Reynolds & Reitenbach Lake Maiden Drill Targets Finalised
Released
Released
Announcement PDF
ASX Announcement
Released 31 March 2026
ASX:I88
Maiden Drill Targets Finalised for Reynolds &
Reitenbach Lake Uranium Projects
► Maiden diamond drilling program (minimum 2,500m) to systematically test high-priority uranium targets
at the Reynolds & Reitenbach Lake Uranium Projects, with mobilisation scheduled for mid-April 2026.
► Program follows the discovery of high-grade uranium mineralisation at the Titus Prospect, with rock chip
samples returning assays up to 1.90% U₃O₈ along a priority EM conductor.
► Drilling will focus on the confluence of multiple datasets, including EM conductors, magnetic features,
uranium geochemical anomalism, and interpreted structural corridors, refined through Infini’s 2025
exploration programs.
► Datasets define a large, system-scale footprint prospective for hosting uranium mineralisation, which
includes ~80 km of EM conductors and a continuous ~15 km × 3 km prospective corridor adjacent to the
Titus Prospect.
► Program represents the first drill testing of this underexplored area on the eastern margin of the
Athabasca Basin, considered highly prospective for both unconformity-related and basement-hosted
uranium systems.
To learn more about this announcement and watch a video update from our CEO, Rohan Bone, click here.
Infini Resources Limited (ASX:I88) (“Infini” or the “Company”) is pleased to announce the completion of targeting and
drillhole planning for its maiden drilling campaign at the Reynolds Lake and Reitenbach Lake Uranium Projects, marking a
key milestone ahead of planned drilling in Q2 CY2026.
Reynolds Lake and Reitenbach Lake Exploration Model
A detailed review and integration of structural, geochemical and geophysical datasets from the Phase 1 and Phase 2 field
programs at Reynolds Lake and Reitenbach Lake has been undertaken to refine the Company’s exploration model and
generate well-constrained, high-confidence drill targets for the maiden drilling campaign at Reynolds and Reitenbach Lake.
This work incorporates interpretation of airborne TDEM and magnetic surveys flown in 2025, alongside mapping,
prospecting and soil geochemistry, to better constrain the spatial relationship between uranium anomalism and key
geological controls. Soil sampling (773 samples across two grids) defines coherent uranium anomalies down-ice of the
interpreted structural corridor, providing additional support for the positioning of priority drill targets.
Specialist input from uranium exploration experts has focused on defining the architecture of major shear zones and
conductive corridors, understanding fluid pathways and assessing the controls on potential uranium mineralisation across
both projects. This process has identified multiple zones where uranium anomalism coincides with EM conductors, magnetic
lows, radiometric responses and structural complexity, supporting a coherent, system-scale exploration model prospective
for basement-hosted uranium mineralisation. The presence of high-grade uranium at the Titus Prospect (1.90% U₃O₈
sample K668386), located along a priority EM conductor and structural corridor, provides further support for the model and
validates the targeting approach.
Infini’s Strategic Technical Advisor, Andy Yackulic, said: “The high-grade samples recovered from Titus in 2025
underscore the projects’ potential to host significant uranium mineralisation. By integrating our latest field data with regional
insights, we have refined a precise drilling strategy to test the conductive corridor at Reynolds and Reitenbach Lake. Our
focus now shifts to testing high-priority targets within structurally complex zones that we believe are prime for basement-
hosted mineralisation similar to the Eagle Point deposits.”
Maiden Drill Targets Finalised for Reynolds & Reitenbach Lake Uranium
Projects
ASX:I88
Figure 1: Overview of the Reynolds and Reitenbach Lake Uranium Projects highlighting the confluence of interpreted airborne
EM conductors, major structural architecture and surface geochemical anomalism, overlain on a 1VD magnetic image.
Maiden Drill Targets Finalised for Reynolds & Reitenbach Lake Uranium
Projects
ASX:I88
Drillhole Targeting and Planning
Drill targets at the Reynolds Lake and Reitenbach Lake Uranium Projects have been defined through a systematic
integration of multiple datasets, including airborne electromagnetic (EM) surveys, magnetic data, surface geochemistry and
detailed structural interpretation.
