Phase-1 Drilling Confirms Prospectivity at Portland Creek
Released
Released
Announcement PDF
ASX Announcement
Released 4 July 2025
Phase-1 Drill Assays Confirm
Prospectivity for Shear-Hosted Uranium
System at Portland Creek
Assay results from Phase 1 reveal elevated pathfinders La and Ce and high K and Na
confirming significant hydrothermal alteration (albitization) and highlighting
prospectivity for shear-hosted uranium system that remains untested
Highly anomalous uranium pathfinders such as La and Ce returned in assays of
drill core together with elevated K and Na confirming albitization, a type of
hydrothermal alteration, observed in core.
Structural data collected from drill core indicates drilling was largely subparallel to
the dominant N-S interpreted thrust fault, meaning the primary structural target
remains untested. Multiple additional key structural targets located proximal to
major uranium-in-soil anomalies with a peak value of 74,997 ppm U3O8 remain
untested.
The Trident Lake fault zone is host to highly anomalous geological indicators for a
potential uranium discovery, including favourable structures, surface anomalism
(U, Pb isotope ratios, radon gas, radiometrics, LREE pathfinders, uranium-in-lake
sediments) and widespread hydrothermal alteration observed in drill core.
A detailed review of the Phase 1 drill data has commenced including structural
review, geochemical analysis, petrological analysis and geological modelling. This
will lead to planning of the Phase 2 diamond drilling program, expected to
commence CY Q3 2025.
Greater drilling productivity expected based on improved weather conditions,
location experience and boots-on-the-ground support from Infini’s in-country
Exploration Manager, Nick Mitchell, and newly appointed CEO, Rohan Bone.
Infini positioned as one of the most active Canadian junior uranium explorers
coincident with the USA’s recent Executive Order to expedite and promote the
production and operation of nuclear energy, deemed necessary to power the next
generation of technologies and protect national security1.
Infini Resources Ltd (ASX: I88, “Infini” or the “Company”) announces the receipt of assays from its
Phase 1 diamond drilling program conducted at its 100% owned Portland Creek Uranium Project in
Newfoundland, Canada, and confirmation of the planned Phase 2 diamond drilling program, expected to
commence in Q3 2025.
Infini’s Chief Executive Officer, Rohan Bone, said: "Completion of Infini’s Phase 1 drill program at
Portland Creek is a significant step for the Company. Proving that uranium mineralisation above
background levels exists in the system gives us confidence to proceed with Phase 2 drilling targeting
significant uranium mineralisation. The observed widespread presence of uranium pathfinders, shear
zone-hosted hydrothermal alteration and structural indicators in drill core allows us to refine our
understanding of the target mineralisation and zone-in on key structures. The potential for a significant
uranium system at Portland Creek has been strengthened by the results seen from the Phase 1 drilling
program and we greatly anticipate the commencement of the Phase 2 drill program in Q3 2025."
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
1
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium
System at Portland Creek
Completion of Infini’s Phase 1 drill program at Portland Creek
Infini Resources announces receipt of assay results from its initial drill program (Phase 1) at the Fall Lake
prospect (Portland Creek Uranium Project), located in northwestern Newfoundland.
The program comprised only six diamond drill holes (of up to 23 permitted holes) for a total of 3,150
metres drilled across an estimated strike length of 625m. A total of 1,386 core samples were collected
and submitted for multi-element analysis, with results confirming the presence of highly anomalous
pathfinder elements and trace uranium mineralisation.
In addition to assay results, televiewer and spectral gamma ray logging were completed on four holes by
Terrane Geoscience Inc. Interpretation of this data, in combination with detailed lithological logging and
oriented structural measurements, has revealed drilling was largely subparallel to the dominant
structure, meaning the primary structural target remains untested.
Importantly, early-stage analysis indicates structural and geochemical characteristics analogous to known
shear-hosted uranium deposits, including the Valhalla deposit in the Mount Isa region of Australia and
the Caetité (Cachoeira) Mine of Brazil.
