I88 Expands Reitenbach Lake Uranium Project Footprint by 31%
Released
Released
Announcement PDF
ASX Announcement
Released 12 January 2026
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 1
Infini Expands Reitenbach Lake Uranium
Project Footprint by 31%
Reitenbach Lake project footprint expanded by over 8,900 ha, lifting Infini’s
total landholding in and adjacent to the Athabasca Basin to over 102,000 ha.
Newly staked ground is adjacent to the 1.9% U3O8 Titus Prospect1
and contiguous
with the existing Reitenbach Lake tenements, consolidating control over a highly
prospective exploration corridor within the Needle Falls Shear Zone.
The new tenements are located along the structural corridor and strike of
electromagnetic conductors, radiometric anomalies and interpreted key geological
structures identified by previous work programs, accentuating potential geological
continuity and scale potential.
Phase 2 rock chip assay results from Reynolds Lake and Reitenbach Lake are
expected imminently, ahead of final targeting and drill planning for an expected
inaugural drill program in Q2 CY2026.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to announce that it has
staked three additional mineral claims contiguous with its existing Reitenbach Lake Uranium Project in
northern Saskatchewan, Canada.
The newly staked tenements comprise MC00023249 (3,113 hectares), MC00023250 (3,117 hectares)
and MC00023251 (2,688 hectares) and materially expand Infini’s landholding over a rapidly emerging
uranium exploration corridor. The Company’s land position at Reitenbach Lake has now increased by
approximately 31%, bringing the total project footprint to 380 km2 and increasing Infini’s overall footprint
in and adjacent to the Athabasca Basin to 1,021 km2.
Importantly, preliminary review of the Company’s 2025 work program data (including a recently flown
Xcite airborne electromagnetic (EM), radiometric and magnetic survey conducted by the Company)(refer
to ASX Announcements 22 September and 2 October 2025) indicates that priority EM conductors,
radiometric anomalies and geological structures identified within Infini’s existing Reitenbach Lake
tenements may extend into the newly acquired ground, reinforcing the geological continuity of the system
and enhancing the scale potential of the project.
The expanded landholding provides Infini with greater flexibility to advance exploration across a broader,
coherent target area and enhances the Company’s ability to prioritise and test multiple high-quality targets
as it progresses toward a planned drill program in Q2 CY2026.
Infini’s Chief Executive Officer, Rohan Bone, said: "Expanding our footprint at Reitenbach Lake is a
strategic step that strengthens Infini’s position over an emerging highly prospective exploration corridor.
Securing ground adjacent to the Titus Prospect that captures interpreted extensions of key EM
conductors, radiometric anomalies and key geological structures materially enhances the scale potential
of the project. With a consolidated land package and drilling planned for 2026, Reitenbach Lake is shaping
up as a cornerstone asset within our Athabasca Basin project portfolio”.
1
Refer to ASX announcement 23 December 2025, High-Grade Uraninite Confirmed at Reitenbach Lake – Phase 1 Assay Results
Received.
Infini Expands Reitenbach Lake Uranium Project Footprint by 31%
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 2
Next Steps
Infini is now seeking to acquire and consolidate all available datasets across the newly staked tenements.
Following receipt of Phase 2 field sampling assay results, drill-ready targets will be finalised and prioritised
across the Reynolds Lake and Reitenbach Lake projects. Key upcoming milestones include:
Receival of Phase 2 rock chip assay results, expected imminently.
Target refinement and drill planning integrating structural, geophysical and geochemical
datasets, expected in Q1 CY2026.
Commencement of a maiden drill campaign across priority targets at Reynolds and Reitenbach
Lake projects, subject to permitting and stakeholder engagement, targeted for Q2 CY2026.
Ongoing engagement with local First Nations, including Ya’thi Néné Lands and Resources
(YNLR), alongside government permitting processes, progressing in parallel to support drilling
activities.
Figure 1: Infini’s footprint at the Reitenbach Lake Uranium Project strategically increased by 31% to a total
over 380 km2. When combined with Infini’s Reynolds Lake and Boulding Lake projects, Infini now holds a
dominant exploration footprint of 1,021 km2 in and adjacent to the Athabasca Basin.
Infini Expands Reitenbach Lake Uranium Project Footprint by 31%
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 3
References
1. ASX announcement 23 December 2025, High-Grade Uraninite Confirmed at Reitenbach Lake –
Phase 1 Assay Results Received.
2. ASX announcement 2 October 2025 and 22 September 2025, Amendment to ASX Announcement;
Reynolds Lake Field Program Expanded to Target New EM Anomalies.
[END]
Release authorised by the Board of Infini Resources Ltd.
