Infini To Acquire Major Footprint In Athabasca Basin
Released
Released
Announcement PDF
ASX Announcement
Released 25 February 2025
Infini To Acquire Major Footprint In
Athabasca Basin
Infini strengthens its Canadian Uranium portfolio through the acquisition of Reynolds
and Boulding Lake properties, prospective for unconformity-style uranium deposits
Highlights
Infini has entered into a binding agreement to acquire 100% of the Reynolds and
Boulding Lake Uranium Projects, located in the Athabasca Basin region of
Saskatchewan, Canada
The Reynolds and Boulding Lake Projects comprises a total landholding of
931km2, with both projects located within a 100km of the world class McArthur
River and Eagle Point high grade uranium camps
The Athabasca Basin, located in northern Saskatchewan and Alberta, Canada, is
one of the world's richest sources of high-grade uranium. Spanning approximately
100,000 km2, it is host to some of the most prolific uranium deposits, including the
Cigar Lake and McArthur River mines
The acquisition aligns with Infini’s vision to become one of the most active
uranium exploration companies listed on the ASX, with highly anticipated maiden
drilling currently underway at its flagship Portland Creek Uranium Project
The Reynolds Lake Project comprises a 677 km2 landholding and contains
reported anomalous uranium in lake sediments and radiometric anomalies in
proximity to the underexplored Needle Falls shear zone.
Boulding Lake is a 254 km2 property directly adjacent to claims containing a large
number of radioactive boulders, with the potential for a primary uranium source
within the project area indicated by a magnetic low (interpreted basin sediments)
and south-west trending ice flow directions
Geophysical surveys to commence shortly across both Reynolds and Boulding
Lake projects to generate targets for follow up exploration activities
Upfront consideration of $1.6 million comprising the issue of 2,622,378 fully paid
ordinary shares at an issue price of $0.572 per share (15 day VWAP, 36%
premium to last close price) and $0.1m cash, plus $0.75m in performance rights
subject to drilling and resource milestones (convertible at the higher of the
15DWAP at achievement or $0.572).
High-resolution magnetic imagery has returned from Infini’s Tinco Project,
identifying a major north-south trending shear zone that contains the historical
mineralized grab sample of 600ppm U3O8, 0.5% Nb. This provides the Company
with a large U-Nb follow up target for future exploration activities.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
1
Infini To Acquire Major Footprint In Athabasca Basin
Infini Resources Ltd (ASX: I88, “Infini” or the “Company”) is pleased to announce that it has entered
into a binding share purchase agreement to acquire a 100% interest in the Reynolds and Boulding Lake
Uranium Projects, further strengthening the Company’s position as a major energy minerals focused
explorer.
Infini’s Managing Director and CEO, Charles Armstrong said: “The opportunistic acquisition of the
Reynolds and Boulding Lake properties provides Infini with a strategic foothold in the world-renowned
Athabasca Basin. After extensive review by our team, we believe these assets have the potential to
deliver substantial long-term value for our shareholders. As global demand for clean, reliable energy
grows, securing high-potential uranium exploration projects is increasingly vital to addressing the world's
future energy needs. These new assets complement our vision of building a diversified portfolio of
uranium targets, alongside our Portland Creek Uranium Project.
We remain highly focused on and committed to advancing our flagship Portland Creek Uranium Project.
The acquisition of the Reynolds and Boulding Lake properties further strengthens our exploration
strategy, but Portland Creek continues to be at the heart of our efforts. With drilling activities set to
intensify in the coming weeks, weather permitting, we are eager to continue unlocking the full potential of
this world-class exploration opportunity.”
About Reynolds and Boulding Lake
The Reynolds Lake Project comprises a significant 677km2 land package in the Athabasca basin area,
offering immediate exposure to a shallow unconformity-style uranium exploration opportunity in a premier,
uranium mining-friendly jurisdiction. The project is characterised by a regional fault, multiple surface
showings immediately along strike in either direction and radioactive boulders along trend. The geology
of the Reynolds Lake property comprises Paleoproterozoic Wollaston group rocks that lie unconformably
above Paleoproterozoic-modified Neoarchean granitoid basement and the Peter Lake Domain to the
east, with the Needle Falls SZ propagating in a northeast direction along the boundary between the two
(Figure 2).
