Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
Released 30 October 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
1
Quarterly Activities Report For
Period Ending 30 September 2025
Quarterly Highlights
Phase 2 diamond drilling commenced at the flagship Portland Creek Uranium
Project (Newfoundland), following the identification of 12 high-priority uranium
targets along a major 6 km corridor of uranium-in-soil anomalies and highly
prospective fault structures.
Multiple large-scale EM conductors (largest >10 km long) coincident with
radiometric and geochemical U anomalism identified at the Reynolds and
Reitenbach Lake Uranium Projects, representing compelling targets for potential
shallow unconformity-style uranium mineralisation at the outboard edge of the
Athabasca Basin.
Maiden field campaign commenced at Reynolds and Reitenbach Lake Uranium
Projects, comprising the collection of >1,000 soil and rock-chip samples, highly
anomalous scintillometer readings up to 67,540 cps1
and identification of visible
uraninite2
at surface.
Board strengthened with the appointment of Mr Faheem Ahmed as Non-Executive
Director and transition of Dr David Pevcic to Non-Executive Chairman.
During the quarter the Company completed a A$3.2m placement, with strong
interest received from new and existing institutional and sophisticated
participants. Subsequent to the quarter, an additional A$11m in flow-through
funding and a A$1m placement completed to expand exploration activities at
Portland Creek after encountering extensive downhole uranium in early drilling1
.
Infini Resources Ltd (ASX: I88, “Infini” or the “Company”) is pleased to report on its activities for the
quarter ended 30 September 2025 (the “Quarter”). During the Quarter, the Company advanced its
project portfolio commencing drilling at the flagship Portland Creek Uranium Project, located in
Newfoundland, as well as undertaking field programs at the Reynolds Lake and Reitenbach Lake
Uranium Projects, located in the Athabasca region of Saskatchewan. The Company has also
strengthened the Board through key appointments and commenced the strategic optimisation of the
project portfolio as it pushes ahead with its next strategic growth phase.
1
Cautionary Statement: In relation to handheld scintillometer readings, the Company cautions that measurements of radioactivity
from scintillometer readings are preliminary in nature and should not be considered a proxy or substitute for quantitative analysis of
a laboratory assay result. While scintillometers confirm the presence of radioactivity, it does not accurately determine elemental
uranium concentrations and can also be influenced by the presence of thorium and potassium.
2
Cautionary Statement: In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral
abundance should never be considered a proxy or substitute for laboratory analysis where concentrates or grades are the factor of
principal exonymic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations. The presence of uranium minerals, including uraninite, is based on field observations and
scintillometer readings only.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
2
Summary of Exploration Activities
Portland Creek Uranium Project (100% owned, Newfoundland Canada)
The Portland Creek Project is situated in the Precambrian Long-Range Complex of the Humber Tectonic
– Stratigraphic zone. This zone contains metaquartzite and a suite of paragneisses, intruded by
leucocratic pink granite, which is locally radioactive. Infini’s Claims are situated over a large regional
uranium anomaly that was identified in the 1970s by a Newfoundland government sampling program.
There was previously one uranium showing on the property as listed in the Newfoundland Mineral Deposit
Index inventory with a rock sample assaying at 2,180 ppm U3O8 (refer Prospectus dated 30 November
2023).
Subsequent to the Quarter, Infini expanded the Portland Creek Project footprint by an additional 10,250
hectares through the staking of 410 new mineral claims, further consolidating the Company’s strategic
control across one of Canada’s most prospective emerging uranium districts. The Company’s combined
footprint at Portland Creek now covers an area of 251km2.
Since listing, the Company has defined a high-grade uranium in soil anomaly at the Falls Lake prospect
measuring ~800m x 100m with a peak result of 74,997 ppm U3O8 (Trident Lake Zone). In addition, Infini
identified a cluster of anomalous soil samples, with a peak value of 1,500 ppm U3O8 lying 1.5km further
south of the Falls Lake prospect (ASX:I88 Announcements 1 July 2024, 10 July 2024 & 14 October 2024)
(Falls Lake Prospect). Fault structures associated with these soil anomalies will be a focus of further
exploration activities.