Infini’s Non-Executive Director, Dr. Andrew Wilde, said: "Results from the first phase drill program
are promising. The presence of uranium pathfinders, significant shear zones and extensive hydrothermal
alteration observed in the drill core validate the company’s exploration model and provide support to
define high-priority drill targets for the next phase of exploration."
Summary of the Phase 1 drill program objectives
The Phase 1 drill program focused on the high-grade uranium-in-soil results identified at the Falls Lake
(formerly Talus) Prospect. The Falls Lake Prospect is part of the broader Trident Lake Zone — a 6 km
long corridor of anomalous uranium in soils and lake sediments and radon gas in soils coincident with a
major structural corridor.
The Phase 1 drill program, as shown in Figure 1, was centred on the Falls Lake Prospect and targeted
geological structures within the granitoids of the North-South trending magnetic zone and was
successfully executed to develop a greater understanding of the Fall Lake Prospect as it relates to local
mineralisation and geological structures. The results of Phase 1 are crucial in informing a depositvectoring approach for the Phase 2 drill program.
Up to 23 drill holes were permitted over a phased drill program, however challenging weather conditions
experienced during the Canadian winter resulted in reduced drill penetration rates coincident with the
necessary consideration for the local wildlife migration season which ultimately resulted in a reduction in
scale of the drilling program and left the number of highly prospective structures untested. The Company
is now diligently working to incorporate and interpret the latest assay and structural data collected from
the drill core of the Phase 1 drilling program to refine the targets for the next phase of exploration.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
2
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium
System at Portland Creek
Figure 1: Overview of Phase 1 drilling program completed at Portland Creek, Newfoundland in Q1 2025.
Assay results from the Phase 1 Drilling Program at Portland Creek confirm hydrothermal
alteration and uranium pathfinders
The recently returned Lanthanum (La) and Cerium (Ce), Sodium Oxide (Na2O) and Potassium (K) Assays
from the drill core demonstrate a structurally focused hydrothermal alteration system analogous to known
shear-hosted uranium deposits, including the Valhalla deposit in the Mount Isa region of Australia, and
the Caetité (Cachoeira) Mine, Brazil. This hydrothermal alteration is particularly well displayed in hole
PCDD002, shown in Figure 2.
Uranium values from the assays and from the previously reported pXRF readings are promising. Narrow
intervals and spot pXFR samples indicate anomalous uranium is present within the Phase 1 target area,
as shown in Annexure A.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
3
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium
System at Portland Creek
In shear-hosted uranium deposits, enrichment in Light Rare Earth Elements (LREEs) such as La and Ce
are typically considered pathfinder or alteration-related, associated with shear zone hosted uranium
deposits, rather than economic in its own right. LREEs present in anomalous or enriched levels can
indicate proximity to mineralisation zones inter alia. More than fifty samples from Phase 1 of the diamond
drilling program at Portland Creek returned anomalous values of Ce, La, Na or K ranging up to maximums
of 1,785 ppm Ce, 920 ppm La, 11% Na or 65,700 ppm K respectively.
An example of an anomalous shear/fault zone was intersected in PCDD006 between 404.8–407.4 m
(Figure 2). Narrow sheared bands (2–10 cm wide) indicate localized structural deformation and potential
fluid flow pathways. Assays from this zone returned elevated values of Ce (1,440 ppm), K (48,300 ppm),
La (733 ppm), and Na₂O (4.07 wt%).
Figure 2: Example of highly anomalous hydrothermal alteration within faults and shears, PCDD006, 404.8 – 407.4m.
Key components of shear-hosted uranium systems identified at Portland Creek, however data
collected from Phase 1 indicates primary structural target remains untested
The Portland Creek Project is located on the southwestern margin of the Long-Range Mountain Inlier.
This region is a highly prospective target area for structurally controlled uranium mineralisation along
shear zones located at, or near, major lithological boundaries. Structural uplift of the inlier was driven by
regional thrusting and crustal shortening during the Taconic and Acadian orogenies, resulting in the
development of major shear zones, brittle-ductile faults, and reactivated basement structures. These
features acted as favourable conduits for fluid flow and are marked by LREE enrichment and Nametasomatized zones – key components of shear-hosted uranium systems.
