Released 22 January 2026
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
1
Quarterly Activities Report For
Period Ending 31 December 2025
Quarterly Highlights
Completion of Phase 2 drilling at the flagship Portland Creek Uranium Project,
following identification of visible uranium and elevated uranium pXRF readings
across multiple targets, supporting the interpretation of a potential structurally
controlled uranium system.1
Portland Creek Project footprint expanded twice during the Quarter, significantly
increasing landholding by over 120% and consolidating control over key
structural corridors, radiometric trends and prospective geological extensions
contiguous with the project area.
Field programs completed at Reynolds Lake and Reitenbach Lake Uranium
Projects, including reconnaissance mapping, soil and rock-chip sampling and
scintillometer surveying. Phase 1 assays confirmed high-grade uranium
mineralisation, with 1.90% U₃O₈ returned from outcropping uraninite at surface at
the Titus Prospect within Reitenbach Lake.
Board strengthened with the appointment of Ms Pamela Naidoo-Ameglio as Non-
Executive Director.
Completion of A$11m in flow-through funding and a A$1m placement to expand
exploration activities at Portland Creek after encountering elevated uranium
mineralisation downhole in early drilling1
. A$11.9 million cash on hand at Quarter
end, supporting Infini’s planned 2026 exploration activities across its Canadian
uranium portfolio.
Infini Resources Ltd (ASX: I88, “Infini” or the “Company”) is pleased to report on its activities for the
quarter ended 31 December 2025 (the “Quarter”). During the Quarter, the Company advanced its project
portfolio completing Phase 2 drilling at the flagship Portland Creek Uranium Project, located in
Newfoundland, as well as completing field programs at the Reynolds Lake and Reitenbach Lake Uranium
Projects, located in the Athabasca region of Saskatchewan. The Company has also strengthened the
Board through a key appointment and commenced the optimisation of the project portfolio as it pushes
ahead with its next strategic growth phase.
1
Cautionary Statement: Portable XRF (pXRF) spot readings cited in this release are qualitative spot measurements and should not
be considered equivalent to laboratory assay results. pXRF values are subject to variability due to sample heterogeneity, surface
effects and instrument limitations. They are intended only as an indication of elemental presence and relative abundance and are
not representative of bulk grade or mineralisation. Definitive results will be confirmed through laboratory assays. In relation to the
disclosure of visual mineralisation, the Company cautions that visual estimates of mineral abundance should never be considered
a proxy or substitute for laboratory analysis where concentrates or grades are the factor of principal economic interest. Visual
estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Refer
to the Cautionary Statement.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
2
Summary of Exploration Activities
Portland Creek Uranium Project (100% owned, Newfoundland Canada)
The Portland Creek Uranium Project spans 328 km² and lies within the Precambrian Long-Range
Complex of the Humber Tectonic-Stratigraphic Zone. The geology consists of metaquartzite and a suite
of paragneisses, intruded by leucocratic granite, which are believed to have been thrust westward over
Paleozoic carbonate-dominant sediments.
The project area covers large regional uranium anomalies, first identified in the 1970’s through a
Newfoundland government lake-sediment sampling program. A uranium showing was recorded in the
Newfoundland Mineral Deposit Index, reporting 2,180 ppm U₃O₈. Compilation of historic and recent
exploration data has delineated a ~6 km zone of anomalous uranium and radon gas responses across
lake sediments, soils and airborne radiometric datasets. This anomalism closely follows a prominent fault
scarp, marking the edge of a granitic plateau interpreted as a deep-seated fault.
Since staking the project, the Company has verified historical uranium anomalies and completed a soil
sampling grid over the Falls Lake Prospect. This work defined a ~800 m x 100 m high-grade uranium
anomaly, with a peak soil result of 74,997 ppm U₃O₈. This anomaly is located down-ice and west of a 1.5
km radiometric anomaly. Additionally, Infini has identified a southern 500 m-wide cluster of high-grade
soil samples, which includes a peak of 1,500 ppm U₃O₈ and lies 1.5 km from the recently completed
Phase 2 drill program.
Completion of Phase 2 Diamond Drilling Program at Flagship Portland Creek project
During the Quarter, Infini completed its Phase 2 drilling campaign at its flagship Portland Creek Uranium
Project, building on results from earlier surface geochemistry, geophysics and structural interpretation.
The Phase 2 program totalled 5,310 metres across 17 drillholes, systematically testing eight priority
structural, geochemical and geophysical targets along a ~6 km corridor defined by major fault structures,
uranium-in-soil anomalies, radiometric highs and airborne EM conductors.