Commencement of Phase 2 Diamond Drilling Program at Flagship Portland Creek
project
During the Quarter, the Company advanced exploration activities at its flagship Portland Creek Uranium
Project in Newfoundland, Canada, marking the transition from modelling and target generation to active
diamond drilling.
Building on the successful Phase 1 campaign, which confirmed the project’s prospectivity for a shear-
hosted uranium system, Infini completed an extensive review and refinement of the exploration model in
collaboration with structural geology and uranium specialists. This work indicated that the major uranium-
in-soil anomalies across the 6 km-long Trident Lake Zone, including a peak value of 74,997 ppm (~7.5%)
U₃O₈, are closely associated with east–west fault systems interpreted to potentially host primary uranium
mineralisation in hydrothermal veins.
The refined model identified twelve high-priority target areas defined by favourable east–west and
northeast-southwest fault structures, radiometric highs, radon gas anomalies, uranium-in-lake sediments
and widespread hydrothermal alteration. These targets form the basis of a flexible Phase 2 diamond
drilling program, initially designed for a minimum 2,500 metres of drilling with the ability to expand based
on results.
In preparation for the program, Rodren Drilling Ltd was appointed as the primary drill contractor and Coast
Mountain Geological Ltd engaged for geological supervision, core logging and reporting. Field teams
mobilised to site in September 2025 to complete additional structural mapping and rock-chip sampling to
refine drill collar locations and support agile, data-driven targeting.
Phase 2 drilling commenced in September 2025, following mobilisation of the drill rig, helicopter and
geological teams to site. The program will test up to twelve priority targets within a >6 km corridor of
uranium-in-soil anomalies, with each drillhole oriented to intersect the prospective targets in search of
potential primary uranium mineralisation.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
3
Figure 1: Overview of refined Portland Creek exploration targets areas relative to sample geochemistry and
target fault structures. Of interest are the East-West faults that are untested and interpreted as shallow, near
vertical and outcropping in the bluff face.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
4
Reynolds Lake, Reitenbach Lake and Boulding Lake Uranium Projects (100% owned,
Saskatchewan Canada)
The Reynolds Lake, Reitenbach Lake and Boulding Lake Projects comprise a total landholding of 931km2,
located within and adjacent to the world-class Athabasca Basin, the world's richest source of high-grade
uranium. Spanning approximately 100,000km2, the Athabasca Basin is host to some of the most prolific
uranium deposits, including the Cigar Lake and McArthur River mines.
The contiguous Reynolds Lake and Reitenbach Lake Uranium Projects comprise a combined 677km2
landholding and contain reported anomalous uranium in lake sediments and radiometric anomalies in
proximity to the underexplored Needle Falls shear zone. Boulding Lake is a 254km2 property directly
adjacent to claims containing a large number of radioactive boulders, with the potential for a primary
uranium source within the project area.
Infini completed 100% acquisition of the three highly prospective properties in March 2025.
Figure 2: Location of the Reynolds Lake Uranium Project and Reitenbach Uranium Project relative to the
world-renowned Athabasca Basin, synonymous with high-grade uranium deposits, and in close proximity to
existing operations, access and infrastructure.
Reynolds Lake and Reitenbach Lake Field Programs
During the Quarter, the Company advanced exploration across the Reynolds Lake and Reitenbach Lake
Uranium Projects, situated in the Athabasca region.
At Reynolds Lake, Infini completed interpretation of the airborne time-domain electromagnetic (TDEM)
survey, identifying multiple large-scale bedrock conductors, the largest exceeding 10 km in length,
coincident with radiometric anomalies and magnetic lows. These features are indicative of potential
shallow, unconformity-style uranium mineralisation on the outboard edge of the Athabasca Basin.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
5
A comprehensive desktop study integrating geophysical, radiometric and geochemical datasets defined
14 high-priority target areas across the project, coinciding with shear zones and cross-cutting N–S
trending faults interpreted to be key structural controls for potential uranium mineralisation.
In September, Infini commenced its maiden field program at Reynolds Lake, consisting of soil and rock-
chip sampling and geological mapping. The program was designed to advance these priority targets
toward drill-ready status for a potential maiden drill campaign in 2026.
