The original market announcements are available to
view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
5
Share your feedback
Discover