Phase 2 drilling returned visible uranium and elevated uranium spot pXRF values across multiple targets,
including mineralisation observed in holes separated by more than one kilometre, supporting the
interpretation of a potential multi-kilometre, structurally controlled uranium system. Elevated uranium
readings were found to be primarily hosted within fractures, joints, breccias and cavity zones in intensely
altered granites. Notably, drillhole PCDD25-012 intersected visible uraninite within intensely altered
granite, returning spot portable XRF readings of up to ~1.2% U along joint and fracture surfaces,
representing one of the strongest uranium responses recorded during the Phase 2 program. The drilling
also encountered polymetallic pathfinder readings (including molybdenum, zinc and copper) across
several holes, consistent with a broader hydrothermal system.
Overall, the Phase 2 drilling campaign validated Infini’s refined exploration model, confirmed that
structural corridors are the principal controls on mineralisation, and indicated the potential for a
polymetallic uranium system at Portland Creek. All drill core has been logged, photographed and
sampled, with samples submitted for laboratory analysis. Assay results from the Phase 2 program are
expected imminently in Q1 CY2026.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
3
Figure 1: Phase 2 drillhole locations with logged visible uranium, demonstrating the emerging potential
polymetallic uranium system at Portland Creek.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
4
Footprint expanded by overall 120% at the Portland Creek Uranium Project
During the Quarter, Infini significantly expanded its landholding at the Portland Creek Uranium Project on
two occasions, strengthening its control over an emerging prospective uranium district and securing
potential extensions of mineralised structures identified through recent exploration.
In October 2025, the Company completed a strategic expansion through the staking of 410 additional
mineral claims covering approximately 10,250 hectares, increasing the Portland Creek project area by
68%. The newly staked claims are contiguous with Infini’s existing licences and were selected to capture
interpreted extensions of east-west trending mineralised structures, prospective host lithologies and
coincident radiometric and geophysical anomalies identified during drilling and surface programs.
Subsequently, in December 2025, Infini secured a further expansion of the Portland Creek footprint
through a binding purchase agreement to acquire 7,700 hectares of additional contiguous mineral
licences, further consolidating its land position across the broader structural corridor. This second
expansion captured areas of strong uranium radiometric response and geological continuity with the
Company’s core licences, reinforcing the potential for a polymetallic uranium system. The transaction is
currently awaiting Ministry approval from the Newfoundland Department for Energy and Mines, expected
imminently.
Following these expansions, Infini’s total landholding at Portland Creek now exceeds 32,000 hectares,
providing increased exploration optionality and allowing for more effective targeting of regional-scale
structures as exploration progresses.
Integration of geological, geophysical and geochemical datasets across the expanded project area is
underway and will inform future field programs and drill targeting.
Figure 2: Infini’s footprint at the Portland Creek Uranium Project strategically increased by 17,950
hectares, covering possible extensions of mineralised structures and prospective host lithologies.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
5
Reynolds Lake and Reitenbach Lake Projects (100% owned, Saskatchewan Canada)
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 19 mineral claims
covering a total footprint of 677 km² on the eastern outboard margin of the Athabasca Basin in northern
Saskatchewan. The projects are contiguous, with Reynolds Lake consisting of 12 claims (386 km²) and
Reitenbach Lake consisting of 7 claims (291 km²) adjoining its northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are
bisected by the crustal-scale Needle Falls Shear Zone, a major structural corridor separating the
Wollaston Domain to the west from the Peter Lake Domain to the east. The Wollaston Domain is
dominated by Paleoproterozoic siliciclastic metasediments including paragneiss, quartzite, and calc-
silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic granitoid gneisses and
supracrustal rocks. Both domains are strongly deformed and metamorphosed, with northeast-trending
isoclinal folding and later cross-cutting north–south fault systems that provide structural complexity and
potential pathways for hydrothermal fluid flow.
Graphitic schists and gneisses, key lithologies known to host unconformity-associated uranium
mineralisation, have been identified within the project area and are spatially associated with
electromagnetic conductors, radiometric anomalies and elevated uranium-in-lake sediment samples.
Recent exploration has confirmed primary uranium mineralisation at surface at Reitenbach Lake, while
petrographic analysis has validated a structurally prepared and hydrothermally altered basement
environment consistent with an unconformity-related uranium system.
Regionally, the geological setting is considered analogous to uranium systems at Eagle Point and Rabbit
Lake, where mineralisation occurs along graphitic shear zones at the boundary between Wollaston
metasediments and granitoid basement.