Boulding Lake is a uranium exploration project located in Saskatchewan, Canada, 32km west of Cigar
Lake Uranium Mine. The Boulding Lake project is a traditional exploration play in the Athabasca basin
that offers exposure to several unconformity-style uranium plays in a premier, uranium mining-friendly
jurisdiction. The project is immediately west of Denison Mines’ Johnston Lake and 92 Energy’s Clover
projects. The total area of the project is 254km2. It is located adjacent to claims containing a large number
of radioactive boulders, with the potential for a primary uranium source within the project area indicated
by a magnetic low (interpreted basin sediments) and south-west trending ice flow directions (Figure 3).
Acquisition Terms
The Company has entered into a binding share purchase agreement to acquire 100% of the issued share
capital of U Energy Metals Pty Ltd, which holds a 100% interest in the Reynolds and Boulding Lake
Uranium projects in Saskatchewan, Canada. The Company has agreed to acquire a 100% interest in the
Reynolds and Boulding Lake projects in consideration for:
(a) Cash payment: At completion, the Company will pay cash payments to the vendors of AUD$100,000.
(b) Consideration Shares: At completion the Company will issue 2,622,378 fully paid I88 shares, at the
Company’s 15 trading day VWAP ($0.572 per share) (total value AUD$1,500,000), subject to 12
months escrow.
(c) Performance Rights: At completion, the Company will issue $750,000 worth of performance rights,
subject to the following vesting conditions;
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
2
Infini To Acquire Major Footprint In Athabasca Basin
Ref
Number of Performance Rights
Vesting condition
Expiry
A
The number that converts to I88 Shares to the
value of A$250,000 with reference to the
higher of the 15-Day VWAP prior to:
Infini announcing to ASX one drill intercept at
the Reynolds or Boulder projects of at least 10
metres of U3O8 with a minimum grade of 0.1%
or higher grade equivalent (eg 5m @ 0.2%
U3O8) (Vesting Condition A).
5:00pm (AWST) on the date
which is 3 years after the
date of issue of the
Performance Rights
Infini announcing to ASX 5 separate drill
intercepts at the Reynolds or Boulder projects
of at least 10 metres of U3O8 with a minimum
grade of 0.1% or higher grade equivalent (eg
5m @ 0.2% U3O8) (Vesting Condition B).
5:00pm (AWST) on the date
which is 3 years after the
date of issue of the
Performance Rights
Infini announcing to ASX a JORC compliant
Mineral Resources Estimate in respect of the
Reynolds or Boulder projects of at least 10
million pounds of U3O8, with a grade of 0.1%
or greater (Vesting Condition C).
5:00pm (AWST) on the date
which is 5 years after the
date of issue of the
Performance Rights
B
C
(a)
the date the Vesting Condition A is
satisfied; or
(b)
the Execution Date ($0.572 per share).
The number that converts to I88 Shares to the
value of A$250,000 with reference to the
higher of the 15-Day VWAP prior to:
(a)
the date the Vesting Condition B is
satisfied; or
(b)
the Execution Date ($0.572 per share).
The number that converts to I88 Shares to the
value of A$250,000 with reference to the
higher of the 15-Day VWAP prior to:
(a)
the date the Vesting Condition C is
satisfied; or
(b)
the Execution Date ($0.572 per share).
Note: 15-Day VWAP means the volume weighted average price of Buyer Shares calculated over 15 consecutive trading days.
The acquisition is subject to due diligence to the Company’s satisfaction and receipt of any required
regulatory, statutory and governmental consents and approvals and escrow agreements. Completion is
required to be completed by 31 March 2025. The Company will pay the cash component of the transaction
out of existing working capital. The projects vendors are unrelated parties of the Company. The
abovementioned consideration shares will be issued pursuant to the Company’s placement capacity
under ASX Listing Rule 7.1.
An Appendix 3B for the proposed issue of securities will follow this announcement.
Effect on Capital Structure
The capital structure of the Company on completion of the acquisitions will be as follows:
Capital Structure
Shares
Options
Performance
Rights
Existing Securities
70,931,891
10,766,666
1,660,000
Project Consideration Shares
2,622,378
-
1,311,189
Total
73,554,269
10,766,666
2,971,189
Note: Project Consideration Shares is based on 15 trading day VWAP of $0.572. Performance rights represents the maximum
number that may vest based on current VWAP. Should the respective performance hurdle be satisfied within the required
performance period, the number of shares may vary depending upon the 15 trading day VWAP at the time.