Structural data from 1,622 televiewer measurements were collected. The optical televiewer plots of
foliation, joints, and faults from three of the six drill holes indicate a coherent structural pattern. Foliation
observed is largely consistent with joint orientation, suggesting a regionally coherent structural fabric.
Three distinct foliation populations have been identified: a dominant, shallowly dipping set trending
eastward, and two steeply dipping sets—one dipping east and the other west. These steeply inclined
foliations may represent the opposing limbs of a recumbent fold structure or, alternatively, record
overprinting from two separate ductile deformation events. Importantly, there is albitization and coincident
enrichment in LREEs and Na2O within, or up to 5 meters from the logged shear and fault zones.
A stereographic projection (lower hemisphere) of the 84 measured faults and shear planes shows a
dominant cluster of poles plunging moderately to steeply southwest (~210–230º), consistent with a main
population of steeply east-dipping structures striking NW–SE. These likely represent a principal shear
zone or the eastern limb of a broader fold or thrust system. Two additional fault populations are observed:
one of steep west-dipping planes (~080–100º), potentially representing conjugate shears or the opposing
fold limb; and another of shallowly dipping planes trending eastward, possibly reflecting low-angle
thrusting or regional foliation. This distribution supports either a recumbent fold geometry or a bivergent
shear zone developed during ductile deformation. Notably, drilling was largely subparallel to the dominant
shear orientation, as illustrated in Figure 3, meaning the primary structural target remains untested.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
4
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium
System at Portland Creek
Figure 3: Cross-section of the Fall Lake Prospect illustrating subparallel orientation of drillholes relative to the orientation
of the inferred thrust fault and inferred secondary structures, leaving the primary structural target untested.
Targeting strategy of key structures being refined and preparation for future exploration activities
now underway, planned to commence in Q3 2025
Work is now advancing on the in-depth interpretation of structural, geochemistry and geophysics data
collated across the soil sampling program, two UAV magnetic surveys and Phase 1 drill program to date.
Outcomes from this program of work will further refine the targeting strategy, focusing on favourable
structures, surface anomalism (U, Pb isotope ratios, radon gas, radiometrics, uranium-in-lake anomalism)
and widespread hydrothermal alteration.
Planning for Phase 2 of the diamond drilling program at Portland Creek is underway, with drilling expected
to commence in Q3 2025. Phase 2 of the diamond drill program at Portland Creek will be managed by
Nick Mitchell, Infini Resources’ in-country Exploration Manager, and closely supported by the Infini board
and management. By leveraging the collective exploration- and operations-based Canadian experienced
gained through the recent appointments of Rohan Bone, CEO of Infini Resources, and Nick Mitchell to
Infini Resources, significant focus will be made to ensure the program is undertaken efficiently and
effectively to explore the number of highly prospective uranium targets that remain untested.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
5
ASX Announcement
Released 4 July 2025
About Portland Creek Uranium Project
The Portland Creek Project spans 149 km² and lies within the Precambrian Long-Range Complex of the
Humber Tectonic-Stratigraphic Zone. The geology consists of metaquartzite and a suite of paragneisses,
intruded by leucocratic granite, which are believed to have been thrust westward over Paleozoic
carbonate-dominant sediments.
The project area covers a large regional uranium anomaly, first identified in the 1970’s through a
Newfoundland government lake sediment sampling program. Originally, one uranium showing was
recorded in the Newfoundland Mineral Deposit Index, reporting 2,180 ppm U₃O₈. A compilation of historic
and recent exploration data has since delineated a 6 km zone of anomalous uranium and radon gas in
lake sediments, soils and in an airborne radiometric survey. This anomaly closely follows a prominent
fault scarp, marking the edge of a granitic plateau interpreted as a deep-seated fault.
Since listing, the Company has verified historical uranium anomalies and completed a soil sampling grid
over the Falls Lake Prospect (formerly the Talus Prospect). This work defined a ~800 m x 100 m highgrade uranium anomaly, with a peak result of 74,997 ppm U₃O₈. This anomaly is located down-ice and
west of a 1.5 km radiometric anomaly. Additionally, Infini has identified a southern 500 m-wide cluster of
high-grade soil samples, which includes a peak of 1,500 ppm U₃O₈ and lies 1.5 km from the recently
completed Phase 1 drill program.