Figure 3: Location of the Reynolds Lake Uranium Project and Reitenbach Uranium Project relative to the
world-renowned Athabasca Basin, synonymous with high-grade uranium deposits, and in close proximity to
existing operations, access and infrastructure.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
6
Completion of the Reynolds Lake and Reitenbach Lake Geophysics Interpretation and
Field Programs
During the Quarter, the Company advanced exploration across the Reynolds Lake and Reitenbach Lake
Uranium Projects, situated in the Athabasca region.
The Company completed its Phase 1 field program across both the Reynolds Lake and Reitenbach Lake
projects during the Quarter. Phase 1 activities comprised reconnaissance geological mapping, soil
sampling, rock-chip sampling and scintillometer surveying across priority target areas, resulting in the
collection of 773 soil samples and 148 rock-chip samples. Importantly, Phase 1 work led to the
identification of outcropping uraninite mineralisation at surface at the Titus Prospect within the Reitenbach
Lake project, confirming the presence of high-grade uranium mineralisation at surface.
In addition, a Phase 2 field program was completed during the Quarter, comprising follow-up geological
mapping and targeted rock-chip sampling, with a further 35 rock-chip samples collected. Phase 2 work
identified additional areas of elevated radioactivity, supported by multiple anomalous scintillometer
readings, extending the footprint of uranium prospectivity beyond areas identified during Phase 1.
Assay results from the Phase 1 field program were received during the Quarter and confirmed uraninite
mineralisation outcropping at surface at the Titus Prospect within the Reitenbach Lake Project. A peak
rock-chip sample returned 18,986 ppm U₃O₈ (1.9% U₃O₈), confirming the presence of high-grade uranium
mineralisation and validating the Company’s exploration model.
Integration of geological mapping, scintillometer data, assay results and interpreted geophysical datasets
is ongoing and will be used to refine priority target areas and to prepare a maiden drill program at
Reynolds Lake and Reitenbach Lake planned to commence in Q2 CY2026.
Cautionary Statement: In relation to handheld scintillometer readings, the Company cautions that
measurements of radioactivity from scintillometer readings are preliminary in nature and should not be
considered a proxy or substitute for quantitative analysis of a laboratory assay result. While scintillometers
confirm the presence of radioactivity, it does not accurately determine elemental uranium concentrations
and can also be influenced by the presence of thorium and potassium.
All samples from the Phase 2 field program at Reynolds Lake and Reitenbach Lake were dispatched to
ALS Laboratories for assay, with results received post Quarter (refer ASX announcement 19 January
2026).
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
7
Figure 4: Identification of visible disseminated uraninite1
showing at Reitenbach Lake (sample site
25RNBP083, 623459E, 6423998N, UTM Zone 13). Rock chip assay results of the sample have since
confirmed a grade of 1.90% U3O8.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
8
Figure 5: Assay results from the Phase 1 and Phase 2 field programs (note Phase 2 assays received post
Quarter, refer ASX announcement 19 January 2026) at Reynolds and Reitenbach Lake projects highlighting
coincidence of anomalous uranium-bearing samples with EM anomalies, RAD anomalies and key interpreted
geological structures.
Boulding Lake Uranium Project (100% owned, Saskatchewan Canada)
At Boulding Lake, preparatory data compilation continued during the Quarter, including integration of the
results from Infini’s earlier 1,300-line km airborne magnetic survey and geophysical interpretation of
regional conductors extending into the project area. The Boulding Lake property remains a strategic
component of Infini’s Athabasca Basin exploration portfolio, located within 100 km of Cameco’s high-
grade McArthur River and Eagle Point operations.
The Company did not complete any new work on the Boulding Lake Uranium Project during the Quarter.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
9
Des Herbiers Uranium Deposit (100% owned, Québec Canada)
The Des Herbiers Uranium Project consists of 66 non-contiguous claims totaling 36.25 km2. It is located
within the Des Herbiers township, approximately 9km NW of the Baie-Johan-Beetz municipality and 52km
ENE of the municipality of Havre St-Pierre on the Gulf of St. Lawrence in Quebec, Canada. The Project
is situated in the Grenville Province of the Canadian Shield. The rocks underlying the immediate area are
comprised of biotite rich granitic rocks, quartzites and quartzo-feldspathic gneisses that are derived from
strongly metamorphosed sandstones and arkoses, amphibole rich gabbros and gneisses. Regional
structures trend north to northwest and display large-scale curvilinear folding. Historical exploration and
drilling have revealed an abundance of low grade, near surface, bulk tonnage uranium that contains a
combined JORC compliant inferred mineral resource of 162Mt @ 123ppm U3O8.
With the Company focusing its working capital on the Portland Creak Project and ongoing field works at
the Reynolds and Reitenbach Lake Projects, limited exploration activities were undertaken during the
reporting period.