Following the completion of the first modern airborne TDEM survey over the adjoining Reitenbach Lake
Uranium Project, the Company proceeded to expand the ongoing field program at Reynolds Lake to
include the Reitenbach Lake project. The Reitenbach Lake EM survey, covering 456-line km, identified
multiple parallel bedrock conductors greater than 10 km long, coincident with radiometric anomalies and
uranium-in-lake sediments —suggesting the potential for shallow, shear-hosted uranium systems.
As part of the expanded field program, geological mapping and sampling were conducted across both
projects. At Reynolds Lake, 690 soil samples and 124 rock samples were collected, with 59 locations
recording scintillometer readings exceeding 1,000 cps1, up to a maximum of 9,700 cps1, from radioactive
boulders and exposed bedrock.
Figure 3: Reynolds Lake magnetic image overlaid with interpreted structures, lake sediment geochemistry,
radiometric anomalism and EM targets. Note coincidence of EM targets with interpreted shears, N-S faults
and radiometric anomalism.
Cautionary Statement: In relation to handheld scintillometer readings, the Company cautions that
measurements of radioactivity from scintillometer readings are preliminary in nature and should not be
considered a proxy or substitute for quantitative analysis of a laboratory assay result. While scintillometers
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
6
confirm the presence of radioactivity, it does not accurately determine elemental uranium concentrations
and can also be influenced by the presence of thorium and potassium.
At Reitenbach Lake, preliminary fieldwork confirmed multiple shallow EM conductors coincident with
radiometric anomalies and shear zones, consistent with structural and lithological settings known to host
significant uranium deposits elsewhere in the Athabasca Basin. 169 soil samples and 33 rock samples
were collected, with scintillometer readings of up to 67,540 cps1. This highly anomalous scintillometer
reading of 67,540 cps1 coincided with the finding of a uraninite showing at Reitenbach Lake, a newly
identified outcrop where visible uraninite has been identified at surface.
All samples from the expanded field programs at Reynolds Lake and Reitenbach Lake have been
dispatched to ALS Laboratories for assay, with results expected in Q4 CY2025.
Figure 4: Overview of priority target area of Reitenbach Lake field program relative to significant EM
anomalism, interpreted structures, radiometric anomalism and lake sediment geochemistry. Note
coincidence of EM targets with interpreted shears, N-S faults and radiometric anomalism.
At Boulding Lake, preparatory data compilation continued during the Quarter, including integration of the
results from Infini’s earlier 1,300-line km airborne magnetic survey and geophysical interpretation of
regional conductors extending into the project area. The Boulding Lake property remains a strategic
component of Infini’s Athabasca Basin exploration portfolio, located within 100 km of Cameco’s high-
grade McArthur River and Eagle Point operations.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
7
Des Herbiers Uranium Deposit (100% owned, Québec Canada)
The Des Herbiers Uranium Project consists of 66 non-contiguous claims totaling 36.25 km2. It is located
within the Des Herbiers township, approximately 9km NW of the Baie-Johan-Beetz municipality and 52km
ENE of the municipality of Havre St-Pierre on the Gulf of St. Lawrence in Quebec, Canada. The Project
is situated in the Grenville Province of the Canadian Shield. The rocks underlying the immediate area are
comprised of biotite rich granitic rocks, quartzites and quartzo-feldspathic gneisses that are derived from
strongly metamorphosed sandstones and arkoses, amphibole rich gabbros and gneisses. Regional
structures trend north to northwest and display large-scale curvilinear folding. Historical exploration and
drilling have revealed an abundance of low grade, near surface, bulk tonnage uranium that contains a
combined JORC compliant inferred mineral resource of 162Mt @ 123ppm U3O8
3.
With the Company focusing its working capital on the Portland Creek Project and ongoing field works at
the Reynolds and Reitenbach Lake Projects, limited exploration activities were undertaken during the
reporting period.
Figure 7: The Des Herbiers Uranium Project in plan view depicting anomalous radiometrics (U2
/Th), historical drilling and
trench channel sampling. Note the several large target areas that have never been drill tested.