References
1 U Energy Metals, (2023). J.W. Patrick Lengyel. Compilation Report Reynolds Lake Project.
2 U Energy Metals. (2022). Information Memorandum Reynolds Lake Project
3 U Energy Metals, (2023). J.W. Patrick Lengyel. Compilation Report Boulding Lake Project.
4 U Energy Metals. (2022). Information Memorandum Boulding Lake Project
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
3
Infini To Acquire Major Footprint In Athabasca Basin
Figure 1: Location of the Reynolds Lake and Boulding Lake projects in the world class Athabasca Basin.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
4
Infini To Acquire Major Footprint In Athabasca Basin
Figure 2: Location of the Reynolds Lake project showing anomalous lake sediment analyses and airborne
radiometric anomalies.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
5
Infini To Acquire Major Footprint In Athabasca Basin
Figure 3: The Boulding Lake Project with government regional magnetics shown. Note the interpreted basin
sediments characterised by a magnetic low, running in a northeast-southwest direction through the claims.
Tinco Project Geophysical Survey
A heliborne magnetic, radiometric and time-domain electromagnetic survey has been completed over
Infini’s Tinco uranium project (both claims). The survey was flown along a west-northwest orientation with
lines spaced 100m apart. The total survey comprised of 1030-line kms, flown at an average height of 36
m. Southern Geoscience Consultants processed the data to produce a set of filtered images. These
images were interpreted to delineate magnetic and radiometric trends, classification of structures,
lineaments, faults and folds, delineation and interpretation of stratigraphic relationships including
contacts, and to produce a set of targets.
As indicated by the survey results in Figure 4, the high-resolution magnetic imagery has identified the
presence of a major north-south trending shear zone that contains the historical mineralized grab sample
of 600ppm U3O8, 0.5% Nb. This provides the Company with a large U-Nb follow up target for future
exploration activities. In addition, there are several large ovoid magnetic features of interest in the centre
of the claims which are an additional area of interest that can be followed up with surface geochemical
surveys.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
6
Infini To Acquire Major Footprint In Athabasca Basin
Figure 4: The magnetic imagery results of the Tinco survey. Note the location and coincidence of the
mineralized grab sample with a major new interpreted shear zone corridor measuring 6km x ~1.5km.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Charles Armstrong
Managing Director and CEO
P: +61 (08) 9465 1051
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada
and Western Australia for uranium and lithium. The Company has a diversified and highly prospective
portfolio of assets that includes greenfields and more advanced brownfields projects. The Company’s
mission is to increase shareholder wealth through exploration growth and mine development.
JOR 2012 Mineral Resource Deposit
JORC 2012 Classification
Tonnes and Grade
Des Herbiers (U)
Inferred Combined Resource
162 Mt @ 123ppm U3O8 (43.95mlb)
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
7
Infini To Acquire Major Footprint In Athabasca Basin
Competent Person Compliance Statement
The information contained in this announcement that relates to historical exploration results for the Reynolds and Boulding Lake
uranium projects is based on, and fairly represents, information and supporting documentation prepared by Mr Charles Armstrong,
who is Managing Director of the Company and is a member of the Australasian Institute of Mining and Metallurgy (AusIMM) and
the Society of Economic Geologists (SEG). Mr Armstrong has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person, as defined in the JORC
2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Armstrong has 9 years’
experience as an exploration geologist. Mr Armstrong consents to the inclusion in this report of the matters based on this information
in the form and context in which they appear. The information in the market announcement is an accurate representation of the
available data and studies for the Reynolds and Boulding Lake projects in Canada.
The information contained in this announcement that relates to exploration results for the Tinco uranium project is based on, and
fairly represents, information and supporting documentation prepared by Mr Charles Armstrong, who is Managing Director of the
Company and is a member of the Australasian Institute of Mining and Metallurgy (AusIMM) and the Society of Economic Geologists
(SEG). Mr Armstrong has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration,
and to the activity being undertaken to qualify as a Competent Person, as defined in the JORC 2012 edition of the “Australasian
Code for Reporting of Mineral Resources and Ore Reserves”. Mr Armstrong has 9 years’ experience as an exploration geologist.
Mr Armstrong consents to the inclusion in this report of the matters based on this information in the form and context in which they
appear.
This report contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s Prospectus
dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in
any original announcement and that all material assumptions and technical parameters underpinning the estimates in the original
market announcement continue to apply and have not materially changed. The original market announcements are available to
view on www.infiniresources.com.au and www.asx.com.au.
This report contains information on the Company’s Tino Project extracted from the Company’s Prospectus dated 30 November
2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance with the 2012 edition
of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original
market announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of
any new information or data that materially affects the information included in the original market announcement.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
8
Infini To Acquire Major Footprint In Athabasca Basin
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
•
•
•
•
Infini Resources Limited
Commentary
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed
information.