Figure 6: The Des Herbiers Uranium Project in plan view depicting anomalous radiometrics (U2
/Th), historical drilling and
trench channel sampling. Note the several large target areas that have never been drill tested.
Bellah Bore East Uranium Deposit (100% owned, Western Australia)
The Bellah Bore East deposit is approximately 500m x 150m in size and located within prospecting license
P 53/1703, comprising 92.67 hectares. The licence is situated within the western edge of the Company’s
already existing E 53/2188 tenement ~60km southwest of Wiluna (Yeelirrie Project). The deposit is hosted
by calcrete and comprises a historical inferred mineral resource in accordance with the JORC Code
(2004) (it is noted that these exploration results reported under the JORC 2004 code may not conform to
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
10
the requirements of the JORC Code 2012). Mineralisation is reported as open in the northeast. Carnotite
is identified as the primary ore mineral in historical drilling.
With the Company focusing its working capital on the Portland Creak Project and ongoing field works at
the Reynolds and Reitenbach Lake Projects, the Company did not complete any new work on the Bellah
Bore East deposit during the reporting period.
Yeelirrie North Uranium Project (100% owned, Western Australia)
The Yeelirrie North Project currently consists of exploration licence E53/2188, E53/2368 and prospecting
licence P53/1703, covering an area of ~329km², located approximately 70km southwest of Wiluna,
Western Australia. The Company currently has three exploration licence applications in progress and if
successfully granted, the remaining new exploration licence applications will see the Company’s Project
size increase to a total area of ~746km2. The Yeelirrie Project is located near the northern extremity of
the Archaean Norseman Wiluna greenstone belt of the Yilgarn Craton. The project is highly prospective
for hosting high-grade uranium mineralised calcrete and lies within the same geological domain as the
world class Yeelirrie Uranium Deposit hosting 128.1Mlb U3O8 at an average ore grade of 1500 ppm U3O8.
The Company is continuing to progress its access and Aboriginal heritage agreements in relation to the
previous licence applications.
Figure 7: Location of the newly staked exploration licences (highlighted red) at the world-class Yeelirrie uranium camp
showing the geological rationale with extensive and coincidental uranium-thorium anomalism identified in regional
radiometrics.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
11
Tinco Uranium-Niobium Project (75% Tinco North, 100% Tinco South, Saskatchewan
Canada)
The Tinco Uranium-Niobium Project lies to the south-southwest of the Athabasca Basin. It is underlain
by the Mudjatik Domain which is composed mainly of granitoid felsic gneisses of probable Archean age,
which are considered basement to narrow, arcuate to closed belts of supracrustal rocks of sedimentary
and volcanic origins. Two types of uranium mineralisation have been recognised in the area - occurrences
in remobilised basement and occurrences in supracrustal. Previous geological mapping has identified
lenses of radioactive pegmatite up to 1.5 m in width. Historical outcropping grab samples on the property
grade up to 600ppm U3O8 and 0.5% Nb.
Figure 8: The magnetic imagery results of the Tinco survey. Note the location and coincidence of the mineralized grab
sample with a major new interpreted shear zone corridor measuring 6km x ~1.5km.
In Q3 FY2025 a heliborne magnetic, radiometric and time-domain electromagnetic survey was completed
covering both claims. The survey was flown along a west-northwest orientation with lines spaced 100m
apart. The total survey comprised of 1030-line kms, flown at an average height of 36 m. Southern
Geoscience Consultants processed the data to produce a set of filtered images. These images were
interpreted to delineate magnetic and radiometric trends, classification of structures, lineaments, faults
and folds, delineation and interpretation of stratigraphic relationships including contacts, and to produce
a set of targets
The survey results indicate that high-resolution magnetic imagery has identified the presence of a major
north-south trending shear zone that contains the historical mineralized grab sample of 600ppm U3O8,
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
12
0.5% Nb (ASX:I88 Announcement 25 February 2025). This provides the Company with a large U-Nb
target for future exploration activities. In addition, there are several large ovoid magnetic features of
interest in the centre of the claims which are an additional area of interest that may be followed up with
surface geochemical surveys.
The Company did not complete any new work on the Tinco Uranium-Niobium Project during the reporting
period.
Paterson Lake Lithium Project (100% owned, Ontario Canada)
The Paterson Lake Project is located within the highly prospective Archean Separation Lake Greenstone
Belt of the Superior Province of Ontario, Canada. The Project has been documented to contain abundant
rare-metal bearing pegmatites including seven named petalite bearing pegmatites and up to 50 unnamed
pegmatites that require investigation. Historical outcrop grab sample results include results up to 4.43%
Li2O and the best reported historical drill intercept to date of 8m @ 3.12% Li2O. The Separation Rapids
Lithium Deposit of Avalon Advanced Materials/Sibelco joint venture is located within 2km of the project
boundary.