Bellah Bore East Uranium Deposit (100% owned, Western Australia)
The Bellah Bore East deposit is approximately 500m x 150m in size and located within prospecting license
P 53/1703, comprising 92.67 hectares. The licence is situated within the western edge of the Company’s
already existing E 53/2188 tenement ~60km southwest of Wiluna. The deposit is hosted by calcrete and
comprises a historical inferred mineral resource in accordance with the JORC Code (2004) (it is noted
that these exploration results reported under the JORC 2004 code may not conform to the requirements
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
8
of the JORC Code 2012). Mineralisation is reported as open in the northeast. Carnotite is identified as
the primary ore mineral in historical drilling.
With the Company focusing its working capital on the Portland Creek Project and ongoing field works at
the Reynolds and Reitenbach Lake Projects, the Company did not complete any new work on the Bellah
Bore East deposit during the reporting period.
Yeelirrie North Uranium Project (100% owned, Western Australia)
The Yeelirrie North Project currently consists of exploration licence E53/2188, E53/2368 and prospecting
licence P53/1703, covering an area of ~329km², located approximately 70km southwest of Wiluna,
Western Australia. The Company received confirmation during the quarter that the application for one of
the four exploration licences (E53/2368) was granted on 9 September 2025. If successfully granted, the
remaining new exploration licence applications will see the Company’s Project size increase to a total
area of ~746km2. The Yeelirrie Project is located near the northern extremity of the Archaean Norseman
Wiluna greenstone belt of the Yilgarn Craton. The project is highly prospective for hosting high-grade
uranium mineralised calcrete and lies within the same geological domain as the world class Yeelirrie
Uranium Deposit hosting 128.1Mlb U3O8 at an average ore grade of 1500 ppm U3O8.
The Company is continuing to progress its access and Aboriginal heritage agreements in relation to the
previous licence applications.
Figure 8: Location of the newly staked exploration licences (highlighted red) at the world-class Yeelirrie uranium camp
showing the geological rationale with extensive and coincidental uranium-thorium anomalism identified in regional
radiometrics.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
9
Tinco Uranium-Niobium Project (75% Tinco North, 100% Tinco South, Saskatchewan
Canada)
The Tinco Uranium-Niobium Project lies to the south-southwest of the Athabasca Basin. It is underlain
by the Mudjatik Domain which is composed mainly of granitoid felsic gneisses of probable Archean age,
which are considered basement to narrow, arcuate to closed belts of supracrustal rocks of sedimentary
and volcanic origins. Two types of uranium mineralisation have been recognised in the area - occurrences
in remobilised basement and occurrences in supracrustal. Previous geological mapping has identified
lenses of radioactive pegmatite up to 1.5 m in width. Historical outcropping grab samples on the property
grade up to 600ppm U3O8 and 0.5% Nb.
Figure 9: The magnetic imagery results of the Tinco survey. Note the location and coincidence of the mineralized grab
sample with a major new interpreted shear zone corridor measuring 6km x ~1.5km.
In Q3 FY2025 a heliborne magnetic, radiometric and time-domain electromagnetic survey was completed
covering both claims. The survey was flown along a west-northwest orientation with lines spaced 100m
apart. The total survey comprised of 1030-line kms, flown at an average height of 36 m. Southern
Geoscience Consultants processed the data to produce a set of filtered images. These images were
interpreted to delineate magnetic and radiometric trends, classification of structures, lineaments, faults
and folds, delineation and interpretation of stratigraphic relationships including contacts, and to produce
a set of targets
The survey results indicate that high-resolution magnetic imagery has identified the presence of a major
north-south trending shear zone that contains the historical mineralized grab sample of 600ppm U3O8,
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
10
0.5% Nb (ASX:I88 Announcement 25 February 2025). This provides the Company with a large U-Nb
target for future exploration activities. In addition, there are several large ovoid magnetic features of
interest in the centre of the claims which are an additional area of interest that may be followed up with
surface geochemical surveys.
The Company did not complete any new work on the Tinco Uranium-Niobium Project during the reporting
period.
Paterson Lake Lithium Project (100% owned, Ontario Canada)
The Paterson Lake Project is located within the highly prospective Archean Separation Lake Greenstone
Belt of the Superior Province of Ontario, Canada. The Project has been documented to contain abundant
rare-metal bearing pegmatites including seven named petalite bearing pegmatites and up to 50 unnamed
pegmatites that require investigation. Historical outcrop grab sample results include results up to 4.43%
Li2O and the best reported historical drill intercept to date of 8m @ 3.12% Li2O. The Separation Rapids
Lithium Deposit of Avalon Advanced Materials/Sibelco joint venture is located within 2km of the project
boundary.