Figure 4: Overview of exploration activity conducted at Portland Creek to date, demonstrating the occurrence of soil
sampling grades up to 74,997 ppm U₃O₈ and Phase 1 drilling confirming widespread hydrothermal alteration and
albitization.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
6
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium
System at Portland Creek
References
1.
Fact Sheet: President Donald J. Trump Reinvigorates the Nuclear Industrial Base; The White House;
May 23, 2025.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
7
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium
System at Portland Creek
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and more
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JOR 2012 Mineral Resource Deposit
JORC 2012 Classification
Tonnes and Grade
Des Herbiers (U)
Inferred Combined Resource
162 Mt @ 123ppm U3O8 (43.95mlb)
Competent Person & Compliance Statement
The information in this report that relates to exploration results for the Portland Creek Project is based on, and fairly represents,
information and supporting documentation compiled and evaluated by Mark Couzens, a consulting geologist to the Company who
is a Member of the AusIMM. Mr. Couzens has sufficient experience relevant to the style of mineralisation, type of deposit under
consideration, and the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australian
Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Mr. Couzens consents to the
inclusion of the information in the form and context in which it appears. The information in the market announcement is an accurate
representation of the available data and studies for the Portland Creek Project.
This announcement contains information on the Portland Creek Project extracted from ASX market announcements dated 10
January 2024, 15 January 2024, 29 January 2024, 19 February 2024, 28 May 2024, 1 July 2024, 10 July 2024, 22 July 2024, 14
October 2024, 23 December 2024 and 26 March 2025 reported in accordance with the 2012 edition of the “Australian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). This announcement contains information
on the Company’s Boulding Lake and Reynolds Lake Projects extracted from the Company’s announcement dated 25 February
2025 reported in accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (JORC Code). The original market announcements are available to view on www.infiniresources.com.au and
www.asx.com.au. The Company is not aware of any new information or data that materially affects the information included in the
original market announcement.
This report contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s Prospectus
dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The Company confirms that it is not aware of any new information or data that materially affects the information included in
any original announcement and that all material assumptions and technical parameters underpinning the estimates in the original
market announcement continue to apply and have not materially changed. The original market announcements are available to
view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Infini Resources Limited
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
8
ASX Announcement
Released 4 July 2025
Annexure A: Intersections of anomalous uranium observed in the drill core from Phase 1 drilling at Portland Creek.
Table 1: Material drill hole samples taken from the Phase 1 drilling program at Portland Creek demonstrating localised uranium intercepts. Intervals are down hole length. True width
not known. Mineralised intervals (>50 ppm U3O8) and greater than 0.5m.
UTM East
UTM North
UTM
Elevation
Azimuth
Dip
PCDD005
470687
5559595
130
90
PCDD005
470687
5559595
130
PCDD002
470660
5559576
PCDD003
470713
PCDD006
470741
Hole
Infini Resources Limited
From (m)
To (m)
Sample ID
U ppm
U3O8 ppm
-45
93.5
94.5
J024332
96.2
113.44
90
-45
550
551
J024553
94
110.84
129
90
-45
109.25
110
J024294
93.1
109.78
5559444
129
90
-45
432.4
433
J024751
72.4
85.37
5559794
134
90
-45
65
66
314046
55.6
65.56
ABN 77 656 098 583
www.infiniresources.com.au
InfiniResources
9
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium System at Portland Creek
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
•
•
•
•
Drilling
techniques
Infini Resources Limited
•
Commentary
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
ABN 77 656 098 583
•
•
•
•
•
Details of Infini’s soil sampling and historic lake sediment
sampling have been reported previously (ASX 1st July 2024
& 10th July 2024).
Core was analyses using a portable XRF (pXRF) as
described previously (ASX 26th March 2025).