Contacts
Rohan Bone
Chief Executive Officer
E: info@infiniresources.com.au
Infini Expands Reitenbach Lake Uranium Project Footprint by 31%
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 4
About Reynolds Lake & Reitenbach Lake
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 22 mineral claims
covering a total footprint of 766 km² on the eastern outboard margin of the Athabasca Basin in northern
Saskatchewan. The projects are contiguous, with Reynolds Lake consisting of 12 claims (386 km²) and
Reitenbach Lake consisting of 10 claims (381 km²) adjoining its northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are
bisected by the crustal-scale Needle Falls Shear Zone, a major structural corridor separating the
Wollaston Domain to the west from the Peter Lake Domain to the east. The Wollaston Domain is
dominated by Paleoproterozoic siliciclastic metasediments including paragneiss, quartzite, and calc-
silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic granitoid gneisses and
supracrustal rocks. Both domains are strongly deformed and metamorphosed, with northeast-trending
isoclinal folding and later cross-cutting north–south fault systems that provide structural complexity and
potential pathways for hydrothermal fluid flow.
Graphitic schists and gneisses, key lithologies known to host unconformity-associated uranium
mineralisation, have been identified within the project area and are spatially associated with
electromagnetic conductors, radiometric anomalies and elevated uranium-in-lake sediment samples.
Recent exploration has confirmed primary uranium mineralisation at surface at Reitenbach Lake, while
petrographic analysis has validated a structurally prepared and hydrothermally altered basement
environment consistent with an unconformity-related uranium system.
Regionally, the geological setting is considered analogous to uranium systems at Eagle Point and Rabbit
Lake, where mineralisation occurs along graphitic shear zones at the boundary between Wollaston
metasediments and granitoid basement.
Figure 2: Location of the Reynolds Lake Uranium Project and Reitenbach Uranium Project relative to the
world-renowned Athabasca Basin, synonymous with high-grade uranium deposits, and in close proximity to
existing operations, access and infrastructure.
Infini Expands Reitenbach Lake Uranium Project Footprint by 31%
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 5
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for
uranium and lithium. The company has a diversified and highly prospective portfolio of assets that includes greenfield and more
advanced brownfield projects. The company’s mission is to increase shareholder wealth through exploration growth and mine
development.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 3: Overview of Infini's portfolio of projects and global footprint.
Compliance Statement
This announcement contains information on the Reynolds Lake Uranium Project and the Reitenbach Lake Uranium Project
extracted from ASX market announcements dated 25 February 2025, 31 March 2025, 24 July 2025, 20 August 2025, 9 September
2025, 22 September 2025, 2 October 2025, 3 October 2025, 26 November 2025 and 23 December 2025 and reported in accordance
with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The original market announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The
Company is not aware of any new information or data that materially affects the information included in the original market
announcement.
This announcement contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s
Prospectus dated 30 November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in
accordance with the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The Company confirms that it is not aware of any new information or data that materially affects the
information included in any original announcement and that all material assumptions and technical parameters underpinning the
estimates in the original market announcement continue to apply and have not materially changed. The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward looking statements/projections
are estimates for discussion purposes only and should not be relied upon. Forward looking statements/projections are inherently
uncertain and may therefore differ materially from results ultimately achieved. Infini Resources Limited does not make any
representations and provides no warranties concerning the accuracy of the projections and disclaims any obligation to update or
revise any forward-looking statements/projects based on new information, future events or otherwise except to the extent required
by applicable laws. While the information contained in this report has been prepared in good faith, neither Infini Resources Limited
or any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement.
Infini Expands Reitenbach Lake Uranium Project Footprint by 31%
Infini Resources Limited ABN 77 656 098 583 www.infiniresources.com.au
InfiniResources 6
Appendix 1: Overview of Infini’s expanded footprint in the Athabasca Basin
Table 1: Overview of Infini’s tenements staked at the Boulding, Reynolds and Reitenbach Lake Projects.
Licence ID Project Hectares
MC00016454 Boulding Lake 2,073
MC00016455 Boulding Lake 3,328
MC00016456 Boulding Lake 2,025
MC00016457 Boulding Lake 2,690
MC00016458 Boulding Lake 3,399
MC00016459 Boulding Lake 2,939
MC00016460 Boulding Lake 3,862
MC00016461 Boulding Lake 2,853
MC00016462 Boulding Lake 2,273
MC00016423 Reynolds Lake 3,265
MC00016424 Reynolds Lake 3,754
MC00016425 Reynolds Lake 2,492
MC00016426 Reynolds Lake 3,774
MC00016427 Reynolds Lake 3,714
MC00016428 Reynolds Lake 3,306
MC00016429 Reynolds Lake 3,117
MC00016430 Reynolds Lake 2,984
MC00016431 Reynolds Lake 3,289
MC00016432 Reynolds Lake 3,082
MC00016433 Reynolds Lake 3,071
MC00016434 Reynolds Lake 2,711
MC00018042 Reitenbach Lake 4,103
MC00018043 Reitenbach Lake 4,388
MC00018044 Reitenbach Lake 4,170
MC00018045 Reitenbach Lake 3,689
MC00018046 Reitenbach Lake 4,190
MC00018047 Reitenbach Lake 4,419
MC00018048 Reitenbach Lake 4,184
MC00023249 Reitenbach Lake 3,113
MC00023250 Reitenbach Lake 3,117
MC00023251 Reitenbach Lake 2,688
Total -- 102,060
Share your feedback
Discover