Figure 10: Location of the Paterson Lake Lithium Project depicting the microgravity survey locations overlain with 1VD
drone magnetics, MMI soil sampling, mineralised outcropping pegmatites and historical drillhole mineralisation.
The Company did not complete any new work on the Paterson Lake project during the reporting period.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
11
Valor Lithium Project (50% owned, earn-in up to 100%, Québec Canada)
The Valor Project covers an area of approximately 125km² in southwest Québec, approximately 40km
north-west of Val-d’Or. The project is situated on the Archean Preissac Lacorne batholith, a syn-to post-
tectonic intrusion that was emplaced in the Southern Volcanic Zone of the Abitibi Greenstone Belt of the
Superior Province of Québec. To the north the batholith is bounded by the Manneville Fault and to the
south by the Cadillac Fault and the eastward extension of the Porcupine Destor Fault. The batholith,
which is a composite body has associated pegmatites and quartz veins. After completing soil sampling
activities, the company has now identified several large scale LCT MMI geochemical anomalies.
The Company did not complete any new work on the Valor Lithium project during the reporting period.
Figure 11: Location of the Valor lithium project overlain with regional magnetics and historical mineral occurrences.
Parna Lithium Project (100% owned, Western Australia)
The Parna Lithium Project comprised two exploration licences (E63/2183 and E63/2184), covering 48
blocks (~146km²) within the Southern Cross Domain of the Youanmi Terrane. Following a review of
exploration results and the Company’s strategic focus on uranium assets in Canada, Infini elected to
relinquish the Parna Project during the September 2025 quarter. No further exploration work was
undertaken during the reporting period.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
12
Pegasus Lithium Project (100% owned, Western Australia)
The Pegasus Lithium Project consists of one granted exploration licence (E74/715) which covers an area
of 40 Blocks (~121km²) located approximately 15km southeast of Ravensthorpe in the Esperance region
of Western Australia. The project is considered prospective for hard-rock lithium-tantalum mineralisation
based primarily on geological and structural analogues drawn from Allkem Limited’s Mt Cattlin lithium
deposit located approximately 10km to the east.
Figure 12: Location of the Pegasus lithium project overlain with regional magnetics.
Two priority lithium targets have been identified from a previously conducted 278-sample program
measuring 1.4 km2 and 1.8 km2 with peak Li values of 129ppm and 86ppm, respectively (ASX:I88
Announcement 30 January 2025).
The Company did not complete any new work on the Pegasus Lithium Project during the reporting period.
Schedule of Mining Tenements
The Company’s tenement and claim schedule is provided in Appendix 1.
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
13
Corporate Activities
Board Changes
During the quarter, the Company announced a number of changes to its Board. Mr Faheem Ahmed was
appointed as a Non-Executive Director, effective 30 September 2025. Mr Ahmed brings over a decade
of experience in mining, project financing, mergers and acquisitions, and asset management, and
currently serves as Chief Executive Officer of Altair Minerals Limited (ASX: ALR) and Non-Executive
Director of Viridis Mining & Minerals Limited (ASX: VMM).
The Company also advised that Mr Robert Martin resigned as Chairman and Non-Executive Director,
effective 30 September 2025, to pursue other professional opportunities. Dr David Pevcic transitioned
from Executive Director to Non-Executive Chairman following Mr Martin’s departure. The Board
acknowledges and thanks Mr Martin for his valuable contribution during his tenure and welcomes Mr
Ahmed to the Board.
Annual General Meeting
The Annual General Meeting of the Company will be held on Wednesday, 26 November 2025. Further
information about the Annual General Meeting, including accessing the Notice of Meeting and
Explanatory Memorandum is available on the ASX Company’s Announcements Platform and the
Company’s website.