Reynolds Lake Project
All surface work was completed prior to 1986, with the
majority of it prior to 1970. QAQC protocols prior to 1990
were minor to non-existent. Duplicate samples, sample
blanks, and reference standards were not used.
Assessment reporting standards were minimal, and
technical reporting could be spartan, but most included a
basic sampling method description and usually the
laboratory and analytical methods used.
Most surface rock and boulder sampling was opportunistic
with samples taken wherever outcrops or glacial boulders
were present.
No mechanized channel sampling is reported. Rare rock
chip sampling was reported where consecutive chip
samples were taken across widths ranging up to 1 meter
across prospective bedrock mineralization in lieu of
mechanized channel sampling. Samples were collected in
plastic sample bags secured with tape. Sample tags from
prenumbered duplicate sample tag books were used in the
field and cross-checked upon return to camp each day.
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
9
Infini To Acquire Major Footprint In Athabasca Basin
Criteria
JORC Code explanation
Commentary
Soil sampling was completed on grids ranging from
reconnaissance grids established by pace and compass
method with 400-meter spaced lines and 200-meter spaced
sample intervals to cutline grids with 100-meter spaced
lines and 25 meter spaced sample intervals. Individual soil
samples were collected by digging pits by hand with a small
spade. Sampling targeted B horizon material but would
collect Ao horizon material if B horizon material was not
present. Samples were collected in kraft paper sampling
bags with folded tops. Samples numbers were written on
the sample bags and referenced by grid location and on
occasion grid coordinates were used as sample numbers.
While following up on airborne geophysical anomalies, all
field staff typically carried scintillometers and recorded
anomaly locations along reconnaissance or cutline grid
lines.
Lake water and lake bottom sediment samples were taken
at an approximate density of one sample per 0.8 km2.
Till, esker and outwash sediment samples were collected
on 400-meter intervals along 1600-meter spaced lines
using shovels to dig sampling pits that ranged in depth from
approximately 0.3-0.6 meters.
All streams were sampled on approximately 400 to 800
meter spacing and if a stream encountered a lake, samples
were collected at the entrance and outflow of the lake.
Boulding Lake Project
Surface work completed on the property occurred from
1978-2015 in semi-regularly spaced intervals including
1978-79, 1987-88, 1998-99, and 2006-2015.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
10
Infini To Acquire Major Footprint In Athabasca Basin
Criteria
JORC Code explanation
Commentary
1978-1979: Prospecting traverses were carried out on
approximately 400-meter spaced traverses and recorded
scintillometer readings at regular intervals, granitoid
boulders with readings >1000 cps were sampled,
sandstone boulders with readings >100 cps were sampled.
Radon soil gas surveys were completed on 50 meter
intervals along the traverses by inserting the radon probe of
a Pylon Model RM 1003 Radon Detector approximately 40
cm into a hole in the soil and using five strokes of the
provided pump introduced the soil gas into the counting
chamber of the detector. A background reading followed by
three one-minute readings were recorded and after each
sample the probe was removed from the hole and the
system flushed with fresh air.
Helium surveys were completed on grids with line spacings
at either 400 or 800 meters apart and 100-meter sample
intervals along the lines. At each sampling site, barometric
pressure and the temperatures of the air and soil were
recorded and samples were stored in hermitically sealed
aluminum containers and analyzed at a commercial
laboratory where they were subjected to a period of
equilibration at a constant temperature after which two gas
samples were extracted from each container and stored in
Bistable gas samplers. The gaseous contents of one set of
these Bistables were analyzed employing a Chemical
Projects Limited helium analyzer. During each analysis, the
concentration of helium in the sample was compared with
that of standards which have helium concentrations of 5.20
+/- 0.03 and 8.30 +/- 0.05 ppm (by volume). The C1-C3
hydrocarbon concentration was also determined.