Spectral gamma measurements were obtained for each hole
(except where precluded by blockages) using a QL40 SGR2G Spectral Gamma Ray Probe made by Advanced Logic
Technology (ALT). All logging was “within drill rod” and was
completed by trained technicians from Terrane Geoscience
Ltd. The probe measured natural gamma radiation every 5
cm along the length of the drill hole.
Details of Infini’s drilling have been reported previously (ASX
30th January 2025, 18th February 2025 & 26th March 2025).
Drilling was undertaken by two heli-transportable diamond
drill rigs. The core was NG gauge on a single 10m core
tube. The core was oriented with a ACT III RD tool.
www.infiniresources.com.au
InfiniResources
10
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium System at Portland Creek
Criteria
Drill sample
recovery
JORC Code explanation
•
•
•
Logging
•
•
•
Sub-sampling
techniques
and sample
preparation
•
•
•
•
•
•
Infini Resources Limited
Commentary
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
•
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
ABN 77 656 098 583
•
•
•
•
•
•
•
1.
2.
3.
4.
•
•
Core recovery was based on depths assigned by the
drillers and measurement of core for that interval by Infini’s
contractors and recorded in a spreadsheet.
Recovery is generally better than 95%, so no special
measures are required. In areas with lower recovery core
lose was assigned to the intervals with broken and faulted
core.
No relationship between sample recovery and grade was
established.
Core has been visually logged and this is supplemented by
optical and acoustic televiewer logging. Visual logging is
qualitative but measurements of various structures derived
from the televiewer data are quantitative.
All core is photographed and the imagery imported into an
online database (Imago)
Each hole is logged in its entirety
Core samples were cut in half with a diamond core saw at
between 0.5-1.0 m intervals to ensure representativity.
Each sample interval consists of one half of the cut NQ drill
core.
Each sample was bagged with a numbered tag. Prep-31 was
completed on each sample:
PUL-QC Pulverizing QC Test
CRU-31 Fine crushing – 70% <2mm
SPL-21 Split sample – riffle splitter
PUL-31 Pulverize up to 250g 85% <75 µm
Analysis was completed using ME-MS61L, with selective
ME-MS61L for Pb isotopes.
ALS Global was the lab selected for the analytical work.
www.infiniresources.com.au
InfiniResources
11
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium System at Portland Creek
Criteria
Quality of
assay data
and laboratory
tests
JORC Code explanation
•
•
•
Verification of
sampling and
assaying
•
•
•
•
Location of
data points
•
•
•
Data spacing
and
distribution
•
•
•
Infini Resources Limited
Commentary
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the technique
is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
•
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
ABN 77 656 098 583
•
•
•
•
•
•
Blanks and certified reference materials are inserted every
50 and 33 samples, respectively. QAQC samples were
reviewed for contamination or failure, defined as 3x SDV of
the reference material with is ISO certified.
At the start of each day the pXRF was calibration checked
and both a silica blank (blank) and uranium certified
reference material analysed (CRM). Blanks and CRMs were
inserted every 50 samples, and a calibration check
completed.
Samples of core from the drilling program were submitted
to ALS Global for trace element assays, in line with ALS
Global’s QA/QC processes.
Verification of encountered intersections was conducted by
Infini Resources’ Exploration Manager.
Data collected was completed using a logging program MX
Deposit. Logs were uploaded each evening and stored on a
cloud server. Internal data checks and quality control are
built into the logging software to ensure no gaps or incorrect
coding was used.
All drillhole and sample co-ordinates relate to NAD83 UTM
Zone 21N.
Collar and soil sample locations were surveyed using
handheld GPS.
LIDAR data flown by Infini are used to establish collar RL
Soil sample spacing is considered appropriate at this stage
of exploration
Drillhole collar spacing is designed to intersect the source
of anomalous uranium in soil and not determine a resource
estimate.
www.infiniresources.com.au
InfiniResources
12
Phase-1 Drill Assays Confirm Prospectivity for Shear-Hosted Uranium System at Portland Creek
Criteria
JORC Code explanation
Commentary
•
•
Orientation of
data in relation
to geological
structure
•
Not applicable as no Mineral Resource and Ore Reserves
are rep
Share your feedback
Discover