Loyalty Options Details
The Company has confirmed its intention to undertake a loyalty offer to eligible shareholders of 1 loyalty
option (“Loyalty Option”) for every 4 Infini shares held at 5:00pm (AWST) on Friday, 7 November 2025,
at an issue price of $0.02 per Loyalty Option (“Offer”). Each Loyalty Option is convertible into one (1)
fully paid ordinary share in the Company, exercisable at $0.27 per Loyalty Option with an expiry
date on Monday, 30 September 2028.
Subject to the quotation requirements of the ASX Listing Rules, the Company will apply for Official
Quotation for all of the Loyalty Options. The indicative timetable for the Offer is set in the Company’s
announcement of 23 October 2025.
Finance
During the quarter the Company announced it had executed a subscription and renunciation agreement
with Peartree Securities Inc. to raise approximately AUD$3.04 million (before costs) through the issue of
14.8 million fully paid ordinary shares in the Company utilising the “Flow-Through Shares” provisions
under Canadian tax law at an issue price of C$0.1774 (A$0.2052) per share. The Flow-Through Shares
were issued at a premium to market pursuant to the Canadian flow-through shares regime, representing
a:
• 52.8% premium to the 5-day volume weighted average price (VWAP) of A$0.13429;.
• 68.9% premium to the 15-day VWAP of A$0.12148; and
• 20.7% premium to the last closing price of A$0.17 on 31 July 2025.
The offer for Flow-Through Shares was facilitated by Canadian flow-through share dealer, Peartree,
pursuant to a subscription and renunciation agreement with the Company, and a block trade agreement
facilitated by Bell Potter Securities Ltd and 62 Capital Pty Ltd who acted as Joint Lead Managers for the
block trade. Funds raised from this placement are being deployed for the Phase 2 drilling campaign at
Portland Creek as well as the maiden field programs held at Reynolds and Reitenbach Lake Uranium
Projects.
In addition to the Flow-Through Placement, the Company’s Directors and Management subscribed for
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
14
A$200,000 in I88 shares at the same issue price of the block trade $0.135, as approved by shareholders
in Infini’s EGM. These funds were used to meet the costs of the offers and general working capital.
The Appendix 5B quarterly cashflow report for the quarter ended 30 September 2025 is submitted
separately.
The Group closed the Quarter with a cash balance of $2,611k. Exploration expenditure during the quarter
totaled $1,159k (unaudited).
During the Quarter the Company received a tenement bond refund of circa C$315k from the government
of Saskatchewan in relation to the Reynolds and Boulding project acquired in February 2025.
Expenditure
In accordance with Listing Rule 5.3.4, Table 1 below compares the Company’s actual expenditure to 30
September 2025 in comparison with the estimated expenditure outlined in the ‘Use of Funds’ statement
included in the Prospectus.
Table 1: Use of funds comparison
Prospectus Current Quarter Total
Exploration & Development
(including cash consideration)
2,484,0001
773,942 7,436,589
Lead Manager & Cost of Offer 638,0002
- 753,192
Corporate Administration 960,000 440,940 3,090,969
Working Capital 1,218,000 39,499 1,439,083
Government Grants - - (167,616)
Total 5,300,000 1,254,381 12,552,217
1 Cash Consideration $248k, Exploration & Development $2.236m
2 Lead Manager Fee $318k, Cost of Offer $320k
Exploration and Development
Exploration and development costs for the Quarter have been accelerated at the Portland Creek Project
with the commencement of the second drilling campaign and also at Reynolds Lake and Reitenbach Lake
Projects with the commencement of the inaugural field program.
Corporate Administration
Corporate and administrative costs for the quarter include costs relating to the Canadian Flow Through
Raise in August 2025.
Working Capital
Working capital costs include the field work program at Reynolds Lake and Reitenbach Lake offset by
the refund of the tenement bond for the Saskatchewan projects.
Payments to Related Parties
Pursuant to section 6 of the Company Appendix 5B, and as required under ASX Listing Rule 5.3.5, during
the Quarter the Company paid $55k to the Directors for remuneration
Capital Structure
The Capital Structure at the end of the Quarter is as follows:
Quarterly Activities Report For Period Ending
30 September 2025
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources
15
Table 2: Capital Structure as at 30 September 2025
Securities Number
Shares 89,858,749
Options 10,166,666
Performance Rights 2,211,189
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@in
Share your feedback
Discover