Stream sediment sampling was completed along 100-meter
intervals along one stream where sample material was
available.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
11
Infini To Acquire Major Footprint In Athabasca Basin
Criteria
JORC Code explanation
Commentary
1987-88: Lake sediment sampling was completed on
approximately 2-kilometer spaced intervals and down to
0.5-kilometer spaced intervals locally and collected via
helicopter in the summer or through the ice in the winter
using a Hornbrook tube sampler.
https://science.gc.ca/site/science/en/educationalresources/history-geological-survey-canada-175objects/115-hornbrook-sampler-1972
1998-99: Boulder sampling was completed on 2-kilometer
spaced lines with 100-meter spaced sample spacing along
each line. At each site, a composite boulder sample was
collected by taking chips from approximately 10 boulders
found within several meters of each sample site from
angular boulders and to avoid basement-derived boulders
entirely. Sample analysis included Na2O to discriminate out
basement chips in samples. Field parameter site data
including sandstone versus basement proportion, size,
angularity of sampled boulders and relative density of
exposed boulders, as well as the number of boulders
sampled were recorded. Duplicate samples were collected
at 13 of 379 sample sites by collecting chips from twice as
many boulders and dividing them equally into two separate
bags. Blank or reference samples were not submitted with
the samples for analysis, but lab reference sample results
were reported.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
12
Infini To Acquire Major Footprint In Athabasca Basin
Criteria
JORC Code explanation
Commentary
2006-2015: Boulder sampling (2006-07) including sampling
Athabasca sandstone boulders on 200-meter intervals
along lines spaced 600 to 800 meters apart. Chips were
taken from 10 boulders at each site preferentially sampling
angular boulders and striving to avoid conglomerate or
basement sourced boulders. Site data collected included
GPS coordinates, landform, drift type, boulder density,
maximum and minimum boulder size, roundness,
percentage of basement boulders, date and sampler. Field
duplicates were taken for every 1 of 20 samples and two
reference standards were inserted for each batch
processed at the laboratory amounting to approximately
one reanalysis and two reference standards for every 30
samples.
Lake sediment samples (2006) were collected via floatequipped helicopters using a Hornbrooke-type tube
sampler where samples were placed into plastic bags and
site details including GPS coordinate, sample depth,
sample description, colour, date and sampler were
recorded. A duplicate field sample was taken at every 12th
site from the 588-sample survey.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
13
Infini To Acquire Major Footprint In Athabasca Basin
Criteria
JORC Code explanation
Commentary
Soil sampling of B & C horizons (2011-12) was completed
on a primary grid with 500-meter spaced sample intervals
where individual sample site locations were obtained using
Garmin GPS equipment. Stainless steel shovels were used
to dig to depths ranging from 40-80 centimeters. A 1kilogram sample of soil was collected at each site from
each of the A1 (where present) and C soil horizons, and
from horizon B where A and C were unavailable. Sample
material was taken from the fresh surface of the side of the
hole and placed in double zipper Ziplock bags with
approximately half of each sample submitted for clay
separation and analysis and the remainder stored for
potential future analysis.
Vegetation and tree core samples (2011-12) were collected
on a secondary grid offset from the primary grid, with 500
meter spaced sample intervals where individual sample site
locations were obtained using Garmin GPS equipment.
Vegetation sampling collected twigs and needles jack pine
samples and twigs from black spruce samples. Samples
were taken from multiple limbs around the tree from the
outermost 8-10 inches providing a sample of approximately
10 years of the most recent growth of the trees using
stainless steel tree clippers and collected enough material
to fill a 7 x 12.5-inch polypropylene bag, or approximately
500 grams of sample. Preference was given to black
spruce trees over jack pine trees in the field due to the
higher elemental concentrations of important pathfinder
elements observed in the former.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
14
Infini To Acquire Major Footprint In Athabasca Basin
Criteria
JORC Code explanation
Commentary
•
•
Drilling
techniques
Infini Resources Limited
•
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
ABN 77 656 098 583
•
Tree core samples (2011-12) were collected using a 35.56
cm x 5.15 mm tree bore sampler through the middle of the
tree on a north-south bearing and placed in plastic straws
and sealed with tape for storage and transport. Where
possible, samples were preferentially selected from treering intervals corresponding to ages between 1970-1985 to
minimize anthropogenic contamination from significant
mining in the Athabasca basin. Preference was given to
black spruce trees over jack pine trees in the field due to
the higher elemental concentrations of important pathfinder
elements observed in the former. Not all areas were
conducive to tree core collection due to large areas of
immature jack pine forest cover. The most mature trees
were sampled at each location and cored immature trees
near the base.
Historical reports mostly dating from the 1970s and 1980s
rarely present comprehensive information on the nature
and quality of sampling.
There is no information in the historical reports on any
measures taken to ensure sample representivity. Geiger
counters and scintillometers were used to record surface
radioactivity in counts per minute or counts per second
(referring to beta- and gamma rays respectively) and
generally do not require calibration.
Not applicable as n
Share your feedback
Discover