Figure 9: Location of the Paterson Lake Lithium Project depicting the microgravity survey locations overlain with 1VD
drone magnetics, MMI soil sampling, mineralised outcropping pegmatites and historical drillhole mineralisation.
The Company did not complete any new work on the Paterson Lake project during the reporting period.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
13
Valor Lithium Project (50% owned, earn-in up to 100%, Québec Canada)
The Valor Project covers an area of approximately 125km² in southwest Québec, approximately 40km
north-west of Val-d’Or. The project is situated on the Archean Preissac Lacorne batholith, a syn-to post-
tectonic intrusion that was emplaced in the Southern Volcanic Zone of the Abitibi Greenstone Belt of the
Superior Province of Québec. To the north the batholith is bounded by the Manneville Fault and to the
south by the Cadillac Fault and the eastward extension of the Porcupine Destor Fault. The batholith,
which is a composite body has associated pegmatites and quartz veins. After completing soil sampling
activities, the company has now identified several large scale LCT MMI geochemical anomalies.
The Company did not complete any new work on the Valor Lithium project during the reporting period.
Figure 10: Location of the Valor lithium project overlain with regional magnetics and historical mineral occurrences.
Pegasus Lithium Project (Western Australia)
The Pegasus Lithium Project consists of one granted exploration licence (E74/715) which covers an area
of 40 Blocks (~121km²) located approximately 15km southeast of Ravensthorpe in the Esperance region
of Western Australia. The project is considered prospective for hard-rock lithium-tantalum mineralisation
based primarily on geological and structural analogues drawn from Allkem Limited’s Mt Cattlin lithium
deposit located approximately 10km to the east. Following a review of exploration results and the
Company’s strategic focus on uranium assets in Canada, Infini elected to relinquish the Pegasus Project
during the December 2025 quarter. No further exploration work was undertaken during the reporting
period.
Quarterly Activities Report For Period Ending
31 December 2025
__________________________________________________________________________________
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
14
Cautionary Statements
The Company has defined the mineralisation in the field by using handheld pXRF technology to analyse
Portland Creek drill samples in real time. This allows for immediate on-site decisions to be made to adjust
drilling strategies.
While spot pXRF readings provide a useful indication of mineral content and approximate grades, they
are not a substitute for laboratory-derived assay grades and will not be used in any resource estimation.
All drill intercepts will be sent to an independent laboratory for accurate analysis, with assay results
expected in the current quarter. Portable spot pXRF results reported are considered semi-quantitative,
as such, results from pXRF analysis are stated as indicative only, provide confirmation that mineralisation
is present however may not be representative of elemental concentration within the material sampled and
are preliminary to subsequent confirmation (or otherwise) by geochemical laboratory analysis. Results of
pXRF analyses are included in this report for reference, and laboratory assays will be provided when
these become available.
Limitations include; very small analysis window (spot), possible inhomogeneous distribution of
mineralisation, analytical penetration depth, possible effects from irregular rock surfaces. Results are not
considered to be entirely representative of the rock samples, as the analyses were made of what were
interpreted to be areas on drill samples with potential to be uranium. The analyses were carried out on
drill core specimens and not ground powders. The pXRF is calibrated periodically against prepared
standards. The samples that are the subject of this report will be submitted for laboratory assay and some
variation from the results presented herein should be expected. Caution should be exercised until the
official assay laboratory results have been received.
While these preliminary results provide compelling evidence of high-grade mineralisation, the Company
notes that assay confirmation remains pending and further exploration is required to determine the
continuity and thickness of mineralised zones, which will be critical in defining the economic potential of
the mineralisation.
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral
abundance should never be considered a proxy or substitute for laboratory analysis where concentrates
or grades are the factor of principal exonymic interest. Visual estimates also potentially provide no
information regarding impurities or deleterious physical properties relevant to valuations The presence of
uranium minerals, including uraninite, is based on field observations and scintillometer readings only.
These indicators are preliminary in nature and should not be considered a substitute for laboratory
analysis. The identification of uranium mineralisation remains conceptual until confirmed through
geochemical assay and mineralogical reporting from accredited laboratories.
In relation to handheld scintillometer readings, the Company cautions that measurements of radioactivity
from scintillometer readings are preliminary in nature and should not be considered a proxy or substitute
for quantitative analysis of a laboratory assay result. While scintillometers confirm the presence of
radioactivity, it does not accurately determine elemental uranium concentrations and can also be
influenced by the presence of thorium and potassium.