Targeting has focused on areas where multiple mineralisation vectors coincide, specifically:
• Variable stacked and single EM conductors, interpreted to represent graphitic or sulphide-rich horizons acting as
reductants.
• Magnetic lows, indicative of meta sedimentary units and/or alteration, also highlighting structurally disrupted
basement rocks at depth.
• Elevated uranium geochemistry, including rock chip and soil anomalies.
• Structural complexity, including major shear zones, fault intersections and deformation corridors.
These datasets collectively define a coherent, system-scale potential for uranium mineralisation, including approximately
80 km of EM conductors across the broader project area and a continuous ~15 km x 3 km prospective corridor in the vicinity
of the Titus Prospect, reinforcing the scale and prospectivity of the Reynolds Lake and Reitenbach Lake projects.
A minimum 2,500m diamond drilling program comprising approximately 12-16 drillholes has been designed to
systematically test these priority targets, with an average planned hole depth of ~220m. The program is structured to
efficiently evaluate key target areas, with flexibility to adjust hole locations and follow-up drilling based on ongoing results
confirmed in the core logging or gamma probe results.
Infini’s Chief Executive Officer, Rohan Bone, said: "Finalising drill targets for our maiden drilling campaign at Reynolds
and Reitenbach marks a major milestone for the Company. The integration of geophysics, geochemistry and structural
interpretation has defined a number of compelling, high-priority targets across a large, prospective uranium system.
The presence of high-grade uranium at surface at the Titus Prospect, combined with the scale of the EM conductor network
and associated alteration footprint, provides strong encouragement that we are vectoring into a potentially significant
mineralised system.
With key contractors appointed and drill planning now complete, we are well positioned to commence our maiden drill
campaign in Q2 CY2026 and test the potential of this highly prospective landholding on the eastern margin of the Athabasca
Basin.”
Maiden Drill Targets Finalised for Reynolds & Reitenbach Lake Uranium
Projects
ASX:I88
Figure 2: Indicative drillhole locations for the maiden diamond drilling program at Reynolds and Reitenbach Lake, targeting
priority EM anomalies where magnetic features, structural complexity and uranium geochemical anomalism coincide.
Maiden Drill Targets Finalised for Reynolds & Reitenbach Lake Uranium
Projects
ASX:I88
Next Steps
With drill targeting now complete, Infini is advancing toward execution of its maiden drilling campaign at Reynolds Lake and
Reitenbach Lake Projects. Key upcoming activities include:
• Ongoing engagement with First Nations, including Ya’thi Néné Lands and Resources (YNLR), to support permitting
and ensure alignment with planned exploration activities;
• Completion of permitting and regulatory approvals to support the commencement of drilling activities;
• Mobilisation of Archer Cathro (geological services) and Rodren Drilling (drilling contractor) to Reynolds Lake and
Reitenbach Lake; and,
• Commencement of a minimum ~2,500m diamond drilling program across the well-defined drill targets.
The drilling program is scheduled to commence in Q2 CY2026 and represents the first drill testing of this underexplored
area on the eastern margin of the Athabasca Basin, which is considered highly prospective for both unconformity-related
and basement-hosted uranium systems.
[END]
This announcement has been approved for release by the Board of Directors of Infini Resources Ltd.
To receive alerts for ASX announcements and updates, or to engage with Infini Resources
directly by asking questions, watching video summaries and seeing what other shareholders
have to say about this, as well as past announcements, please visit
https://infiniresources.com.au or contact us directly at:
Infini Resources Limited
ABN 77 656 098 583
E: info@infiniresources.com.au
T: +61 (08) 9465 1051
Maiden Drill Targets Finalised for Reynolds & Reitenbach Lake Uranium
Projects
ASX:I88
About Reynolds Lake & Reitenbach Lake
The Reynolds Lake and Reitenbach Lake Uranium Projects collectively comprise 22 mineral claims covering a total footprint
of 766 km² on the eastern outboard margin of the Athabasca Basin in northern Saskatchewan. The projects are contiguous,
with Reynolds Lake consisting of 12 claims (386 km²) and Reitenbach Lake consisting of 10 claims (381 km²) adjoining its
northern boundary.
The properties are underlain by Archean to Paleoproterozoic metamorphic and igneous rocks and are bisected by the
crustal-scale Needle Falls Shear Zone, a major structural corridor separating the Wollaston Domain to the west from the
Peter Lake Domain to the east. The Wollaston Domain is dominated by Paleoproterozoic siliciclastic metasediments
including paragneiss, quartzite, and calc-silicate units, while the Peter Lake Domain contains Archean to Paleoproterozoic
granitoid gneisses and supracrustal rocks. Both domains are strongly deformed and metamorphosed, with northeast-
trending isoclinal folding and later cross-cutting north–south fault systems that provide structural complexity and potential
pathways for hydrothermal fluid flow.
Graphitic schists and gneisses, key lithologies known to host unconformity-associated uranium mineralisation, have been
identified within the project area and are spatially associated with electromagnetic conductors, radiometric anomalies and
elevated uranium-in-lake sediment samples. Recent exploration has confirmed primary uranium mineralisation at surface
at Reitenbach Lake, while petrographic analysis has validated a structurally prepared and hydrothermally altered basement
environment consistent with an unconformity-related uranium system.
Regionally, the geological setting is considered analogous to uranium systems at Eagle Point and Rabbit Lake, where
mineralisation occurs along graphitic shear zones at the boundary between Wollaston metasediments and granitoid
basement.
Figure 3: Location of the Reynolds Lake and Reitenbach Lake Uranium Projects relative to the world-renowned Athabasca
Basin, synonymous with high-grade uranium deposits, and in close proximity to existing operations, access and
infrastructure.
Maiden Drill Targets Finalised for Reynolds & Reitenbach Lake Uranium
Projects
ASX:I88
About Infini Resources Ltd (ASX: I88)
Infini Resources Ltd is an Australian energy metals company focused on mineral exploration in Canada and Western Australia for uranium and lithium.
The company has a diversified and highly prospective portfolio of assets that includes greenfield and more advanced brownfield projects. The company’s
mission is to increase shareholder wealth through exploration growth and mine development.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Des Herbiers (U) Inferred Combined Resource 162 Mt @ 123ppm U3O8 (43.95mlb)
Figure 4: Overview of Infini's portfolio of projects and global footprint.
Compliance Statement
This announcement contains information on the Reynolds Lake Uranium Project and the Reitenbach Lake Uranium Project extracted from ASX market
announcements dated 25 February 2025, 31 March 2025, 24 July 2025, 20 August 2025, 9 September 2025, 22 September 2025, 2 October 2025, 3
October 2025, 26 November 2025, 23 December 2025, 12 January 2026, 19 January 2026 and 28 January 2026 and reported in accordance with the
2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market
announcements are available to view on www.infiniresources.com.au and www.asx.com.au. The Company is not aware of any new information or data
that materially affects the information included in the original market announcement.
This announcement contains information regarding the Des Herbiers Mineral Resources Estimate extracted from the Company’s Prospectus dated 30
November 2023 and released to the ASX market announcements platform on 10 January 2024, reported in accordance with the 2012 edition of the
“Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The Company confirms that it is not aware
of any new information or data that materially affects the information included in any original announcement and that all material assumptions and technical
parameters underpinning the estimates in the original market announcement continue to apply and have not materially changed. The original market
announcements are available to view on https://infiniresources.com.au and www.asx.com.au.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Statements regarding I88’s plans with respect to its mineral properties
and programs are forward-looking statements. Such forward-looking statements/projections are estimates for discussion purposes only and should not be
relied upon. Forward-looking statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved. There
can be no assurance that I88’s plans for development of its mineral properties will proceed as currently expected. There can also be no assurance that
I88 will be able to confirm the presence of additional mineral resources, that any mineralisation will prove to be economic or that a mine will successfully
be developed on any of I88’s mineral properties. I88 does not make any representations and provides no warranties concerning the accuracy of the
projections and disclaims any obligation to update or revise any forward-looking statements/projections based on new information, future events or
otherwise except to the extent required by applicable laws. While the information contained in this report has been prepared in good faith, neither I88 or
any of its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy,
completeness or correctness of the information, opinions and conclusions contained in this announcement.
Share your feedback
Discover